水庫淤積作用 的英文怎麼說

中文拼音 [shuǐzuòyòng]
水庫淤積作用 英文
reservoir sedimentation
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞1 (淤積) become silted up 2 (血液不流通) (of blood) stagnateⅡ名詞(淤積的泥沙) silt Ⅲ...
  • : Ⅰ動詞(積累) amass; store up; accumulate Ⅱ形容詞(長時間積累下來的) long standing; long pending...
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • 水庫 : reservoir水庫岸防護林 reservoir bank protection forest; 水庫測量 reservoir survery; 水庫出流量 ou...
  • 淤積 : silting-up; deposit; sedimentation
  1. Firstly, we account for the former made and the sand selected are reasonable by experiments. then we develop the first project carrying the experiment for filling up of 30 years. contrasted with the count, the results have no difference, we carried two experiments under different water levers by the actually facts if engineering work in early days. by the result, we know that the gross of fill up have no difference

    本文從白石泥沙模型試驗入手,模型試驗首先通過模型糙率和模型選沙驗證試驗,說明模型製和選沙是合理的;然後開展初設方案30年運試驗,並與數模計算對比,基本相同;試驗結合工程初期運實際情況,進行了兩個不同初期運位方案的對比試驗,從兩個方案試驗結果看,初期運的兩個方案總量差別不大,而從效益看,方案二優于方案一。
  2. Hydroelectric power exploitation can reduce sediment disposal, lengthen life of power plants in lower stream, control stream, better water quality, and reduce contamination etc. considering the structure of power of sichuan province and pointing out its six problems in power development, this thesis comes up with sustainale development strategy of sichuan hydroelectric power exploitation, that is, prefentially exploit large scale hydropower plant which has good water - adapting capability, comprehensively use water resource, try to reduce cost caused by drowning, stimulate rotating exploitation, well deal with settlement of people in hydroproject construction, and alleviate contamination

    論述電開發在減緩泥沙、延長下游電站壽命、調控流、提高供量、改善質、提供清潔能源、減少環境污染等方面對長江上游生態屏障建設的。本文研究分析了四川電開發的可持續發展戰略,首先對四川省電力結構現狀進行了分析,指出目前四川電力發展存在的六個主要問題,從優先開發具有良好調節性能的大型電站、綜合利資源,盡最大可能減少淹沒損失,極推進流域梯級滾動綜合開發,處理好移民關系,減輕對環境的不利影響等六個方面論述了電開發的可持續發展戰略。
  3. Abstract : it was introduced in the paper on the basis of the famous tide model of s21hd, the sediment calulation for the design proposal of the reservoir of dandong power plant had been given by the newly setup generalized model of overall sediment which relying upon the data of original observation, and the relative wave model test conclusions and the forecast results of sediment by the joint action of wave and current were quoted

    文摘:簡要介紹以著名的潮流模型s21hd為基礎,新建的依賴于原觀資料的全沙沖概化模型,對丹東電廠蓄設計方案進行的回計算;引述了相應的波浪模型試驗結論和浪、流聯合預報結果。
分享友人