水工模型試驗 的英文怎麼說

中文拼音 [shuǐgōngxíngshìyàn]
水工模型試驗 英文
hydraulic mode test
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 水工 : irrigation works; water conservancy project水工結構 hydro structure; 水工模擬 hydraulic analogue;...
  • 模型 : 1 (仿製實物) model; pattern 2 (制砂型的工具) mould; pattern3 (模子) model set; mould patter...
  • 試驗 : trial; experiment; test
  1. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量程經的基礎上,結合蓮花電站在1995年及1996年導流渡汛程措施設計及水工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施期渡汛及壩體填築分期、圍堰設計以及施方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為程建設提供一定的參考。
  2. By hydraulic modeling, this paper describes studies on the stability of a floating bulkhead operating in standing water and flowing water, and it ' s hydrodynamic stability characteristics that distinguish in standing water from in flowing water ; and direct measurements of the forces acting on the model floating body during floating and sinking is taken. as a result, the rotation stress curves are produced and analyzed ; to provide data for optimum operation schedule analyses of the sluice, the relationship of the impact forces acting on the side wall of the gate and the running speed is studied ; the reasons of unstably uplifting of the bulkhead are discussed and the method to solve the problem is also given in this paper

    本文結合常州新閘防洪控制水工模型試驗,系統分析了浮箱門在靜和動中的穩定性及其影響因素,指出靜穩性和動穩性的不同特點;測定了浮箱門動運行時的受力情況,給出並分析了定位過程轉動力的變化過程曲線;根據浮箱門啟閉速度與門體和岸墻之間撞擊力大小的關系,選擇合理的動力設備,為設計和程實踐提供可靠依據;分析浮箱門難以穩定上浮的原因,並給出解決方案。
  3. Hydraulic model test of spillway in baiyinhua reservoir

    白音花庫溢洪道水工模型試驗研究
  4. On the basis of predecessor work, the thesis developed fem program of the pile under lateral load, which is based on winker ground model, and m method is introduced into fem program. the calculation values is closed to the results of field and laboratory model experiment, the finite elment method is verified

    在前人所做作的基礎上編制了基於文克爾地基的有限元計算程序,將平承載樁的「 m法」引入計算程序中,並用現場資料和本文的結果與數值計算結果進行了對比,結果表明較為吻合,證了程序分析pcc樁平承載的正確性和可靠性。
  5. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河庫供程取頭部由引渡槽、節制閘、進閘、泄閘等建築物組成。由於本程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內流流態是否滿足要求,需要經過進行論證,以確保程的可靠性。旁通管具有上與泄要求,對其過流能力也要經確定,為碧流河庫增建旁通管設計提供依據。
  6. The incident wave height h1 / 3 is in the range from 0. 1m to 0. 25m, and the peak period tp in the range from 1. 0s to 2. 0s. the ratio of s / h1 / 3, which refers to the subface level of wharf deck ( s ) to the incident wave height ( h1 / 3 ), is between - 0. 1 and 0. 7. three different shore connecting types : open - piled, permeable slope with armored 1ayer of dolosse b locks and impermeable slope with armored layer of concrete plate, are set in the experiment for the research on the effects of boundary condition with different shore connecting types on the wave impact

    本文的物理在大連理大學海岸和近海程國家重點實室的大波流槽中進行,中選用的隨機波靶譜為改進的jonswap譜,入射波波高h _ ( 1 / 3 )范圍為0 . 1m 0 . 25m ,譜峰周期t _ p范圍為1 . 0s 2 . 0s ,碼頭面板的相對凈空(碼頭面板底面距離靜面的距離s與入射波波高h _ ( 1 / 3 )的比值)范圍為- 0 . 1 0 . 7 ,其中s / h _ ( 1 / 3 )為負值時表示碼頭面板底面位於靜面以下。
  7. Abstract : through a series of hydraulic model tests for researching actual power tunnel operation, a conclusion is reached that in order to get a better flow pattern the profile of the wate - carrying structure should be adapted to the variation of water streamline shrinkage, flow velocity and pressure intensity. the configuration and dimension of the kinetic energy dissipator should be selected carefully to make the water tunnel safe and reliable at different levels of diversion dischage

    文摘:針對實際程中的發電引隧洞運行的各種況進行了水工模型試驗研究,指明要獲得良好的流流態,過建築物各部位結構輪廓的造應適應流流線的收縮、流速及壓強的變化;為使引隧洞在各級引流量下能安全可靠地運行,需慎重確定洞內消能的體形和尺寸。
  8. The researches including discharge capacity, pressare properties, cavitation characteristics at some key positions, hoisting load of the gate, configuration of energy dissipator at the exit dentated - sill, and downstream scouring were performed by hydraulic model tests

    藉助系列水工模型試驗布埡放空洞的泄流能力、壓力特性及關鍵部位的空化特性、閘門啟閉力、出口鼻坎消能及下游沖刷等進行了較深入的研究、分析。
  9. Experimental research on the hydraulic model of tangjiawan reservoir ' s flood - discharge tunnel

    唐家灣庫泄洪洞水工模型試驗研究
  10. The main factors which affect the hydraulic characteristics of mhsj are studied by the model test

    利用水工模型試驗,研究了影響其力特性的主要因素。
  11. In view of this problem, this paper curries out serials of hydraulic model test to fine out the mechanism of effect of roughened apron extension upon energy dissipation and erosion control

    因此,本論文針對這一問題,進行了一系列水工模型試驗以分析研究海漫加糙對消能防沖影響的機理。
  12. This study collected and discussed the results of three hydraulic model tests of long period oscillations in hwa - lien harbor, conducted by center of harbor and marine technology in 1996, 1997 and 2000

    摘要本文綜合港灣技術研究中心於1996 、 1997及2000年所執行有關花蓮港港池振蕩的研究計畫水工模型試驗成果部份,進行匯整及討論。
  13. Based on the moveable - bed model tests and some relative studies, it is found that the proposal reservoir for the hongshiyan hydropower station will be a heavy deposit reservoir, its sand - flushing sluice could not effectively de - silt and serious hidden - troubles exist in its diversion tunnel

    摘要待建的紅石巖電站庫屬嚴重淤沙庫,通過動床水工模型試驗和有關研究分析發現,其沖沙閘排沙效果不理想,引隧洞存在進沙嚴重的隱患。
  14. Abstract : variation of flow condition caused by the multi - pur pose regulation schemes has been investigated on the basis of measured date in r iver model. flood - control of the upper river, operation of the power - station, saf ety of the bridge and power - station, navigation and evolution of the river are a nalyzed. a reasonable and feasible project alternative and the improvement measur ement are proposed

    文摘:涪江潼南河段防洪整治是一項以防洪為主體的綜合性河岸整治程,在平面二維數值擬計算的基礎上再進行河,比較分析各防洪整治方案下潼南河段流條件的變化,及其對上游防洪、河道、大橋、電站、航運、河勢的影響,提出合理可行的程方案
  15. The content in this paper is preparatory attempt that combines image technique and gas water field measurement technology. this research make strong base for the further application of image technique in two phases flow of gas - water and has significant learning and practicable value

    研究成果為今後進一步深入研究和推廣計算機圖像處理技術在氣兩相流測量中的應用,打下了有力的基礎;對提高流摻氣濃度的測量平和精度,進而提高平、滿足程設計要求等都具有學術意義和重要實用價值。
  16. A series of hydraulic model experiments of water flow, head losses and flow state in reservoir under various conditions are carried out for the design of the dashuzi pumped - storage plant

    摘要本文結合大樹子抽蓄能電站下庫進出任務,對側式短進出口在不同況下的流速分佈、頭損失、庫區流態等流特性進行了研究。
  17. Dilution and dispersion in constant horizontal flow and bottom multi - port discharging was studied in accordance with the hydraulic model test. the influence of diffusion parameters ( jet angle, jet velocity, number of nozzle, riser space ) and environmental parameters ( water depth, water velocity ) on dilution were analyzed. the experimental results show that environmental parameters have prominent effects on wastewater dilution and dispersion, in addition to that, diffuser design parameters have significant influence on wastewater dilution and dispersion. for bailonggang outfall zone, jet angel is 10 or so, nozzle number is 16 or so

    藉助於人,分析了恆定橫流底部多孔排放時擴散器設計參數(射流角度、射流速度、噴口個數) 、上升管間距)及環境參數(環境深、環境流速)對污近區稀釋擴散效果的影響,實結果表明,除了環境條件對污稀釋擴散效果影響明顯之外,擴散器設計參數對污的近區稀釋擴散也有顯著的影響,針對白龍港排放口域,噴口射流角度宜控制在10左右,噴口個數取16個
  18. Abstract : based on the results of hydraulic model test and remote - control ship model, the unsteady flow characteristics in the downstream approach channel and the reaches from three gorges project to gezhouba project and navigation conditions in these reaches during the tgp flood - discharge are analyzed. the measures of raising navigation discharge level and improving navigation conditions are given

    文摘:根據水工模型試驗成果,分析了三峽程泄洪時壩下游引航道和兩壩間河段(三峽至葛洲壩)的非恆定波流運動特性,結合遙控自航船對兩壩間的通航流條件進行了分析評價,並提出了提高通航流量標準、改善通航條件的相應措施。
  19. As an inlet structure, the forbay is an important part of the pumping station. the pressurized forbay, close in top structure, is a kind of particular forbay in which water is pressurized. based on the integral hydraulic model test of shanghai changqiao waterwork ' s water - transport pumping station, some research on the hydraulic characteristics of the pressurized forbay has been done in the paper. the main content is listed as follows : l. the hydraulic characteristics of the pressurized forbay in different water supply combination and different pump unit combination without divertion measure, and the reason of the poor flow state. 2. the hydraulic characteristics of the pressurized forbay with diversion pier, and the reason why the flow state can be improved. 3. the experimental research on the critical air suction condition of the pressurized forbay

    本文基於上海長橋自來廠改造程送泵站整體,對有壓前池的力特性進行了研究,研究的主要內容如下: 1 、無導流措施的有壓前池在不同供組合及不同機組開機組合條件下的力特性,並分析了流態較差的原因; 2 、加設導流墩後有壓前池的力特性,以及加設導流墩流態改善的原因; 3 、有壓前池進氣臨界條件的研究; 4 、泵進氣以後泵性能的討論。
  20. Based on the test result of hydraulic model of a project, this paper analyzes the influences of gate operation during operating period, combined operation of hydro - generation sets and the length of guide wall on navigable flow condition in entrance area, and proposes the operation mode of the hydro - junction for improving navigation flow condition

    摘要根據實際程的水工模型試驗資料,分析樞紐程運行期的閘門調度、機組組合運行和導航墻長度對口門區通航流的影響,提出改善通航流條件的樞紐運行方式。
分享友人