水害斷道 的英文怎麼說
中文拼音 [shuǐhàiduàndào]
水害斷道
英文
railroad break down due to flood-
( 2 ) taking the geology analysis as main way and combining the pre - test, predicating the tunnel ' s main geology condition ( rock quality, surrounding rock classification, long - wide joint, fault, ground water, crustal stress ), and predicating the main potential disaster ( collapse, breaking water, rockburst, large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field, finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot, and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel
通過地質分析、類比分析、監控量測、數值模擬、神經網路等方法,對鷓鴣山隧道潛在的主要地質災害(塌方、涌水、巖爆和大變形)進行了預測預報( 3 )在現場地應力測試成果的基礎上,運用數值計算進行應力場反演,基本查明了沿隧道軸線剖面的地應力分佈規律:地應力量級在最大埋深附近達到最大值24mpa ,並預測k2 + 260 k3 + 000段將很可能成為鷓鴣山隧道的高地應力段。 ( 4 )塌方往往與斷層破碎帶及千枚巖相聯系。Through analyzing the 324 highway ' s partial cement concrete road surface, sloping slurry, escapes spatial, bridge head jumps off, roadbed subsidence and so on, the grouting technology is proposed
摘要分析某國道路段部分水泥混凝土路面斷板、唧泥、脫空、破碎及橋頭跳車、路基沉降等主要病害,提出採用灌漿技術來解決。Thames water pipe ( 2. 2 m ) suffered three damages along the pipeline asymmetrically spaced around the fault in kocaelie earthquake, and the shigang water pipe ( 2. 0 m ) suffered two damages along the pipeline symmetrically spaced around the fault in ji - ji earthquake. the failure performance of these two damage cases for large diameter steel pipelines are much different form each other because of the different types of fault movements as well as the type of soil condition on both sides of fault ( kl k2 and kl = k2 )
利用本文所提出的殼有限元模型,對兩類埋地管道通過斷層的實際震害進行了模擬:第一類是在供水管網系統中占據重要位置的大口徑鋼管的震害,土耳其地震和集集地震分別都有這類管子的震害;第二類是以往震害資料很少的pe管在集集地震中的震害。
分享友人