水庫正常水位 的英文怎麼說

中文拼音 [shuǐzhēngchángshuǐwèi]
水庫正常水位 英文
normal pool level
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 正名詞(正月) the first month of the lunar year; the first moon
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • 水庫 : reservoir水庫岸防護林 reservoir bank protection forest; 水庫測量 reservoir survery; 水庫出流量 ou...
  • 正常 : normal; regular; average
  • 水位 : stage; water level
  1. So as the enter point of the stream, the income of the reservoir, the time of the flood peak lasted, the quantity of sandiness income and the strobe of the darn. we must do some work to forecast and watch the different density stream. by experiments, we made out that it is impo rtant for us to reduce the water lever in work of the river belongs lots of sandiness

    從異重流試驗看,在運用下,產生泥沙異重流的機率較大,能否運動到壩前排出外,還要看異重流潛入點置、入流量、洪峰歷時、入含沙量、閘門運用等因素,需要做好異重流預報監測工作。
  2. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂電站於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段上,電站為低閘引式開發。1268 . 0m ,最大閘高31m ,容297 . 4萬m ~ 3 ,引隧洞長19 . 57km ,裝機360mw 。福堂電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  3. The optimum normal water level is decided by the hamming approach degrees of each plan

    以待選方案與最優方案間的海明貼近度來決策
  4. After the reservoir sluices, the national highway 213 in this area will be submerged. so the national highway 213will increase its elevation to about 920 meters. in order to estimate the influence of the slope - sliding and bank - collapsing which caused by the reservoir sluices to the elevated highway, and to estimate possible emigration problem, stability analysis of landslide body no. l, 2, and 3 in i, ii area which located in bank accumulation body of zipingpu reservoir in national highway 213 is made by transfer coefficient method and 2 - d 3 - d fem in this paper

    紫坪鋪高程877m ,后將淹沒該段現國道213線,因此國道213線將改線抬高至920m高程附近,為確評價因造成的滑坡、塌岸對改線公路的影響,以及可能產生的移民問題,本文用傳遞系數法和二維、三維有限元方法對有可能失穩的213國道紫坪鋪岸堆積體、區的1號、 2號、 3號滑坡體進行了穩定性分析。
  5. Based on the information entropy theory and fuzzy matter - element theory, an information entropy fuzzy matter - element model for normal high water level of reservoirs is described

    摘要基於信息熵理論和模糊物元分析理論,探討了的熵模糊物元決策模型。
  6. Hongjiadu hydraulic power plant is the only leading water storage reservoir of wujiang cascade hydraulic stations, which is a full - time storage reservoir. 2 * landslide body is distributed at the right side of downstream, which is just located in the region of energy dissipation. erosion gully may cut the bottom of the landslide body. there are roads on the top of the landslide body during the construction period and operating period

    洪家渡電站是烏江梯級電站中唯一具有多年調節性能的「龍頭」, 2 #塌滑體分佈於壩址下游右岸,恰好於泄洪消能防沖區內,沖坑將塌滑體下部切腳,而且施工期和運行期在其上都布置有公路,因此2 #塌滑體失穩將影響整個電站的運行。
  7. Every typical port in three gorge reservoir is high steep slope. the stability of port ’ s slope is not only related to the operation of port, but also to the living of local resident with the evaluation of river fluctuated

    三峽區的各典型港口大多是高陡邊坡,隨著的抬升,港口的邊坡穩定性不僅關系著港口的營運,還與附近居民的生活息息相關。
分享友人