水檢壓計 的英文怎麼說

中文拼音 [shuǐjiǎn]
水檢壓計 英文
hydromanometer
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞1 (查) check up; inspect; examine 2 (約束; 檢點) restrain oneself; be careful in one s c...
  • : 壓構詞成分。
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  1. Main operating companies : one, quality brands imported power plant auxiliary equipment : including valves, pumps and transducer and thermocouple and actuators, measuring gauges, pressure switches, solenoid valve and ion exchange resins and other rights and the importation of water treatment packages instruments : online various instruments, laboratory instruments 3, chemical water treatment, electro - deionization ( edi ) 4. complete sets of equipment, installation, commissioning and maintenance

    公司主要經營: 1 、代理進口優質品牌電站輔機設備:含閥門、泵類、變送器、熱電偶、執行器、量儀表、力開關、電磁閥、離子交換樹脂等; 2 、代理進口處理成套儀器儀表:各類在線儀表、實驗室儀表; 3 、化處理、電除鹽( edi ) 4 、設備成套安裝、調試、修。
  2. It looks upon water resistant as load, simulate every instance of locomotive running and check its every parameter automatically, then collect and dispose these data of parameters, calculate the power of simulating running of locomotive, which is based on the current, and voltage of host dynamotor. afterward, it can be judged from the working state of locomotive. through experiment and adjust each parameter, it can provide important warrant to the components of locomotive whether they can work normally and credibly

    即以阻作為負載,模擬機車運行,對機車的主發電動機的電流、電和柴油機的轉速等參數進行測,並對測結果進行處理,算出模擬機車運行時的功率,並以此為依據,對機車的工作狀念進行判斷,通過阻試驗,調整有關參數,使機車運行時能發揮所要求的功率和滿足規定的工作特性。
  3. The important meaning in which this direction studied has lain in establishing the connection between the material science of concrete and civil engineering, analyse the strength in terms of material microcosmic or the mesoscopic, have important meaning to understanding, know the essential law of the strength of concrete. this text divides six chapters altogether. chapter one reviewed the pore structure in nowadays domestic and international research current situation, including the concrete examines research, research of the pore structure model and the research current situations of pore structure and strength relation of the pore method, have introduced some most important achievements of structure research of pore ; chapter two narrated much yardstick of the material mesoscopic structure of concrete and principle of examining pore technology of material of concrete, and the commonly used sign parameter in discussedding the pore and material pore of quito of cement and analyse, have explained that the influence factor of mip to the result of study of pore, has pointed out the limitation in mip in the pore structure ; analyse porosity and strength relation development course of model emphatically, and has carried on comparative analysis to the existing model, has pointed out the weak point of the original model ; on the basis of " ing integrate synthetically ", propose concrete pore structure compound body model and pore physical model of systemlex body ; chapter five carried on the corresponding test data to compares to the model parameter appearing in model of chapter four with and analyses, have received k value of the characteristic of strength of matrices of reflecting according to the method to return to analysis, and calculate the influence produced on the strength of concrete in revision that can probed into the content of cement, elastic mould and surface energy, exactness of the inspection model ; chapter six is the conclusion, according to studying the survey this text to some research conclusions of the pore structure and making corresponding prospect to the structure development of pore

    第一章回顧了孔結構在當今國內外的研究現狀,包括混凝土測孔方法的研究、孔結構模型的研究及孔結構與強度關系的研究現狀,介紹了孔結構研究方面的一些最重要的成果;第二章敘述了混凝土材料細觀結構的多尺度性及混凝土材料測孔技術的原理,並討論了泥基多孔材料孔隙分析中常用的表徵參數,也說明了汞法測孔對研究結果的影響因素,指出了汞法在孔結構研究中的局限性;第三章是著重分析了孔隙率與強度關系模型的發展歷程,並對已有的模型進行了比較分析,指出了原有模型的不足之處;第四章在「綜合集成」的基礎上,提出了混凝土孔結構復合體模型和孔系統的物理模型,並模擬了該模型下由各單體並聯形成的復合體的斷裂過程,最後根據所建模型編制了相應的算程序,可根據輸入的孔徑分佈與泥含量等參數,實現混凝土理論強度的算;第五章對第四章模型中出現的模型參數進行了相應的試驗數據對比分析,根據回歸分析的方法得到了反映基體強度特徵的k值,並從理論上探討了泥含量、彈性模量和表面能的修正對混凝土強度算產生的影響,驗模型的正確性;第六章是結論與展望,根據研究綜述了本文對孔結構的一些研究結論並對孔結構發展作了相應的展望。
  4. Some testing devices are of advanced ones, such as scanning electronic microscope, microfocus circular radioscope, water - immersed ultrasonic flaw detector, 3 - axis measuring machines, large - sized projector, etc. for the production of non - aero products, there are large - sized die - casting equipment, and nearly 100 pieces of specialized gear machine tools including worm - gear grinding machine, etc. it has some specialized production lines for piston, crankshaft, cylinder and housing, etc., as well as 4 flexible production lines advanced at home for motorcycle engine, and a complete set of automatic inspection test eqiuipment for motorcycle engine

    算機輔助設輔助加工技術正在普遍使用。在非航空產品生產方面有大型鑄設備殼型鑄造,包括鍋桿輪磨在內的輪專用機床100多臺,以及活塞曲軸汽缸殼體等專業化生產線。此外,還建成了具有國內領先平的4條摩托車發動機柔性生產線,以及成套的摩托車發動機測設備,可進行測試數據分析,改進定測試方法等。
  5. Di - on electric one of the beijing hi - new - tech enterprise develop and manufacture lots of equipment like sf6 dewpoint meter dp100, cable fault location system cfl6000 and more. di - on electric supply the most advanced technology and equipment on such as gis surge arrestor on line monitoring, resistance measuring, ac dc metrology, thermal - temperature bridge, power transformer diagnostic and testing, cable diagnostic and fault location, sf6and oil moisture measuring, oil treatment and testing, optic fiber temperature monitoring, circuit breaker testing, relay testing and more

    迪揚電氣在gis和避雷器的帶電測試與故障診斷分析,電力電纜的故障定位與局放測,變器電抗器的各種測試診斷與溫度監測, sf6的分測量與回收,絕緣油的測試分析與濾油處理,紅外測溫與光纖在線測溫,以及各種電阻測試與量,溫度量與電能量等方面擁有世界一流的技術與成熟的儀器設備。
  6. It is respectively : production, facility for transporting operates personnel : jockey of lathe work, milling, grinding work, boring labour, solderer, modular machine tool, machining center jockey, casting matchs benchwork, besmear to install ship - fitter of ship - fitter of equipment of benchwork of labour, tool, boiler, electric machinery, discretion to control ship - fitter of appearance of ship - fitter of appearance of instrument of electric equipment ship - fitter, electron, electrical engineering instrument, machine ; irrigation works of aricultural herd fishing produces personnel : inspector of quarantine of the member that animal epidemic disease prevents and cure, animal, firedamp produces work ; personnel of line of business of commerce, service : the member that assistant, bagman, publication is issued, chinese traditional medicine purchase and sale, clerk of the member that the division of division of appraisal appraisal division, chinese style noodle, chinese style noodle, western - style cook division, western - style noodle division, division that move wine, nutrition distributes food, dining - room, antechamber clerk, client clerk, health care ; handle affairs personnel and concerned personnel : secretary, public relations member, the member that terminal of communication of computer operator, cartographer, operator, user is maintained

    分別是:生產、運輸設備操作人員:車工、銑工、磨工、鏜工、焊工、組合機床操作工、加工中心操作工、鑄配鉗工、塗裝工、工具鉗工、鍋爐設備裝配工、電機裝配工、高低電器裝配工、電子儀器儀表裝配工、電工儀器儀表裝配工、機修鉗工、汽車修理工、摩托車維修工、精密儀器儀表修理工、鍋爐設備安裝工、變電設備安裝工、維修電工、算機維修工、手工木工、精細木工、音響調音員、貴金屬首飾手工製作工、土石方機械操作工、砌築工、混凝土工、鋼筋工、架子工、防工、裝飾裝修工、電氣設備安裝工、管工、汽車駕駛員、起重裝卸機械操作工、化學驗工、食品驗工、紡織纖維驗工、貴金屬首飾鉆石驗員、防腐蝕工;農林牧漁利生產人員:動物疫病防治員、動物驗員、沼氣生產工;商業、服務業人員:營業員、推銷員、出版物發行員、中藥購銷員、鑒定估價師、中式面點師、中式面點師、西式烹調師、西式面點師、調酒師、營養配菜員、餐廳服務員、前廳服務員、客戶服務員、保健按摩師、職業指導員、物業指導員、物業治理員、鍋爐操作工、美容師、美發師、攝影師、眼鏡驗光員、眼鏡定配工、家用電子產品維修工、家用電器產品維修工、照相器材維修工、鐘表維修工、辦公設備維修工、保育員、家政服務員、養老護理員;辦事人員和有關人員:秘書、公關員、算機操作員、制圖員、話務員、用戶通信終端維修員。
  7. With the retrospection of the developing course of the bored pile foundation and combining with my practical experience, the paper expatiates upon the design principle of percent of fit of the stone - fill grouted concrete and the main factors of the influence strength target, and the final pile technique introduction of the hollow pile of the stone - fill grouted concrete and the precast prestressed concrete ; baesd on the theory of slurry hydraulics, empirical calculation formulas of the radis and height of diffuse slurry are deduced in this paper ; it analyzes the test pile materials of the hollow pile foundation, such as luoyang yi river bridge and dangwang jian river bridge ; the new technique of the hollow pile, which provides the generalization and application with base materials, expounds its feasibilities, adaptabilities and economy

    本文通過綜合分析國內外鉆孔樁基礎的發展歷程及研究現狀,重點討論了填石漿混凝土空心樁、預制預應力混凝土空心樁的成樁工藝、填石漿混凝土的配合比設原理及影響強度指標的主要因素;根據泥漿力學原理,導得了考慮各種因素的泥漿液在預填骨料中的流動影響半徑和上升高度;結合河南省洛陽伊河大橋、黨灣澗河大橋工程實踐,討論了填石漿混凝土空心樁基礎的質量測方法及標準;並在此基礎上,深入分析了樁側、樁端承載能力,提出了填石漿混凝土空心樁的設算理論和方法。最後,論證了空心樁新工藝的可行性、適應性、經濟性,為大力推廣應用空心樁新技術提供了可靠的技術資料。
  8. This tester is capable of quickly assessing the waterproofing ability of the shoe lining cover

    針對功能鞋防鞋材要求設,可作定試驗,透試驗,採用簡單易讀指針指示驗材料之防性能
  9. A vector hydrophone is composed of two or three spatially co - located but orthogonally oriented velocity hydrophones plus another optional co - located pressure hydrophone. this paper introduces an underwater acoustic eigenstructure esprit - based algorithm that yields closed - form direction - of - arrival ( doa ) estimates using a single vector hydrophone

    矢量聽器是由質點振速傳感器和聲傳感器復合而成的,相對于傳統的聲聽器,可以獲取下聲矢量信號,為下信號的測和估提供了更為豐富的聲場信息。
  10. The result of long - term operation shows that the computer control system is practical and effective, it can run in the optimal state within a long duration to fully realize data collection and process, remote data transmission and vfvs constant injection control of pumps. it speeds up the automatic procedures of the seawater treatment process, really realizes the unmanned working, decreases the physical intensity to a large extent, improves the management, enhances the management level, avoids equipment wear down as much as possible, makes the seawater treatment efficient and lessens the cost of production

    長期的運行結果表明,該算機控制系統的實施切實有效,既成功實現了對被測參數的數據採集與處理、遠傳以及注泵機組的變頻調速恆控制,又提高了系統的自動化程序,真正實現了無人值班作業,在很大程度上降低了工作人員的勞動強度,極大的改善了現場的管理狀況,提高了生產管理平,且有效避免了設備損耗,提高了處理效率,降低了生產成本。
  11. There are five parameters need to be measured. there are five channels for input : the displacement of casting - roller, the rotate speed of casting - roller, the pressure of casting and rolling, the casting temperature and the water - speed of cooling water. they are measured by raster, photoelectric coder, strain pressure sensor, thermocouple and turboflowmeter

    系統需要進行監測的參數有五個,即有五路輸入信號:鑄輥位移、鑄輥轉速、鑄軋力、澆鑄溫度、冷卻流速,分別採用光柵、光電編碼器、應變式力傳感器、熱電偶和渦輪流量作為測元件。
  12. This paper presents a new synthesized statistical method for acoustic detection data processing based on the contrast to and statistic & analysis on a great deal of data of acoustic detection, elastic modulus and tunnel operation conditions, which has been applied in many hydropower projects

    為此,通過對大量聲波、彈模數據和工程運行情況進行對比、統和分析,總結出了一種針對隧洞高固結灌漿效果的多種聲波測綜合數據統方法,並已用於多個電項目中。
  13. Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils

    通過多種技術方案比較,最終選擇了技術先進的砂墊層預抬高分級充法,論文工作主要由以下兩部分組成: ( 1 )砂墊層預抬高分級充法的適用性研究,其中包括砂墊層厚度、地基沉降與固結度、地基穩定性、降、地震作用下砂土液化的可能性等方面的算分析; ( 2 )施工監測與地基處理效果驗,其中包括油罐環梁基礎沉降速率與不均勻沉降程度、各分級充加載階段地基超靜孔與深層平位移、油罐底板力分佈及地基土強度增長等方面的實測與數據分析。
  14. A new full - wave measurement circuit structure is put forward that would increase distribution automation system reliability and veracity. the distributed protection and monitoring unit in this paper can instead of general instruments of low voltage distribution system. it not only combines ampere meter, voltage meter, active power meter, reactive power meter and power meter, frequency meter into a meter, but also increases monitoring position switch, control bus switching alternately and monitoring energy

    本文研製的保護和測控單元,可替代低配電系統中所使用的常規儀表,將原來迴路需要的電流表、電表、有功功率表、無功功率表和功率因數表、頻率表簡化為一塊表,並增加了位置開關量測,控制母線投切和電度監測功能,從而極大的簡化了低配電二次儀表設、安裝調試,提高了運行、維護和管理平。
  15. However, the geologic structure of the carstic formation is complicated and the design, construction, quality testing method of the high - pressure grouting is developing rapidly. we have engaged lots of experiments and studies in xiangshuiriver reservoir on this subject. one of the purposes subject is to guide the design, construction of the curtain grouting in the xiangshuiriver reservoir and optimize the grouting design, the other is to be a reference example for other similar engineering

    但由於巖溶地質條件的復雜性,且高灌漿作為一項技術和工藝,在設、施工、質量驗及效果評價等方面,仍然處在不斷發展的過程中,正是基於以上兩個方面的考慮,本課題結合響庫高帷幕灌漿工程進行了大規模的試驗研究,一方面指導帷幕灌漿的設與施工,達到優化設方案的目的;另一方面對試驗資料進行分析研究,以期對同類工程有所助益。
  16. Novel methods for measurement of intraocular pressure / volume and aqueous fluid production / outflow were applied in comparative studies of wildtype mice vs. mice lacking aqp1 and aqp4 ( individually and together ). methods : aqueous fluid production was measured by in vivo confbcal microscopy after transcomeal iontophoretic introduction of fluorescein into the aqueous fluid

    創造性地設和建立了小鼠眼房動力學測量的系統方法,對野生型小鼠和通道蛋白敲除小鼠的眼內、房容積、房生成和排出等生理特徵,分別進行了系統測和對比分析。
  17. Finally, the paper expatiates the realization process of this design, including the rotation equipment management, the static equipment management, examines and service project management, the electrical management, the meter computer management, the water quality management, the lubricating oil management, the static seal management, the craft pipeline management, the bearing management, the pressure vessel

    最後,文章對系統的設實現過程進行了闡述,分別對大慶石化總廠設備管理系統的轉動設備管理、靜設備管理、維修劃管理、電氣管理、儀表算機管理、質管理、潤滑油管理、靜密封點管理、工藝管線管理、軸承管理、力容器管理、安全閥管理進行重點描述。
  18. By way of comparing the results obtained from netting theory, compound theory, nonlinear fem and experimental test, the conclusion could be drawn that matrix crack damage surely existed in the cylinder part of structure. when the structure was subject to internal pressure up to 6. 8mpa, which was the maximum loading of hydrostatic test, the deformation of the global structure and stress and strain distributed in any parts of structure were obtained

    通過對網格理論、復合理論和非線性有限元方法算結果與試驗值之間的相互比較,可以看出:非線性有限元算結果介於網格理論和復合理論之間,且有限元算結果與復合理論結果更加接近,表明在力下殼體筒段確實存在著基體開裂等損傷。
  19. With the scale of social production extends and the production horizontal exalts, the electricity control technique and the hydraulic technique all develop very quickly. electricity control technique developed from the relay system to the direct digit control ( ddc ) system the disperse control system ( dcs ) to the fieldbus control system ( fcs ). the modem hydraulic control technique have developed to a complete automation which include of transmit control testing computer technique, and gradually turn to the digit control and full - automatic control

    隨著社會生產規模的擴大、生產平的提高,電氣控制技術和液技術都在非常迅速的發展。電氣控制從繼電器控制系統發展到直接數字控制( ddc )系統、集散控制系統( dcs )到目前的現場總線控制系統( fcs ) 。現代的液傳動及控制技術已發展成一門集傳動、控制、測、算機一體化的完整的自動化技術,並逐步趨向數字控制和全自動化。
  20. The results of case a and case b were about the same, thus it was displayed that modifying structure did not cause the bursting under low pressure but the damages of the structure. second, an analytical model was developed to assess the critical buckling problem of near surface interlaminar rectangular defects in the cylindrical part of srmcs under axis and interior pressure loads. the relationships between critical strain value and the parameters of geometry and radius of cylindrical were discussed

    在最大力為力的作用下,應用有限元算出殼體的整體變形以及不同部位的各種應力(不同應力分量)和位移分量,與試驗結果均比較吻合,證明採用大變形方法分析殼體宏觀應力和變形是合理的, a殼體與b殼體的應力、變形情況基本相同, b殼體發生低爆破不是由於結構參數的調整造成,而是由於各種試驗導致的累積損傷造成的。
分享友人