水東江 的英文怎麼說

中文拼音 [shuǐdōngjiāng]
水東江 英文
shuidongjiang
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞1. (大河) (large) river 2. (指長江) the changjiang [yangtze] river 3. (姓氏) a surname
  1. Bursting of main aqueducts for conveying dongjiang water

    輸送的主要管爆裂的事宜
  2. Calculation and analysis of the total water environment capacity of the main stem of dongjiang river in huizhou city

    幹流惠州市區段環境容量計算及分析
  3. Poc in the dongjiang river was influenced mainly by c4 plant such as grass and crops, and poc 6 13c value was heavier than that in the xijiang and beijiang rivers

    在珠流域中,體poc受c _ 4植物草類以及作物的影響明顯, ~ ( 13 ) c值比西、北偏重。
  4. This paper researches on the water and suspension in zhujiang ( pearl ) river and her three branches, sampling in makou hydrological gorge station of xijiang river, hekou hydrological gorge station of beijiang river and boluo hydrological gorge station of dongjiang river. the author calculated the riverine carbon flux and measured the content of different carbon forms and carbon isotope composition. furthermore, the author also studied drainage basin erosion and the influence of vegetation distribution on erosion

    本文以珠體、懸浮物為研究對象,通過對西馬口、北河口、博羅斷面體取樣,分析體中不同形態碳含量,測定碳同位素值,並計算了河流碳通量值;還對珠流域的侵蝕狀況及植被分佈對流域侵蝕的影響進行了探討。
  5. Dongshen - hong kong water supply scheme to channel dongjiang water to flow southward to shenzhen requires to convert one of the tributaries flowing north to dongjiang - the shima river - into an artificial canal by pumping of water from the shima river from its lower course to its upper course

    深供工程,引南流至深圳市,需將其中一條原本由南向北流入的支流石馬河變成一條人工運河,河由下游抽回上游,逆流而上,工程因而相當艱巨。
  6. Third, some methods of evaluating water quality and computing water capacity, which are often used in water quality management, are studied and an example of estimating dong jiang cross - section is given

    針對質管理的具體要求,探討了多種質評價方法和容量的計算方法,並給出斷面質評價的實例分析。
  7. The poc14c apparent age of zhujiang river suspension is between 540 and 2050 a. among the three branches, xijiang and beijiang river suspensions are older. the 14c apparent age value of dongjiang river is comparatively scattered - it not only has considerably younger samples but also the older ones

    體懸浮物poc ~ ( 14 ) c表觀年齡介於540 2050a之間,西、北懸浮物poc年齡相對較老,懸浮物poc年齡較為離散,既有較為年輕的樣品,又有較老的樣品,但以較年輕的樣品為主。
  8. The coastal line of the city is twisting, 220 km in length, with fine ports like shuidong and bohe ; there are rivers like jianjiang, meihuajiang, huanghuahe, xiaodongjiang

    全市迂迴海岸線220公里,擁有、博賀等多個天然良港;河流主要有鑒、袂花、黃華河、小等。
  9. The hong kong and guangdong governments have worked closely to strive to improve the quality of raw water from dongjiang to conform to the national standard for type ii waters applicable for the abstraction for human consumption in first class protection area in the " environmental quality standards for surface water, gb 3838 - 2002 "

    香港和廣省政府一直保持緊密合作,致力提升質達至國家《地表環境質量標準gb3838 - 2002 》第ii類的標準。所有原都經嚴格的處理程序和密切監測,這使香港能夠享有最安全的食供應。
  10. The bags have been well sold to fruit production areas in shanxi, henan, hebei, shandong and jiangsu, and are good quality, good price and well acclaimed by the fruit farmers

    銷往山西河南河北山蘇等果產區,質量可靠價格實惠,深受廣大果農喜愛。
  11. The main conclusions are as follows : the hco3 - ion content of zhujiang river changes notably in one hydrological year, especially in wet season and dry season. as for the content of inorganic carbon, that of the xijiang river is the highest, then the beijiang river, and then the dongjiang river. the xijiang river ' s inorganic carbon source was major from karst process in the drainage basin

    得出如下的結論:珠體hco _ 3 ~ -離子含量在一個文年中發生顯著變化,特別是豐期與枯期之間波動幅度較大;無機碳含量西含量最高,其次是北最低;西無機碳主要來源於巖溶作用,由於受河流沖刷效應影響,豐期hco _ 3 ~ -離子含量升高;流域無機碳主要來源於硅酸鹽巖的碳酸鹽風化過程,豐期hco _ 3 ~ -離子含量無顯著變化;北無機碳來源於巖溶作用和硅酸鹽巖的碳酸鹽風化過程,受稀釋效應影響,無機碳含量隨量增加而降低。
  12. More on how aqueduct protects the quality of gongjiang water

    有關專用輸管道保護質的詳情
  13. Moreover, that web site do introduces dongjiang raw water, water treatment process, water quality control and its qualitity data

    該網站還介紹了輸港的、濾過程、質控制及資料。
  14. " the metal in subject - cadmium is also monitored by the environmental protection bureau of guangdong province at the dongjiang main stream outside taiyuan pumping station where donjiang water is abstracted and the monitoring results are also available at wsd s websites - www. info. gov. hkwsd

    省環保局亦在抽取的太園抽站外對干主流原的鎘含量有嚴格監察,並將監察數據上載於務署的網頁:
  15. Quality of dongjiang water supplied to hong kong

    輸港
  16. Poised on riverside facing greenery, here waters abound and a profusion of flying birds and flowers, indulge yourself in the leisureliness and nature deeply

    湖畔,綠樹成蔭,朝看鷺鳥紛飛,暮覽漣漪,至身其中盡享悠然自在。
  17. Water samples collected at muk wo, bordering hong kong, showed a sharp increase in ammonia content, up from the usual 0. 8 mg / litre to yesterday ' s 1. 023 mg / litre

    位於邊境的木湖抽質樣本顯示,阿摩尼亞含量由平日的每公升零點八毫克升至昨日的每公升一點零二三毫克。
  18. It enters the south china sea to the west of hong kong through eight outlets : yamen ; hutiaomen ; jitimen ; modaomen ; hengmen ; hongqimen ; jiaomen and humen. the four latter outlets are located just west of hong kong and drain into the pearl river estuary lingding bay

    的三大主要支流分別是西和北,經崖門虎跳門雞啼門磨刀門橫門洪奇門蕉門及虎門等八個出口流入香港西面的南中國海。
  19. This included firstly the construction of a new reception tank and a pumping station at muk wu to strengthen the raw water reception capability. secondly, additional water mains were laid to strengthen the transfer between river indus pumping station with plover cove reservoir

    17億元改善計劃,第一部份在木湖興建一個新蓄池及抽站,加強輸入廣省原設備,第二部份是由梧桐河抽站至船灣淡湖興建輸管,增加梧桐河抽站抽量。
  20. The second stage of the uprating engineering works were implemented after the signing of the agreement in august 1979 endorsing the planning report for the second stage extension of the dongshen water supply system. the main works were to extend the pumping facilities at matan, tongxia, zhutang, shaling, shanpu and yantian, and to increase the height of the main dam of shenzhen reservoir by 1 metre. the new works included the construction of a new pumping station - the dongjiang pumping station at the intake point at the riverbank of dongjiang to increase the volume of supply

    第二期工程於1979年8月簽訂《深圳供工程第二期擴建規劃報告》協議后進行,主要是再擴大原工程在馬灘、塘廈、竹塘、沙嶺、上埔及雁田的抽站,加高深圳庫主壩1米,新建的工程則包括于新開河口興建站,提高供數量。
分享友人