水庫測量 的英文怎麼說

中文拼音 [shuǐliáng]
水庫測量 英文
reservoir survey
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 水庫 : reservoir水庫岸防護林 reservoir bank protection forest; 水庫測量 reservoir survery; 水庫出流量 ou...
  • 測量 : measure; survey; gauge; meter; measurement; measuring; surveying; mensuration; metering; gauging;...
  1. They are jinfo mountain in nanchuan county ( natural protection section ), wuling mountain in qianjiang county ( national emphases forest demonstration county which forest cover rate is beyond 50 % ) and zhongliang mountain in beibei county ( artificial destruction is very grave ). some main land use patterns i. e. woodland, garden, infield, abandon infield, shrub and grassplot are selected in those three sample sites. four aspects on soil fertility index of karst environment under different land use patterns in these three sample sites, are revealed in this paper, by using the field test, indoor measure and analysis, outdoor experiment and field investigation, and the knowledge and technique of soil, ecology, physics and chemistry etc. they are physical characteristic ( effective soil thickness, organic layer thickness, soil texture, water - stable aggregate and soil water etc. ), chemical fertility ( organism, omni - n, omni - p, omni - k, alkali - nitrogen, available p, available k and rapid available k etc. ), soil animalcule ( bacteria, fungi, actinomyces and their grosses ) and soil - seed - pool ( plant community diversity index ) in karst ecosystem

    本研究以重慶市的南川金佛山(自然保護區) 、黔江武陵山(國家重點退耕還林示範縣,森林覆蓋率50以上)和北碚中梁山(遭人為破壞嚴重)典型巖溶區為對象,選擇了幾種重要的利用方式,包括林地、果園、耕地、棄耕地和灌草坡,採用野外巖溶生態調查和室內試驗分析相結合的方法,以不同土地利用方式巖溶土壤肥力為重點,對不同土地利用方式土壤肥力特徵進行化分析,找出巖溶土壤肥力差異的主要方面及其根本原因,論文主要從土壤剖面物理退化指標(有效土層厚度、有機質層厚度、質地、團聚體、分含等) ,化學肥力退化指標(有機質、全n 、全p 、全k 、堿解n 、速效p和速效k等) ,樣地土壤微生物指標(細菌、真菌、放線菌數及總)以及樣地土壤種子植物群落多樣性等4個方面對重慶典型巖溶區的土壤肥力特徵進行了較為詳細的分析研究,為巖溶地區士壤資源的合理利用及結構的調控管理提供依據。
  2. Examination questions ' storehouses, which is about manipulative skills of customtailoring workers in apparel design, whose quality standard must be united, whose applied ability principles must best strengthened, and whose content and structure must be checked in designing appraise details of essential elements measure module ( appraisable particle ) check examination questions ( check item ), and take form united 、 norm 、 optional and open - ended the examination questions ' storehouse so that appraised and checked qualith of the manipulative skills can be guaranteed

    摘要服裝設計定製工操作技能試題必須堅持統一質平、強化適用能力的原則,通過設計考核內容結構鑒定要素細目模塊(鑒定點)考核試題(考核項目) ,形成統一、規? 、可選、可擴充的服裝設計定製工操作技能試題,以保證服裝設計定製工操作技能鑒定考核的質
  3. The dissertation has upstanding reference value to underwater geomorphological measurement system, for instance reservoir region, lakes, as well as measuring the flotage and underwater precipitation

    本論文對於、湖泊等下地形地貌具有良好的參考價值,也可用於海洋探及對中漂浮物或下沉澱物的
  4. Application of gps rtk to survey relief map under water of zhaopingtai reservoir

    技術在昭平臺下地形中的應用
  5. So as the enter point of the stream, the income of the reservoir, the time of the flood peak lasted, the quantity of sandiness income and the strobe of the darn. we must do some work to forecast and watch the different density stream. by experiments, we made out that it is impo rtant for us to reduce the water lever in work of the river belongs lots of sandiness

    從異重流試驗看,在正常運用下,產生泥沙異重流的機率較大,能否運動到壩前排出外,還要看異重流潛入點位置、入、洪峰歷時、入含沙閘門運用等因素,需要做好異重流預報監工作。
  6. The daling river is a river of much bedload. the average of the loss sand can reach 21434. 3 thousandston, and the ratio is 18. 08 kg / m3. to this day, the ratio of sandiness by measuring in the biggest broken surface is 172 kg / m3. the baishi reservoir lies in the city named beipiao which in the middle reaches of the daling river in liaoning province, the income of the reservoir from the trunk stream is 11457 thousandston, and from the branch of the river is 1160 thousandston

    大凌河是個多沙河流,多年平均懸移質輸沙可達2143 . 43萬噸,平均含沙為18 . 08kg m ~ 3 ,實最大斷面含沙為172kg m ~ 3 ,白石位於大凌河中游的遼寧省北票市,年入,幹流為1145 . 7萬噸,支流?牛河為1160萬噸。
  7. First, according to measured data and literature, the river channel evolution rule and its reasons in the southern branch of the yangtze river are discussed from the perspectives of historic evolution, recent evolution and the tendency prediction of river channel evolution. besides, the local reservoir has been studied from the changes in thalweg and section as well as the calculation of local erosion and deposit. consequently, the stability and feasibility of reservoir construction in the river section are approved

    首先根據大資料及文獻資料,就歷史變遷、近期演變、河演趨勢預等方面,初步探討了長江口南支河段河道演變規律及原因,並具體就深泓線的變化、主槽斷面變化、局部沖淤計算等方面對擬建局部區域進行了分析,論證了工程河段建設的穩定性及可行性。
  8. Air is entrained as water jetting into water cushion pool, the gas - liquid two phase flows field are formed. the every phase velocity field are measured by using piv and ptv ( particle tracking velocimetry ) method in the course of jet angle 75and60 in gas - liquid flows of water cushion pool. image house of two phase flows are set up

    西安理工大學碩士學位論文使用數字圖像處理技術中的piv和ptv速技術就射流入角75度和60度兩種情況分別墊塘模型氣兩相流流場的各相速度場,建立了相應的兩相流流態圖像
  9. Surveying setting - out of distorted face for right dam abutment in yushi reservoir

    玉石右壩頭扭曲面開挖的放樣
  10. In order to resolve this problem and realize the automatic management, the pol research institute of general logistics department, pla developed the automatic oil tank gauging system based on lonworks technology and put it to use

    為了解決部隊油罐勞動強度大,方法落後的問題,提高油自動化和信息化管理平,總後勤部油料研究所立項研究了「基於lonworks現場總線技術的油罐管理系統」 。
  11. The oil loading system and the management of oil bin in the oil - bin area is intensive and the measurement method is under - developed at present time. in order to resolve this problem and realize the automatic management, this thesis analyzed the demands of the system, and then integrated the optical fiber sensing technology, the advanced computer technologies of hardware and software, the technologies of intelligent instrument, auto - control and communication ; finally a distributed and intelligent monitoring system of the automatic oil - loading system was developed. the thesis contains hardware design, software design and communication design

    為了解決罐區裝車手動付油與油罐手工檢尺勞動強度大,方法落後以及油安全性要求非常高的問題,提高油自動化和信息化管理平,本文從監控系統用戶需求與功能分析入手,結合當前飛速發展的光纖傳感技術、計算機軟體、硬體技術、智能儀表技術、自動控制技術和通訊技術,開發了一套用於石化行業的基於光纖傳感技術的集自動付油管理及儲油液位、溫度等安全檢功能於一體的油罐區自動付油管理系統。
  12. According to the fact of the engineering, the optimal modeling when fenhe first reservoir operated alone are first made. after getting the regularity, in order to consider fenhe second reservoir that had been finished essentially and shanxi wanjiazhai yellow river diversion project, not only the object of minimum water shortage for satisfying the water use demanded mainly by user are founded, but also the object of minimum the reservoir deposition was found. in order to prevent the water use demanded by city and industry from excessively concentrated water shortage, the object of minimum water shortage required to be the equable shortage

    本文在對來分析基礎上,對太原市需的用進行了預,結合工程實際,先對汾河一單獨運行時進行優化模擬,得出規律后,考慮已基本完工的汾河二及引黃南干工程,建立了以滿足用戶用為主要目標的「缺最小」目標和減少淤積的「淤積」最小的目標,其中「缺」最小目標要求是均勻的短缺,避免過分集中而影響了城市及工農業用
  13. The digital map is usually formed by the water depth ' s database measured on the seabottom. because of the disadvantage that the database is kept secret, this dissertation introduces a new method : first, the depth data are picked up from the electronic chart, then interpolation of the depth datum by kriging algorithm is adopted to gain the digital map. the method is the precondition of the terrain matching when it is researched by simulation, and it is the complement of the database

    通常數字地圖都是通過海底的海底深數據來形成,針對深數據存在保密性等特點,本文提出了一種從電子海圖提取深數據,然後採用kriging方法進行插值形成數字地圖的方法,該方法是進行地形匹配模擬研究的前提,而且它也是海底深數據的一個補充。
  14. Coking products - determination of moisture content - microcoulomb method

    焦化產品分含的微定方法
  15. Combing the linear seepage model with hydrogeology in the region of zhong - liang reservior, the analysis of the problem of positive and negative is emphasized. make use of with some observing information of boreholes in this region, adverse seeking the hydrogeology of the reservoir in the region with finite element method, the leakage quatity of karst water in the region of reservoir is forecasted.

    線性滲流模型結合了中梁文地質條件,重點進行正反問題的計算分析,利用研究區若干觀孔資料,採用有限單元法反演區的文地質參數,並預區巖溶滲漏
  16. Sync on time in underwater topographic measurement using navigation signal from gps receiver

    實時動態在故縣下地形中的應用
  17. Construction survey technology for upper reservoir of zhanghewan pumped storage power station

    張河灣抽蓄能電站上施工技術
  18. Application of gps - rtk cooperating with depth sounder in huangbizhuang reservoir underwater survey

    配合深儀在黃壁莊中的應用
  19. On the basis of anatomizing the condition of hydrogeology with zhongliang water resources and power engineering, combined with the data analysis of flux with surface water, aquatic chemistry, and experiment of tracing, the condition of karst leakage in the region of reservoir is educed. the concept of reservoir leakage with these information is put forward, the leakage quantity of karst water in the region of reservoir with the method of water equilibrium is applied

    在仔細分析中梁電工程文地質條件的基礎上,結合地表流資料、化學分析資料及示蹤連通試驗資料,得出區巖溶滲漏條件,並在此基礎上提出滲漏概念模型,採用均衡法計算出區的巖溶滲漏
  20. When the soil water properties and soil water - storage was studied with traditional statistic method, samples were entirely independent and obeyed normal distribution, not taking into account spatial relative of sampling location

    在用傳統統計方法分析土壤分特性和土壤時,根據finsher統計原理假設樣本之間完全獨立且服從正態分佈為前提,不考慮定位置的空間關系。
分享友人