水底隧道工程 的英文怎麼說

中文拼音 [shuǐdesuìdàogōngchéng]
水底隧道工程 英文
subaqueous tunneling
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 底助詞(用在定語后, 表示定語和中心詞之間是領屬關系, 現在多寫作「的」)
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  1. In order to detect the bottom thickness, cavity, leak and deformation of steel meshes in secondary lining of concrete in tunnel construction, the authors evaluate the wave character and the detected result in the second lining of the tunnel using surveying radar technology and conclude the wave character in the tunnel lining which has mass defect and tested the accuracy and reliability of this technique

    摘要為檢明混凝土二次襯砌中的界厚度、空洞、漏、鋼筋網變形等質量問題,利用探地雷達技術,通過對檢測方法及檢測實驗的研究,進行二次襯砌中雷達波形特徵參數及檢測結果評價,總結了襯砌質量問題的雷達波形特徵,驗證檢測方法的精度和可靠性。
  2. The construction of phase iii started in september 1935 and was completed in 1939, when the third cross - harbour pipeline had been laid. this phase included the laying of twin cross - harbour pipelines that connected kowloon and hong kong island, the building of the tunnel and pumping station, the heightening of the main dam from 115 ft. to 275 ft. and the construction of an auxiliary dam, named the pineapple pass dam

    第三期於1935年9月展開,至1939年第三條海管建成后才告完,主要包括兩條連接九龍至香港的海管、連接塘與供網路的輸、抽機、主壩由115尺加高至275尺,以及興建82尺高的菠蘿凹副壩。
  3. The railway tunnels along canton road and underneath the former marine police headquarters will be constructed by the bored tunnelling method to minimize impacts on the adjacent environment. other than the excavation works that need to be carried out within the works site near the canton road government offices for the new station and introducing the tunnel boring machine, the works that need to be carried out at the street level along canton road will be small in scale so as to minimize the impact on the environment in the neighbourhood

    在廣東沿路和前警總部地的鐵路,會以鉆挖方式建造,除了在廣東政府合署現址附近的地內挖開地面以便興建新車站及引進鉆挖機外,需要在廣東路面進行的規模會很少,以便盡量減少對毗鄰環境的影響。
  4. The spokesman said issues in relation to tunnel construction, including loss and contamination of ground water, subsidence and blow - out, will be addressed by way of the use of an earth pressure balance tunnel boring machine which has been proven to be very successful in the construction of one of the most difficult sections of the west rail, the tsing tsuen tunnel

    九鐵發言人指出,透過使用土壓平衡鉆挖機,可以解決各種建造的問題,如地下流失和污染、土地沉降及泥漿從地湧出等。西鐵即採用了相同的鉆挖機完成其中一項艱鉅的