水工程調查 的英文怎麼說

中文拼音 [shuǐgōngchéngdiàozhā]
水工程調查 英文
water-project investigation
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 調 : Ⅰ動詞1 (配合得均勻合適) harmonize; suit well; fit in perfectly 2 (使配合得均勻合適) mix; adju...
  • : 查名詞1. [植物學] (山查) hawthorn; haw2. (姓氏) a surname
  • 調查 : 1 (為了解情況進行考察) investigate; examine; inquire into; look into; survey; (try to) learn ...
  1. In view of the natural conditions in loess area of gansu, in the light of investigation conditions of seepage of built loess and weak rock highway tunnels in this area and classification of water gushing conditions for railway tunnels, and by engineering analogism, the classification of tunnel water gushing types suited the structure design of highway tunnel waterproof and drainage, and the three methods for checking and subdividing water gushing types are presented

    摘要針對甘肅黃土區的自然條件,依據該地區已建黃土及軟巖公路隧道滲漏調情況和鐵路隨道涌狀態分類,運用類比法提出適合該地區公路隧道防排結構設計的隧道涌類型劃分及對涌類型校核與細分的三種方法。
  2. On the basis of field investigation and a lot of tests, the paper detailed researches the engineering geology properties of xigeda filling material. the distinction of the modulus of resilience was analyzed, and the influence of the intrinsic factors including moisture content, dry density, mudstone content and the external factors including compaction mode, paving thickness were adequately discussed. based on the researching how various factors influence the road compaction effectiveness, the author studied the relationship between modulus of resilience and roadbed compaction quality index, connected the compactness with modulus, and listed the data of the modulus in the various compaction area

    基於此,本論文在大量現場調、室內外試驗資料基礎上,詳細研究了昔格達填料的地質性質;通過路基回彈模量特徵的研究,充分闡述了含量、干密度、泥巖含量等「內因」 ,及壓實方式、松鋪厚度等「外因」對路基模量值的影響;在分析眾多因素對路基壓實效果影響的基礎上,開展了回彈模量與路基壓實質量指標間關系的研究,進而把現場壓實度與現場回彈模量有機的聯系起來,給定了不同壓實區間對應的模量值。
  3. I also summarized briefly the qualifications for tender agency, factors which would block the development of tender agents and the countermeasures, a nd anticipated the foreground of its development in water conservancy systems of hebei province, and then, i advanced my suggestion on the standardization of tendering and bidding procedures in the relevant projects ; i also analyzed the insufficiencies of decision - making system, documents study and circumstances research in the tenders. at the same time, i introduced the skills and strategies in the tendering and bidding, and advanced my analysis results and suggestions. through the introduction of the procedure from opening to evaluating and deciding the tenders, and the scores registration method on evaluating tenders, i pointed out the status quo and main problems occurred in the tendering and bidding in the construction of water conservancy projects in hebei province, and put forward my suggestion on the system of opening, evaluating and deciding of tender in the projects

    在對招標人、招標代理機構和招標過的法律規定與分析后,指出河北省建設招標人和河北省建設招標代理機構的現狀及存在問題,提出了市場經濟條件下,最合理的招標組織形式為招標代理,並簡述了招標代理機構的資格要求、河北省建設管理機制中阻礙招標代理機構順利發展因素及對策,預測了招標代理制度在河北省利系統的發展前景,對進一步規范河北省招標活動提出建議;對投標過中存在的投標決策、招標文件研究、投標環境調不足之處進行了分析,同時介紹了河北省建設投標報價技巧及策略,對河北省投標活動現狀及存在問題提出規范化的分析和建議;通過對開標、評標、定標運行序和河北省評標計分辦法的介紹,指出了河北省建設招標投標定標運行的現狀和存在的問題,提出了河北省建設開標、評標、定標運行體系的建議。
  4. Through investigating the statistic data of supplying and utilizing water past years, the actuality of supply engineering, the actuality of drain engineering and waste water disposal in tangshan urban, this study analyses the available water quantity cisborder and outside and water environmental actuality in order to afford basic data for the optimization distribution of limited water resources in cantonal city

    如何使得有限的資源發揮最大效益即稱為亟待研究的關鍵問題,因此本論文針對唐山市資源優化配置做了如下研究。通過調唐山市歷年供用統計資料,給現狀、排現狀以及污處理情況,分析市區可利用的境內外資源總量和環境現狀,為市區有限資源的合理規劃配置提供現實基礎。
  5. The crackings occurred on the retaining wall and side piers of a flood gate during construction and the causations are investigated, inspected and analyzed, and then the relevant control measures are put forward based on the endangering degree from the cracks on the structure ; by which the normal operation function of the gate is guaranteed

    摘要針對某在施中擋墻及邊墩產生的裂縫,進行了裂縫特徵的調、檢測和引發裂縫原因的分析,並根據裂縫對建築物的危害度,提出了相應的控制措施,較好地保證閘正常運行的功能。
  6. Relating closely to the main problem of the high sidewall and wide span underground cavities excavation stability of xiluodu hydroelectric project, the evolution characters of geo - stress field in deep - cutting gorge and the whole features of the stress field, strain field and plastic failure zone around the underground chambers after excavation are studied systematically in the dissertation, based on a great deal of data gathered in field investigation and taking the flac3d v2. 0 software as basic computation tools. meanwhile, in the course of research, the new methods of dynamic numerical simulation are summarized and applied. furthermore, the effects of rock mass qualities, initial geo - stress field and excavation procedure on surrounding rock mass stability are discussed

    本文緊密結合溪洛渡大跨度、高邊墻復雜地下廠房洞室群,施開挖過中和開挖后圍巖穩定性研究這一重大課題,在詳盡的野外地質調作和對大量基礎地質資料的整理與分析基礎上,以目前國際地質界公認的最新通用軟體flac ~ ( 3d ) 2 . 0版作為基本計算具,從整個壩區地應力場的研究開始,通過動態數值模擬分析這一新的模擬思路,系統地研究了深切峽谷區地應力場多階段的特徵和演變規律,進而對左、右岸地下廠房洞室群開挖全過中圍巖應力場、變形場和塑性破壞區的變化特徵,進行了全過動態數值模擬研究,並詳細討論了圍巖質量、初始地應力場、施開挖順序對大型地下洞室群圍巖穩定性的影響。
  7. By surveying the sample plot, the relations between the stabil ity of the mountai n slope of soil preparation for planting by using explosion and other factors s uch as precipitation, terrain , were studied. by using the method of quantitative t heory i, the interrelation between the damaged degrees of soil preparation progra ms by using explosion in low mountain area with abundant precipitation and terrain factors was systematically analysed, and the mathematical models relate d were developed. the results show that the precipitation in early days and the m aximum precipitation per day are the primary factors causing the soil prepara tion program damaged. the main terrain factors of the mountain slope that affect the program stability are according to their importance, slope, position and dir ection. the suitable mountain slope for soil preparation by using explosion is th e slope of less than 25

    通過典型標準樣地調資料,探討了造林爆破整地的坡地穩定性與降、地形等因子的相互關系,應用數量化理論,對在有充分降條件下的低山丘陵區的爆破整地損失度與地形因子之間的關系進行了系統分析,並建立了相應的數學模型,研究指出,充分的前期降和日最大降雨量是引起爆破整地損失的激發因素;影響爆破整地穩定性的主要地形因子是地面坡度,其次為坡位、坡向,實施爆破整地的地面坡度以不超過25為宜。
  8. Furthermore, on the basis of consultancies, inquiries and evaluations from multiple sources, the model for predicting soil and water loss in dandong - zhuanghe highway construction is developed. moreover, considering the characteristics of the highway, the covering area of the project is divided into three parts such as main body area, soil - fetching area and soil - spoiling area. for these three preventive areas, the perfect precaution measures for preventing and curing the soil and water loss during the road construction in which a number of vegetal cover measures are taken

    論文中詳細調並介紹了項目情況及沿線自然、社會經濟狀況;收集研究了公路建設項目土流失預測的基本內容和方法,在多方詢、請教專家及分析研究的基礎上,提出了丹莊高速公路土流失預測模型,針對項目不同區域進行了土流失預測和分析,為土保持措施的設計提供了定量依據;論文根據高速公路項目的特點,將丹東至莊河高速公路項目區分成了主體、取土場、棄土場三個土流失防治區,並在初步設計文件的基礎上,針對三個土流失防治區進行了較為完善的土保持防治措施設計;論文在丹東至莊河高速公路土保持方案設計中大量採用了植被防護措施,為了更有力地指導植被措施的施,論文中還就植被保持土的有效性進行了研究探討。
  9. Methods of soil investigations for agricultural water engineering - field tests - part 7 : determination of infiltration rate by double ring infiltrometer

    農業中土壤調方法.野外試驗.第7部分:用雙
  10. Abstract : based on investigations on highway construction projects in chongqin city and guizhou province, the environment impact characteristics of highway constructions were analyzed. some shortages in eia and environmental management were analyzed and several new environment management opinions were put forward : 1. carring out dynamic management with whole procedure of highway construction ; 2. paying attention to separating effect to wild animals, landscape resources conservation, environment supervision during construction period, ecological benefit, and providing more environmental data ; 3. handling the envionmental problems with new techniques in the expressway construction ; 4. broadening the knowledge in environment of highway workers and environmental managers and raising the level of education

    文摘:根據對重慶市和貴州省已建和在建高速公路建設項目環保作的實例調,剖析了公路建設項目環境影響的全過性特點和現行環保管理作的不足,提出高速公路環境保護管理的新思路和新建議: 1 )實行全過動態管理; 2 )深化環境影響評價作,在環評中注意阻隔作用,景觀保護,施期環境監控,環境恢復措施講求綜合生態效益以及提供盡可能多的環境信息; 3 )注意公路建設的技術進步,並應用新的技術解決環境影響問題; 4 )提高公路建設者和環保管理者的環境知識,環保思想及文化意識平。
  11. Based on investigations on highway construction projects in chongqin city and guizhou province, the environment impact characteristics of highway constructions were analyzed. some shortages in eia and environmental management were analyzed and several new environment management opinions were put forward : 1. carring out dynamic management with whole procedure of highway construction ; 2. paying attention to separating effect to wild animals, landscape resources conservation, environment supervision during construction period, ecological benefit, and providing more environmental data ; 3. handling the envionmental problems with new techniques in the expressway construction ; 4. broadening the knowledge in environment of highway workers and environmental managers and raising the level of education

    根據對重慶市和貴州省已建和在建高速公路建設項目環保作的實例調,剖析了公路建設項目環境影響的全過性特點和現行環保管理作的不足,提出高速公路環境保護管理的新思路和新建議: 1 )實行全過動態管理; 2 )深化環境影響評價作,在環評中注意阻隔作用,景觀保護,施期環境監控,環境恢復措施講求綜合生態效益以及提供盡可能多的環境信息; 3 )注意公路建設的技術進步,並應用新的技術解決環境影響問題; 4 )提高公路建設者和環保管理者的環境知識,環保思想及文化意識平。
  12. Abstract : according to investigation data of designing for bridge opening in china, in this paper the equations for estimating length of bridge opening have been established. the equations can be the reference for revising “ norm of investigation and design of highway engineering on hydrology ”

    文摘:根據兩次全國公路大中橋孔徑設計資料的調,對橋孔長度進行了全面分析,為《公路文勘測設計規范》制定橋長公式提供參考
  13. Class b : hydrogeology survey ; engineering geology survey ; environment geology survey

    乙級:文地質調地質調;環境地質調
  14. Class c : hydrogeology servey ; engineering geology survey ; environment geology survey

    丙級:文地質調地質調;環境地質調
  15. Class c : hydrogeology survey ; engineering geology survey ; environment geology survey

    丙級:文地質調地質調;環境地質調
  16. Class a : hydrogeology survey ; engineering geology survey ; environment geology survey

    6444794甲級:文地質調地質調;環境地質調
  17. Combined with hydrogeological information gained by exploration and hydrographical drilling, groundwater types and leakage ways under the water curtain corridor and air - cushioned surge chamber are found out, which provide the grouting engineering with more effective treatment

    結合文地質鉆探獲取得的地下文地質信息,明了電站幕廊道和氣墊調壓室滲的地下類型和滲漏途徑,為調壓室的進一步灌漿處理提供了依據。
  18. Investigation and evaluation on groundwater resources. demonstration in water search and supply. demonstration of engineering and environmental geology. investigation and evaluation of geological disasters and design of control plan

    地下資源調評價、找論證、地質、環境地質評價論證、地質災害調評價及防治規劃設計。
  19. The investigation on the running status of the projects of defluoriding drinking water and the effect of different management pattern

    河南省開封縣降氟改管理現況和不同管理模式運轉效果調
  20. This thesis combined with the commissioned scientific research about ventilation model experiment of langya shan hydropower station ’ s underground houses, first make out the history, status, development trend and existent problem of ventilation and air condition technology application in underground hydropower station at home and abroad by indexing and checking the related large quantity technology references and engineering analysis. this establish a well base for study of the model experiment

    本論文結合本院承接的瑯琊山電站地下廠房通風后續模型試驗這一委託科研課題,通過檢索、閱大量相關科技文獻和調研分析,摸清了國內外地下電站通風空調技術應用的歷史、現狀、發展動向與存在問題。為該項目模型試驗研究奠定了良好的基礎。
分享友人