水庫群調度 的英文怎麼說

中文拼音 [shuǐqúndiào]
水庫群調度 英文
multi-reservoir scheduling
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞(聚在一起的人或物) crowd; group Ⅱ量詞(用於成群的人或物) group; herd; flock
  • 調 : Ⅰ動詞1 (配合得均勻合適) harmonize; suit well; fit in perfectly 2 (使配合得均勻合適) mix; adju...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 水庫 : reservoir水庫岸防護林 reservoir bank protection forest; 水庫測量 reservoir survery; 水庫出流量 ou...
  • 調度 : 1 (調遣) dispatch (trains buses etc ) 2 (調度員) dispatcher 3 (安排) manage; control 4 (...
  1. Application analysis on reservoir operation by particle swarm optimization

    粒子優化演算法在調中的應用分析
  2. We studied the vegetation on six pre - islands ( land areas which will become islands as a result of flooding ) in the three gorges reservoir with a focus on plant species richness for each community

    摘要三峽導致原有生境的島嶼化,本文調查了三峽6個即將形成的島嶼蓄前的植被特徵,並對這些島嶼上各類落類型的物種豐富進行了分析。
  3. Involved categories in water and sediment joint regulation by group of reservoirs on the middle yellow river

    黃河中游沙聯合調所涉及的范疇
  4. This paper describes a series of preliminary results in combination with actual situations of hydropower development in dadu river by means of establishing river basin water rainfall regime monitoring network, carrying out multi - link large system comprehensive dispatching study of water, electricity and network in group reservoirs, conducting the control mode study of cascade hydropower stations, power supply range and development lime sequence, planning environmental impact assessment in a river basin, as well as the dispatching patching of gongzui, tongjiezi cascade hydropower stations

    大渡河流域電開發有限公司結合流域電開發實際,通過建立流域雨情監測網,開展、電、網多環節的大系統綜合調研究,流域梯級電站控制模式研究、流域供電范圍及開發時序研究,流域規劃環境影響評價研究,以及龔嘴、銅街子電站梯級調實踐,在流域梯級電站統一調研究方面已取得了初步的成果。
  5. ( 4 ) the analysis of rationality and reliability of dispatching results are carried out

    ( 4 )對葉爾羌流域水庫群調度結果進行了合理性、可靠性分析。
  6. ( 5 ) according as different dispatching results under different parameters combination of aertashi reservoir, taking into account hydraulic, energy, investment index etc, the characteristic water level of aertashi reservoir are selected by applying fuzzy optimal selection theory and grey relation analysis theory, and the optimal parameter combination is recommended

    ( 5 )根據阿爾塔什不同參數組合情況下葉爾羌河流域水庫群調度結果,考慮利、動能、投資等指標,運用模糊優選理論和灰色關聯分析理論對阿爾塔什興利特徵位進行了優選,推薦了最優參數組合。
  7. Combined with the practical program, the problems of united dispatching of reservoir system in yeerqiang river basin is studied deeply in this paper by using the theory and method of system science, the model of operation of reservoir system is purposed, the characteristic water level of aertashi reservoir are selected, the operation function of aertashi reservoir is established to direct the operation in the future

    論文結合生產實際,採用系統科學的理論與方法對葉爾羌河流域水庫群調度問題進行了研究,提出了葉爾羌河流域水庫群調度的模型,優選了阿爾塔什的特徵位,並根據長系列結果建立了阿爾塔什調函數以指導將來的運行。
  8. ( 3 ) after the analysis of the actuality of water resources, the requirement to water resources of every department, the basic situation of every reservoir and hydroelectric station, the optimal dispatching schemes of water resources are purposed, the simulation - optimal model of operation of reservoir system are established and solved by using man - machine dialog arithmetic

    ( 3 )在分析葉爾羌河流域資源現狀、各部門需資料、各電站基本情況等資料之後,提出了葉爾羌河流域資源合理調配的原則,在此基礎上建立了葉爾羌河流域水庫群調度模擬優化模型,並用人機對話演算法進行了求解。
  9. Based on the optimal operation problem of flood control for multi - reservoir such as jiangya, zaoshi and yichongqiao reservoirs on the lishui river, a hierarchical model for optimal flood dispatching of multi - reservoir system, which includes a flood routing model and a discrete differential dynamic program model for the optimal flood dispatching of reservoir sub - system, is established : then a new decomposition - coordination algorithm is put forward

    摘要以澧流域中上游的江埡、皂市及宜沖橋三聯合防洪優化調問題為背景,建立了河道洪演進方程與離散微分動態規劃相結合的防洪優化調模型,提出了一種離散微分動態規劃與馬氏京根洪演進相結合的大系統分解協調演算法。
  10. Combined with the significant project - gongboxia hydro - power station construction, emphasized on construction during flood period of power station construction period, the climate character of the upstream of yellow river basin and the practice operation state of cascade reservoirs are analyzed, some problems in construction during flood period such as flood propagation time, interval flood discharge forecast, construction risk, flood period pre - alarm and longyangxia reservoir ' s function on construction of gongboxia are also studied, with an aim at presenting real interval flood forecast scheme and dispatching method, so as to provide technological support for gongboxia hydro - power station construction period

    本論文結合國家重點工程項目?公伯峽電站的建設,以電站建設期施工渡汛為研究重點,從實施出發,分析黃河上游氣候特性和梯級的實際運行狀況,對施工渡汛中的主要問題?洪流達時間、區間洪預報、渡汛風險、汛期預警、龍羊峽在渡汛中的作用等進行了比較全面深入的研究,目的在於提出可用於實際的區間洪預報方案和調方法,為公伯峽電站施工期建設提供技術支撐。
  11. Self - optimization simulation on optimal schedule of reservoirs system for irrigation district

    灌區渠首優化調的自優化模擬技術
  12. As the agricultural nfs is the most important factor for water environmental deterioration and lake eutrophication in china, more and more scientists and technologists focus on the control countermeasurc and pollution mechanism of agricultural non - point source ( nfs ). based on the investigation of natural resource and agricultural distribution, the loss rule of nitrogen and phosphorus in the typical land of qiandao lake watershed and distribution rule of the phytoplankton and physico - chemical characteristic in the lake were studied, and the input loading of nitrogen and phosphorus was also calculated by the annagnps model in this thesis. according to the routine monitoring data of the water environment in qiandao lake from 1989 to 2001, the concentrations of toxic substance and heavy metal were under the monitoring limit, but the total nitrogen ( tn ) and total phosphorus ( tp ) were much higher than the criterion for lake and reservoir

    本文調查了千島湖流域的自然資源和農業生產情況,研究了典型坡地降雨徑流中的氮、磷污染物的輸出規律,利用annagnps模型估算流域農業非點源污染物輸入負荷,並在千島湖內設點采樣,對質理化指標和浮游植物落進行系統的研究,得出以下結論: 1989 2001年間的環境常規監測資料統計分析表明,有毒物質和重金屬濃長期在監測下限內, no _ 2 - n 、 no _ 3 - n 、 nh _ 3 - n年平均濃均符合類標準,但湖泊特定項目tn和tp濃分別為超類和類,呈嚴重超標狀況,湖區主要污染因子是將導致富營養化的物質tn和tp 。
  13. Countermeasures for sediment management in reservoirs regulation for flood control located in the middle yellow river

    黃河中游防洪調中泥沙處理對策
  14. New concept and practice in joint regulation of reservoir groups on the yellow river by regarding flood and sediment as resources

    黃河沙資源化聯合調管理的若干思考
  15. The conjunctive operation system, which is mainly for hydropower generation, flood control and other purposes, is composed of songshan reservoir in the manjiang river and xiaoshao reservoir in the songjianghe river. through the diversion canal, the water in the songshan reservoir can be transported into xiaoshao reservoir

    松山、小山電聯合調由松山和小山組成,主要通過松山引工程將漫江引入松江河上的小山,為跨系的力資源綜合利用。
  16. By choosing flood control system of downstream basin of the yellow river as the background, six relatively independent subsystem is established, which includes basic information management, real - time flood forecast, multi - reservoir flood control scheduling, consultation and analysis, scheduling scheme management, frequency analysis, and assist with friendly man - machine conversation to constitutes the yellow river downstream flood control scheduling decision support system, which can satisfy the practicability requirements of decision - making

    論文以黃河下游防洪系統為背景,建立包括基本信息管理、短期洪預報、)防洪調、會商與靈敏分析、方案管理、雨情頻率分析等6個相對獨立的子系統,並輔以友好的人機交互界面集成為黃河下游防洪調決策支持系統,滿足了決策會商的實用性要求。
  17. A modified particle swarm optimizer for optimal operation of hydropower station

    電站優化調的改進粒子演算法
  18. In the condition of being given runoff inflow series of various reservoirs, the optimal decision - making process of cooperating operation of hydropower stations could be obtained through this model. this process could be worked as results of qualitative calculation

    在給出電站徑流系列的條件下,可以利用該模型求得電站聯合調的最優決策過程,作為確定性優化的計算成果。
  19. 3. intelligent decision support system application in the cascade hydropower station basic theoretical frame of river exploitation planning and optimal dispatching management is probed into by analyzing the current situation of planning and dispatching for hydropower station reservoirs

    3 、智能決策支持系統在梯級電站中的運用在分析我國電站規劃和調現狀的基礎上,探討了河流開發規劃與科學調管理的基本理論框架。
  20. Research on the optimal operation of reservoirs system based on adaptive genetic algorithm

    基於改進遺傳演算法的優化調研究
分享友人