水庫運行過程 的英文怎麼說

中文拼音 [shuǐyùnhángguòchéng]
水庫運行過程 英文
reservoir operation procedure
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
  • : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
  • : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 水庫 : reservoir水庫岸防護林 reservoir bank protection forest; 水庫測量 reservoir survery; 水庫出流量 ou...
  • 運行 : move; be in motion; run; working; machine run; operation; corotation; propulsion (影片)
  • 過程 : process; procedure; transversion; plication; course
  1. At last, considering the running trait of hydraulic turbine in true power stations, combining the complex pipe line system, generating electri city, discharge flood all use of pan shi tou reservoir compute the unsteady transition process

    最後考慮了實際電站輪機組的特性,結合盤石頭、發電、泄洪共用的復雜引系統,進了電站甩負荷引起的非恆定計算。
  2. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工的發展進與國內外圍海的開發現狀,重點介紹了我國目前圍海工的特點及在圍海工實踐中積累的經驗和理論;利用fortran語言完善堵口工龍口力計算序,使序可以滿足圍海工復雜工況下(如考慮內港洪、計算時段的變化、多口門、多容、多閘)的龍口力計算,並進大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編語言vb進界面開發,使計算有良好的人機界面,更直觀地對計算結果進分析和處理;計算結果的后處理採用vb編實現龍口力要素最大值等值線圖的繪制;並用所編軟體對福建省福清市東壁島圍墾工龍口力計算,為堵口合龍提供科學依據。
  3. The third generation of scada, based on the technology of distributing computer net and relation data base, could realize the large - scale internet connection, which is currently applied in data collection, surveillance control and processing control in the fields of electric power system, water supply system, petroleum and chemical industry etc. the fourth generation of scada would adopt the internet technology, object oriented technology, neural network as well as java technology as its main development tendency, aiming at enlarging the integration of scada and other systems, which could finally meet the needs of business management and integrated security economic circulation

    現在的基於分散式計算機網路以及關系數據技術的能夠實現大范圍聯網的第三代scada系統被廣泛應用於電力系統、給系統、石油、化工等領域的數據採集與監視控制以及式控制制等諸多領域。第四代scada系統的主要發展趨勢是採用internet技術、面向對象技術、神經網路技術以及java技術等技術,繼續擴大scada系統與其它系統的集成,綜合安全經濟以及商業化營的需要。
  4. ( 5 ) taking full of advantage of the ado. net and asp. net technology under the. net platform. it construct a powerful remote control and monitor system and meet the reqirment of the users. in order to achieve real - time control, it design a front environments built on the asp. net structure, from which the system can fulfill the real - time function. due to the characteristic of drain off water pump station remote control and monitor system ( big pump station need high voltage ( 6000v ) and great power ), so now do n ' t adopt the ways that client _ end controls it. in addition, the server - end design a database to manage from which the system could tackle users information and online users log in the form of winform and strengthen the safety of the system

    Net平臺下的ado . net與asp . net技術,發揮兩者的武漢理工大學碩士學位論文優勢,構造了功能更強的遠監控系統,更好的滿足用戶的需要。系統設計中以asp . net架構為前臺環境,實現了客戶端通ie瀏覽器來實時的監控到排泵站的情況,使系統達到了實時監視,但由於大泵機工作電壓高( 6000v )功率大( 100okw )的特點,暫不採用客戶端控制系統。在服務端,設計了數據,並且以winform的形式來管理網路管理員和用戶的信息以及在線用戶的日誌,加強了系統的安全性。
  5. As to how to reduce inventory and optimize logistics to enhance the administrative level of the company, the article dwells with sound evidence on the points as follows : how to make sales forecast more accurate ; how to stengthen the execution of planning ; how to improve inventory management and how to have a better control of logistics in production, which says the company should creat a whole logistics management system to reduce the inventory, to optimise the management level, with all the processes basing on the same flat roof, so as to helping the company chance it " s management level, and the competitiveness in the market

    文章圍繞著如何降低存,提高企業物流作效率,提升企業整體平的論點,聯系了物流的相關的理論知識與實踐經驗,在提高預測的準確率,加強計劃的制定與執,改善倉的日常物流事務管理,強化企業生產物流管理等方面,以有力的論據進了詳細地闡述,以此說明了企業必須建立一整套物流體系,使整個物流處于同一個操作平臺,以利於存降低和企業管理平的提高,最終提高企業的市場競爭力。
  6. Firstly, we account for the former made and the sand selected are reasonable by experiments. then we develop the first project carrying the experiment for filling up of 30 years. contrasted with the count, the results have no difference, we carried two experiments under different water levers by the actually facts if engineering work in early days. by the result, we know that the gross of fill up have no difference

    本文從白石泥沙模型試驗入手,模型試驗首先通模型糙率和模型選沙驗證試驗,說明模型製作和選沙是合理的;然後開展初設方案30年淤積試驗,並與數模計算對比,基本相同;試驗結合工初期用實際情況,進了兩個不同初期位方案的對比試驗,從兩個方案試驗結果看,初期用的兩個方案淤積總量差別不大,而從效益看,方案二優于方案一。
  7. In this paper, the deposition evolution process in qtx reservoir are studied, the incoming water and sediment, the operation data, and the time and space distribution of longitudinal and lateral sedimentation in reservoir are analyzed in detail, and the longitudinal scouring and sedimentation and lateral deformation law in reservoir tidal flat and mainstream under different operation way are summarized in every operation period

    本文以黃河青銅峽電樞紐工淤積演變為研究對象,對青銅峽來沙組成、資料、縱橫向泥沙淤積時空分佈等進了較詳細的分析,總結了青銅峽各個時期不同方式下灘槽縱向沖淤和橫向變形規律。
  8. The task of the paper is analysis the cause and trend of reservoir sedimentation based on the study of runoff characteristic, operation mode and sediment status of xiazhai reservoir in xiji county, so as to offer a theory basis to confirm reasonable reservoir operation mode and to perfect the desig n of the works, and to provide a certain guidance to solve the practice problem of other water works

    本課題以西吉縣夏寨為研究對象,通研究徑流特徵和方式及淤積狀況,分析了淤積成因及變化趨勢,為合理確定方式,進一步完善工設計提供了理論基礎,對解決工實際問題具有一定指導意義。
  9. According to the fact of the engineering, the optimal modeling when fenhe first reservoir operated alone are first made. after getting the regularity, in order to consider fenhe second reservoir that had been finished essentially and shanxi wanjiazhai yellow river diversion project, not only the object of minimum water shortage for satisfying the water use demanded mainly by user are founded, but also the object of minimum the reservoir deposition was found. in order to prevent the water use demanded by city and industry from excessively concentrated water shortage, the object of minimum water shortage required to be the equable shortage

    本文在對來分析基礎上,對太原市需的用了預測,結合工實際,先對汾河一單獨時進優化模擬,得出規律后,考慮已基本完工的汾河二及引黃南干工,建立了以滿足用戶用為主要目標的「缺量最小」目標和減少淤積的「淤積量」最小的目標,其中「缺量」最小目標要求是均勻的短缺,避免分集中而影響了城市及工農業用
  10. The experimental results indicated that if the emptying scour was employed in the changma reservoir, the deposition in the reservoir could be efficiently driven out and the reservoir life can be extended

    選擇中兩個關鍵性的淤積高,進排沙不利的豐豐沙年和枯豐沙年兩個文年7月份泄空沖刷試驗。
  11. Base on the analyzing and coordinating of the experts " knowledge in the field of aquaculture, and making the knowledge systematization, " feedstuff feeding of the freshwater aquatics breeding expert system " is designed and implemented. it is depended on the prevalent web techniques in the internet / intranet platform and build a knowledge wide - shared environment on web

    本研究通對淡養魚飼料投喂的分析,提出了飼料投喂知識的表示與獲取方法;用知識工相關理論,進了「淡養魚飼料投喂專家系統」的知識、模型及推理機制的設計;將專家的知識和經驗用專家系統技術結合主流的計算機網路技術表現出來,研製了基於web的淡養魚飼料投喂專家系統。
  12. At last, the scouring and sedimentation process of qtx reservoir at different operation way are calculated and forecasted by using of this model, the problems existing on operation way are pointed out, and the optimum adjusting water and sediment operation way in the future are put forward

    最後利用該模型對青銅峽不同用方式的泥沙沖淤預測計算,指出了青銅峽以往方式上存在的問題,提出了今後最佳調調沙用方式。
  13. By analyzing and studying the hydrogeology condition of the reservoir bank, typical zone is selected to build the realistic hydrogeology and mathematic model. the dynamic character of the groundwater seepage field of slopes in fengjie section during the present time, the initial process of storing water and operation of the reservoir, the late process of storing water and operation of the reservoir is imitated with 3d - modflow

    分析岸坡的文地質條件,選出典型的代表區域,建立較逼真的文地質模型和計算模型,用3d - modflow軟體對區岸坡內地下滲流場在現條件下、首期蓄中、二期蓄中的動態變化特徵進了模擬研究。
  14. The second part of the thesis tries to construct the architecture of multi - agent knowledage discovery system in rice cultivation database ( makdsrcd ), and build a system model on it. the functions of those respective components and the operation procedure of the system are also described in this part

    本文第二章建立了基於多agent的稻栽培數據知識發現系統( makdsrcd )的體系結構,並在此基礎上構建出用於描述系統各構成實體功能及系統的系統模型。
  15. Considering the higher energy consumption and greater fluctuation of venting water ’ quality in activated sludge process widespread adopted, this thesis applies the optimal control strategy to the aeration process of wastewater treatment. the research supplies the preparation of the water treatment integrated equipment with the theory support, also acquires the matter of academy studies and application

    論文針對三峽區城鎮目前普遍採用的活性污泥工藝中能耗大、出質波動較大的現狀,將最優控制策略應用於污處理曝氣中,不僅為處理集成化設備的研製提供了理論支持,而且對提高污處理系統的穩定性、可靠性以及降低能耗都具有重要的理論價值和實際意義。
  16. In this article, according to heat conduction theory and finite element theory, the temperature field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, thermal insulation change, surrounding temperature change and water storage on temperature field in the arch dam are also considered

    論文根據熱傳導理論及有限元理論,用三維有限元浮動網格法對施工期和期溫度場進了全模擬分析,較為系統的研究了混凝土拱壩施工期和期溫度場分佈規律,在分析中按照混凝土拱壩施工,考慮了混凝土分層澆築、施工間隙時間、絕熱溫升及壩體材料分區、分期蓄和環境溫度變化等因素對壩體溫度場的影響。
  17. In the course of modeling, we present multi - step generalized gradient method and multi - stage curve fitting technique, prove convergence of multi - step generalized gradient method by using differential equation stable theory, analyze the error of multi - stage curve fitting technique by using inner space, creat knowledge base of water network system by using the maximum subordinate principle of and near - select principle of pattern recognition. at last we make the optimal running scheme of water network system based on heuristic search technique of artificial intelligence and global feedback immediate coordination method of large scale system theory

    在建立系統模型的中,提出了多步廣義梯度法和多層曲線擬合的建模方法,並用微分方穩定性理論證明了多步廣度梯度法收斂性,用內積空間的有關知識對多層曲線擬合進誤差分析;應用模糊數學中的最大隸屬度原則和模糊識別中的擇近原則和人工智慧中狀態空間表示法建立注系統的知識;用人工智慧中的啟發式搜索技術和大系統理論中的具有全局反饋的直接協調法制定注系統的優化方案。
  18. Thirdly, by the method of questionnaire and quality control tools, the buying and selling process quality control proposal is given in this article, thereby, the analytical methods of quality control including the acceptance criterion of wheat, the process capacity of supply and customer satisfaction indexes evaluation are discussed in this article. fourthly, based on the methods of statistical process control, this article evaluate the factor that have a impact on the process of the stored grain with qualitative analysis and quantitative analysis, and bring forward the design proposal of controlling temperature for stored grain in warehouse. at last, in order to bring the optimization design for quality management system into effect and advance the enterprise in overall management, the article table a proposal including strengthening the training of quality management, introducing iso9000 standard into quality management, bringing about the grain industrialization, standardizing quality inspection criterion, developing the computer auxiliary control system

    首先依照iso9001標準,藉助于設計的專家調查表通專家調查,對該糧的質量管理體系現狀進詳細分析,確定出質量管理體系文件、資源管理、產品實現、質量控制和質量改進五個方面存在的主要問題;其次用系統方法建立了糧質量管理體系完善序及質量管理體系的三維空間結構模型,並在此基礎上優化設計出了質量管理體系內部審核、不合格控制、糾正和預防措施等質量改進實施方案;再次,用調查表法和質量管理控制工具對該糧的糧食輪換的質量控制進了優化設計,確定出糧食采購標準、供應能力分析以及顧客滿意度評價等分析方案;然後,用統計分析方法對糧食倉儲的影響因素及其原因進定性和定量分析評價,確定出倉儲質量控制的優化方案;最後,為確保設計方案的有效實施,從糧加強質量管理培訓、導入iso9000族標準、糧食產業化開發、規范糧食質量檢驗標準、開發計算機輔助控制系統五個方面提出具體實施建議,以便提高其整體質量管理平。
  19. On the basis of a full investigation and study and an integrated analysis of the geological setting and rock - mass mechanical environment of the bank slopes of the hydroelectric project area on the mainstream of the jinsha river and by combining the qualitative analysis with the quantitative evaluation, the authors calculated the instability of the sliding masses according to 1 / 8 and 1 / 11 of the total cubic capacity of the materials falling into the river and the surge wave heights at the falling sites as well as at the xiangjiaba and xiluodu dam sites and in adjacent townships according to the calculation method of the surge wave diagram given by the american society of civil engineers, made the risk evaluation of the bank slope instability with respect to the operation safety at the dam, safety of the cities and townships around the reservoir and safety of the reservoir operation, and put forward precautionary measures for bank slope instability

    摘要筆者通調查研究和綜合分析金沙江幹流電工區岸坡地質背景和巖體力學環境條件,定性分析與定量評價相結合,採用與三峽工區岸坡失穩危險性評價相類比的方法,針對崩滑體失穩按總體積的1 / 8和1 / 11入江方量進了計算和按美國土木工學會涌浪圖解計演算法計算了入點及在向家壩壩址、溪洛渡壩址和鄰近城鎮的涌浪高度,並圍繞大壩施工安全、區周邊城鎮安全,營安全等方面對岸坡失穩的危險性進了評價預測,提出了岸坡失穩的防治對策。
  20. Other slopes of the whole reservoir bank that will not wholly destroy will partly destroyed with the means of peeling off by reservoir water

    整體穩定的岸斜坡在及其正常中將主要以剝離的形式破壞。
分享友人