水泥釘 的英文怎麼說
中文拼音 [shuǐnídīng]
水泥釘
英文
masonry nail-
The paper also has a research on the influence of compound soil nailing behavior in the perspective of silt and hardpan of the effect of the width of soil - cement mixing piles. 3. with the analysis of various effecting factors on compound soil nailing, the paper holds a analysis of the mechanism ’ s essence of the compound soil nailing
2 .深入分析了土體的彈性模量,水泥攪拌樁的彈性模量,水泥攪拌樁擋墻的寬度,土釘長度的變化以及土釘傾角的變化對復合型土釘墻變形性狀和土釘軸力的影響,以及水泥攪拌樁擋墻的寬度在淤泥土層以及砂土土層中對復合型土釘墻支護變形性狀的影響。In the early times, we once lived on a piece of land where there was a dilapidated house leveled almost to the ground. master was able to build a simple house on the remaining foundation and walls. she did everything herself, mixing concrete, laying bricks, plastering walls, setting up wooden frames, hammering big nails, and even doing the plumbing
當時我們所住的那塊地上,有一處幾乎只剩地基的斷垣殘壁,師父就順著它所殘留的形勢在地上繼續蓋起一棟簡單的房子,從拌水泥砌磚塊抹墻壁架木頭槌大釘接水管等等,無不親自動手。Biomechanical efficacy of calcium phosphate cement in augmentation and restoration of anterior cervical unicorti - cal screw fixation
磷酸鈣骨水泥加固頸椎前路單皮質骨螺釘的生物力學研究Railway fixed equipment. special rail screws for concrete sleepers
鐵路固定設備.水泥軌枕專用鋼軌螺釘1 put wooden frames on the dry ground. the cement must dry enough if it will be used to support the wooden frames, then do the next step
1 、在乾燥的地面上鋪釘木櫳骨(木擱柵) ,並較好木櫳上水平面,如用水泥砌固櫳,則應在水泥充分干固后再做以下步驟。Suspension construction method : use saws to cut the plywood 9 c 12mm thick into square blocks sized between 600 c 120 mm and securely nail them into the concrete ground at an interval of 20 mm
步驟3 :墊層鋪設1懸浮施工法:將9mm - 12mm厚的夾板鋸成600mm - 120mm的方塊間隔20mm釘牢水泥地面。Soil nailing near wsd catchwater has been completed and grouting for piling at the central pier of bridge no. str17 will commence
鄰近於長沙引水道的泥釘工程經已完成,與及將會為橋編號str17的中間橋墩展開樁柱灌漿的工程Two or three water towers, the backs of two or three steel frames for billboards, perhaps a spire or two, and a stretch of asphalt roofing material and bricks going up in square, sharp, vertical outlines without any form or order, sprinkled with some dirty, discolored chimneys and a few washlines and crisscross lines of radio aerials
兩三座水塔,兩三個釘廣告牌的銅架,一兩座尖塔,一望相連的瀝青的屋頂材料和磚頭,形成一些四方形的、矗立的、垂直的輪廓,完全沒有什麼組織或次序,點綴著一些泥土,退色的煙突,以及幾條曬著衣服的繩索和交叉著的無線電天線。All the complications happened in either the patients receiving cemented intramedullary nail for pathological femoral fracture or cemented bipolar hemiarthroplasty for hip fracture
所有的這些心臟血管衰竭並發癥發生在病理性股骨骨折接受骨水泥骨髓腔內鋼釘的病人,或股骨頸骨折接受骨水泥兩極式人工股骨頭置換術的病人。The timing of onset of cardiovascular collapse most occurred immediately after impacting the implant into a cemented canal, but it might delay ten minutes as in our cases
在我們的報告中,發生心臟血管衰竭並發癥的時間大部分是在將骨內鋼釘或兩極式人工股骨頭打入灌有骨水泥的骨髓腔后馬上發生,但可延遲到十分鐘后才發生。Treatment of lumbar spondylolisthesis with posterior decompression, spinal fusion and rf pedicle screw spinal system
椎體間蝸柱骨水泥充填結合椎弓根釘內固定治療腰椎滑脫癥Biomechanical characteristics of calcium phosphate cement in the reinforcement of vertebral pedicle screw fixation
磷酸鈣骨水泥強化椎弓根螺釘固定的生物力學特性Augmentation and restoration of pedicle screw fixation by calcium phosphate cement : an in vitro biomechanical study
磷酸鈣骨水泥強化和修復椎弓根螺釘的生物力學研究Landslide hazard mitigation works including earthworks, installation of soil nail, concrete check dam and flexible boulder fence, drainage works and maintenance access road works
山坡災害防護工程,包括土木工事、裝設泥釘、擋土堤和柔性防石欄、排水工程和維修通道工程。Application of cement mixed pile and composite soil - nailed wall support to deep foundation pit on silt - clay stratification and relevant emergency treatment in dangerous situation
水泥攪拌樁復合土釘墻支護在淤泥質粘土深基坑的應用及危機狀態下的應急處理Thirdly, study on one kind of composite soil nailing, that is, a combination of soil nails with waterproof cement - soil mixing pile wall, were carried out by the theory of elastic foundation beam
第三,對土釘與水泥土樁聯合支護型式中的面層進行了理論分析,並通過實例計算來驗證理論分析的正確性和合理性。During the stability analysis, the safety coefficient and the most dangerous slipped layer of soil slope retained by compound soil nailing was studied. the stability of soil nailing was calculated. then, the influence functions of water, prestressed anchor and cement - soil retaining wall and front small - piles in the compound soil nailing system were studied
在穩定性分析中,研究了復合土釘支護時土坡穩定的安全系數:介紹了最危險滑裂面的確定方法並採用幾何參數控製法來確定土體的最危險滑裂面;計算了土釘支護土體時的穩定性;研究了水、預應力錨桿(索) 、水泥土攪拌樁以及超前微樁對復合土釘支護時土體穩定性的影響作用並給出了相應的計算公式。Secondly, a study of one kind of composite soil nailing, that is, a combination of soil nails with waterproof cement - soil mixing pile wall, was carried out by laboratory model test, the retaining structures were modeled according to a similarity rule that geometric length of the structure is in inverse proportion to deformation duration of the structure and the staged excavation and retaining was carried out during experiment to simulate actual construction procedures in situ
其次,通過模型試驗研究了土釘與水泥土樁聯合支護型式的變形、破壞形態以及作用原理。試驗模型箱為無蓋六面箱體,內空凈尺寸長寬高為3 . 4m 1 . 0m 2 . 0m ,試驗填料為重塑土,土釘採用硬質鋁管。分享友人