水平基床 的英文怎麼說

中文拼音 [shuǐpíngchuáng]
水平基床 英文
horizontal bedding
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ形容詞1 (沒有高低凹凸 不頃斜) flat; level; even; smooth 2 (高度相同; 不相上下) on the same l...
  • : i 名1 (供人睡覺的傢具) bed; couch 2 (像床的器具、地面) something shaped like a bed Ⅱ量詞(用...
  • 水平 : 1. (跟水面平行的) horizontal;level2. (達到的高度) standard; level
  1. This paper introduces the basic structure, system composition, applicable condition, main parameters and construction procedure of the first walking underwater bed leveling machine in china, and describes the construction quality and efficiency of bed leveling in yangtze estuary deepwater channel regulation project

    摘要簡要介紹我國第一臺步履式機的本結構、系統組成、適用條件、主要技術參數和施工工藝,並對其在長江口深航道治理過程中進行的實際施工質量和工效作了說明。
  2. By the analysis and study, it is showed that : 1 ) the lower weihe river main channel was at a balanceable state between aggradation and degradation and floodplain of the lower weihe river is a tiny aggradation state before the construction of the sanmenxia dam ; 2 ) the severe aggradation of the lower weihe river bed is mainly caused by the increasing riverbed elevation at tongguan after the construction of the sanmenxia dam ; 3 ) the main reason leading to the increasing riverbed elevation at tongguan is the unreasonable operation of the sanmenxia reservoir ; 4 ) the rate of the riverbed aggradation at tongguan reach and the lower weihe river reach are speeded by adverse condition of incoming water and sediment recently

    然後以實測資料為礎分析研究了三門峽建庫前後潼關高程的變化規律以及渭河下遊河道的沖淤演變規律,分析研究表明:建庫前渭河下游主槽處于動態沖淤衡狀態,灘地處于微淤狀態;建庫后,渭河下遊河道發生嚴重淤積主要是由於潼關高程的抬升造成的;潼關高程的抬升主要是由於三門峽庫的不合理運用造成的,近期不利的沙條件加劇了潼關河的抬升速度和渭河下游的淤積。
  3. In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted

    其中,對深礎的施工及浮吊的使用進行了探討,根據深確定橋墩礎的施工方法,對深不超過四米的橋墩礎,採用填土築島的方法:對深大於四米,河有覆蓋層,且能保證鋼管樁具有足夠的承載力的橋墩,採用鋼管樁臺;對主河道上河沒有覆蓋層,鋼管樁無法插打的橋墩,採用浮式臺。
  4. This subject belongs to three - dimensional layout problems with behavioral constraints theoretically and concerns the knowledge of spacecraft design, mechanical engineering, computer science, mathematics, mechanics and system engineering. so it can be ascribed as the frontier fundamental and applied research of cross - discipline subject with np complexity theoretically. in term of engineering practice, this subject has extensive applications, such as layout design of spacecraft module, engineering machinery, submarine and shipping, tank, under - water suspension engineering, platform of marine drilling well, bullet train, multiple spindle box of machine tool, robot

    該課題在理論上,屬帶性能約束的三維布局問題,涉及航天器設計、機械工程、計算機、數學、力學和系統工程等學科,為交叉學科前沿課題的礎理論和應用礎研究,具有np難度;在實踐上,具有廣泛的工程應用背景,如航天器艙、工程機械、潛艇、船舶、坦克、下懸浮工程、海上鉆井臺、高速列車、組合機多軸箱、機器人等的布局方案設計問題。
  5. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析下坂地利樞紐工程,由於該工程河覆蓋層深度最深達147 . 95m ,是壩體高度的近兩倍左右,壩的滲流和液化成為壩體安全主要問題,本文對該壩的三種設計方案即鋪層防滲方案、粘土心墻防滲方案及瀝青心墻防滲方案的靜態應力位移及壩體在竣工期、蓄期等各個階段可能產生的破壞進行了認真研究。
  6. Through the analysis and calculation the conclusion can be made that during the process of the timbering of excavation, the magnitude of soil stress decreases with the increase of the displacement on the base of the still earth pressure, and the earth pressure distribution varies from the triangular distribution of the still earth pressure to other distribution with the displacement of the timbering structure. the thesis introduces the bedding coefficient in the horizontal direction varying with the soil displacement from soil - structure interaction mode, therefore calculation can be made to get more rational calculation result using elastic foundation finite element method which is the same to timbering structure both upwards and under excavation surface

    通過分析計算可以得出,在坑支護過程中,土壓力的大小在靜止土壓力值的礎上隨支護結構向坑內側位移增大而減小;土壓力的分佈由靜止土壓力的三角形分佈隨支護結構位移變化成其它分佈;由土-結構共同作用模式引入隨土體位移變化的系數,使支護結構在開挖面以上部分同以下部分一樣,均可採用彈性地有限元法進行計算,得出更為合理的計算結果。
  7. The flexible retaining structure is another important retaining structure in soft soil. the integrated numerical analysis of this retaining structure ( including the methods and theory of calculating active earth pressure under sorts of conditions as well as the calculating method of horizontal stiffness coefficient of bracing structure and the method of deciding boundary condition etc. ) was gived. the effect of all parameters on the characteristics of retaining structure was discussed using methods of sensitivity - analysis

    本文針對目前常用的彈性支點法,給出了完整的數值分析方法,包括各種條件下的墻後土壓力的計算方法和原理、支撐系統(或錨拉系統)剛度系數的計算、邊界條件的確定方法等,並以此為礎採用靈敏度系數分析方法討論了各參數對圍護結構形態的影響,指出土體側向比例系數是影響圍護結構變形的最主要的參數。
  8. If an immersed tube about 10 metres high is placed above the existing seabed level, which is at around - 12mpd

    -假如在現有海上約主準面以下12米處敷設直徑約10米的沉管。
  9. For the first time this dissertation discusses the feasibility of data mining for the fields data of cfbb , analyses the preprocessing technology of sample data , introduces the application of clustering analysis , and finally completes the rule extraction by applying knowledge - based artificial neural network. considering distributed parameters , nonlinear , and long time lag system of cfbb , the theory of self - organizing neural fuzzy inference system is applied to the control system of cfbb , and enables control rules extraction on - line. the models of data mining and self - organizing ( fbnc - pnn controller ) are programmed , embedded to the control system of a 35 t / h cfbb in tsingtao , and finally improve the performance of cfbb effectively

    本文還針對流化鍋爐運行的非線性嚴重、大滯后、不確定性大等特點,研究了於數據挖掘優化的模糊神經自組織控制策略在循環流化控制系統中的應用,使規則獲取可以在線進行;並編制了數據挖掘模塊優化自組織控制模塊,應用到青島35t / h循環流化鍋爐的控制系統中,提高了鍋爐的運行和效率,取得了良好的效果。
  10. Because the channel bed was adjusted by scouring and silting in long - term, the required period to reach basically equilibrium was predicted based on the typical and assemble hydrographic data in long series after the building of lijia flume dam

    應用李家峽建壩后典型文年長系列的組合資料,預報了河經長期沖淤調整后達到衡需要的時間。
  11. Basic function : heat source is anti - blast infrared - tube made of microcrystal quartz ;, continuosly variable mattress tilt, radiant head can two - directory rotate on horizon, x - ray cassette shelf under infant bed ; high - bright erdiate lamp detect lightness ; advanced microprocessor control temperature system, auto - heated mode, separately display set temperature and real temperature ; 4sound - light alarm capacity : set - off, fan, sensor, over temp.

    本配置:採用了防爆型微晶石英紅外管作輻射熱源,嬰兒斜傾角度有級可調,輻射頭可在位置上雙向隨意轉動,嬰兒下內設有x光暗盒架,檢查照明採用高照度射燈,溫度控制系統採用先進的計算機控制,自動加熱方式,設定溫度和實際溫度分屏顯示,有四種聲光報警功能(溫度上下偏差、傳感器、斷電、超溫) 。
  12. Basic function : heat source is anti - blast infrared - tube made of microcrystal quartz ; continuously variable mattress tilt, radiant head can two - directory rotate on horizon, x - ray cassette shelf under infant bed ; high - bright eradiate lamp detect lightness ; advanced microprocessor control temperature system, autoheated mode, separately display set temperature and real temperature ; 4 sound - light alarm capacity ; set - off, sensor, over temp

    本配置:採用了防爆型微晶石英紅外管作輻射熱源,嬰兒傾斜度有級可調,輻射頭可在位置上雙向隨意轉動,嬰兒下內設有x光暗盒架,檢查照明採用高照度射燈,溫度控制系統採用先進的計算機控制,自動加熱方式,設定溫度和實際溫度分屏顯示,有四種聲光報警功能(溫度上下偏差、傳感器、斷電、超溫) 。
  13. Impeller changed from two - piece to one - piece because of the good base of the technology level. a five - axis milling machine is used to manufacture the blades, which are swept back at the impeller outlet and have a trailing edge which is inclined slightly in the axial direction

    從分體葉輪到整體葉輪,在工藝上已具有較好的礎,前傾后彎葉輪設計中的較大前傾角通過五軸聯動銑實現。
  14. From building the foundation of the airport platform form the sea bed up, to determining the highest standards of service and convenience for passengers, the result is world - class in every aspect

    由建於海的機場臺地工程,以至為旅客提供最優質、最方便的服務,一切都力求盡善盡美,使機場達到世界準。
  15. In samcluster system, the following cluster methods including hierarchical cluster analysis. k - means, and self - organizing map ( som ) and the feature selection methods based on coefficient of variation ( cv ) and simple t - test were integrated. to evaluate the performance of the samcluster system, the samcluster was applied to four expression datasets colon, leukemia72

    在samcluster系統中,整合了下列聚類演算法:譜系聚類、 k -均值聚類和自組圖聚類與變異系數計算和t -檢驗等因變量選擇方法,並提出了一致的樣本分型概念,通過對四個因表達譜的數據集colon 、 leukemia72 、 leukemia38和ovarian的測試,結果表明:誤判的樣本數分別為5 、 1 、 0和0個,因此,的樣本分型與樣本的臨分型高度一致。
分享友人