水塔的形式 的英文怎麼說

中文拼音 [shuǐdexíngshì]
水塔的形式 英文
types of water towers
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 4次方是 The fourth power of 2 is direction
  • : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
  • 水塔 : [土] water tower
  1. When their experience grow up, their motive of inquiry is the main driving force of knowledge construction. secondly, the course of recognition can be analyzed from linear way, then we can say it consists of gestalt formation, schematizing and theory building

    該模型告訴我們,在獲得經驗和具體事例基礎上,主體進入第一種知識建構階段,即格成,然後進入圖化,最後是理論建構。
  2. On base of 30 years of engineering practice, the author summarized selection and design of preheater tower of nsp cement plant, and analysed the application area and the strong points and short comings of all style of structures under different cnodition

    結合近30年工程實踐,總結了新型干法泥窯窯尾架設計結構選型,分析了在不同背景條件下窯尾架各種結構適用范圍和性能特點。
  3. In order to resolve the question, in the thesis a simulation arithmetic of hydro - electrical system is put up. the equations of hydro - electrical system are divided to two parts, one of which consists of the differential equations of conduit system, hydro turbine and generator ' s rotator and is solved by characteristic equation arithmetic, the other of which consists of the differential equations of generator, magnetic system and grid and is solved by longge - kuta arithmetic or covert integrated arithmetic. through the alternative solving of the two parts, the simulation results of the large - disturbance transient could be abstained eventually

    為解決這一問題,本文提出了一種將力系統和電力系統方程交替求解電系統聯合模擬演算法,即將包括輸系統、輪機以及機組轉子等部分力系統差分方程作為一部分,將包括同步發電機、勵磁系統以及電網等部分電力系統微分方程或差分方程作為另一鄭州大學工學碩士論文部分,對前一部分採用特徵線法求解,對后一部分根據模型採用龍格一庫法或隱積分法等演算法求解,這兩部分求解過程交替進行,最終即可得到電系統大擾動過程模擬結果。
  4. A new bridge structure cooperated by the single - towered cable - stayed structure and the rigid frame structure was presented. many aspects of jinma bridge are researched and analyzed, such as the design method, configuration of the superstructure, section choice of the tower, design and construction methods of the deep - water bases, the stiffness of the cooperated rigid frames, strengthening way in the tower. it is concluded that this new structure is the economical, aesthetic and suitable project for the large - span situation

    主要內容和結論如下: 1 、提出了獨斜拉橋與兩側剛構相連接新型協作體系斜拉橋結構,並對該橋方案比選、設計思路、橋面系結構柱截面設計、深基礎設計及施工方法、協作剛構剛度選取、直束加固等方面作了詳細地計算分析和比較。
  5. The 31 - year - old join villarreal on loan in 2005 from the old lady, a transfer which he would have never agreed to had it not been for the pieris tactician ' s presence at the club

    31歲於2005年夏天以租借加盟黃色潛艇,這是一樁在沒有卡佩羅插手情況下,不可能發生轉會
  6. Hotel wall, which is composed of eight banyuexing four main tower foundation and composition, appearance fake maitreya ; one of the four major tourism node adjacent dongguan - hidden yin villa scenic places for tourism, respect their 1, 800 acres hidden yin villa landscapes pastoral scenery, european style architectural theme and charming scenery constitute an unlimited charmed ; hotels have over 200 unique among chinese culture and fine luxury hotel suite and a chinese meal, western - style food, japan meals, leisure us, multifunctional conference room, " dream night " song and dance theatre, xianquan massage rehabilitation centres, swimming pools and other facilities

    酒店依山傍,它由八層半月主樓及四層裙樓組成,外型仿彌勒佛毗鄰東莞四大旅遊景區之一隱賢山莊旅遊風景區,尊享1800畝隱賢山莊山田園風光,歐陸風范主題建築和迷人自然風光構成令人無限神往酒店擁有200多間獨具中國文化特色豪華客房及精品套房,並設有中餐西餐日餐休閑吧多功能會議室「夢之夜」歌舞劇院仙泉桑拿康復中心游泳池等配套設施
分享友人