水洞底 的英文怎麼說

中文拼音 [shuǐdòngde]
水洞底 英文
shuidongdi
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  • : 底助詞(用在定語后, 表示定語和中心詞之間是領屬關系, 現在多寫作「的」)
  1. To pass its threshold was to return to stagnation ; to cross the silent hall, to ascend the darksome staircase, to seek my own lonely little room, and then to meet tranquil mrs. fairfax, and spend the long winter evening with her, and her only, was to quell wholly the faint excitement wakened by my walk, - to slip again over my faculties the viewless fetters of an uniform and too still existence ; of an existence whose very privileges of security and ease i was becoming incapable of appreciating

    踏進門檻就意味著回到了一潭死之中,穿過寂靜的大廳,登上暗的樓梯,尋找我那孤寂的小房間,然後去見心如古井的費爾法克斯太太,同她,只同她度過漫長的冬夜,這一切將徹澆滅我這回步行所激起的興奮,重又用一成不變的靜止生活的無形鐐銬,鎖住我自己的感官。這種生活的穩定安逸的長處,我已難以欣賞。
  2. In order to detect the bottom thickness, cavity, leak and deformation of steel meshes in secondary lining of concrete in tunnel construction, the authors evaluate the wave character and the detected result in the second lining of the tunnel using surveying radar technology and conclude the wave character in the tunnel lining which has mass defect and tested the accuracy and reliability of this technique

    摘要為檢明隧道混凝土二次襯砌中的界厚度、空、漏、鋼筋網變形等質量問題,利用探地雷達技術,通過對檢測方法及工程檢測實驗的研究,進行隧道二次襯砌中雷達波形特徵參數及檢測結果評價,總結了隧道襯砌質量問題的雷達波形特徵,驗證檢測方法的精度和可靠性。
  3. We find that the petrology characteristic of all the samples have no characteristic of meteoric water such as geopetal structure, infiltrative sand, ( uniform cement and gravitational cement on base of the research of the dolomite in the regions. on the dot diagram of combination of mgco3 ( mol % ) and sr, the dot are all close to the line of seawater whether they are microlite - crystalline penecontemporaneous dolostone or diagenetic dolostone of various crystals. the 87sr / 86sr value of dolostone or matrix is less than the one of sparry calcite in cave or vein, and close to the value of seawater

    通過本區白雲巖的研究發現:已有的白雲巖樣品的巖石學特徵沒有顯示出如示構造、滲濾沙、新月型膠結物和重力膠結物等大氣淡作用的特徵;在白雲石mgco _ 3mol百分數和白雲石sr含量的投點圖中,無論是準同生成因的泥?微晶白雲巖,還是粉?細晶(或中晶,或細晶以上的不等晶)的成巖白雲巖,均投在海線的附近;白雲巖(或基質)的~ ( 87 ) sr / ~ ( 86 ) sr比值顯著低於與孔或脈中充填的亮晶方解石,且與海值十分接近, ~ ( 13 ) c和~ ( 18 ) o值顯著高於孔或脈中充填的亮晶方解石,也偏向于海值; mn含量則顯著低於孔或脈中充填的亮晶方解石。
  4. After a rain part of the water seeps into these openings and percolates beneath the land surface.

    雨後,部分的就滲進這些隙,並在地下滲透。
  5. Within the scenic beauty of beautiful scenery and lush vegetation, a clearance from the mountain watershed qingxi from the caves before flowing north cliff towering cliffs, rock dives ; flowing water trough, the ghost suddenly so far

    該景區內景色秀美,林木蔥郁,一條源於關山分嶺的清溪從窟前流過,北崖峭壁高聳,危石凌空;谷淙淙,幽冥渺遠。
  6. The many different kinds of stalactites, stalagmites, and columns found here are both beautiful and amazing

    有奇形怪狀的鐘乳石筍和石柱,下更有無池等景觀,可以說是別有天。
  7. And 14 species associated with tufa deposition at cave entrance, 4 travertine types of bryophytes can be distinguished : stalacitite, travertine on cave wall, floor seepage, droping - water travertine

    14種穴苔蘚植物參與了口鈣華沉積,沉積形態包括鐘乳石、壁鈣華、泉華和鈣華4種類型。
  8. Evidence that the above - imaged plates really are dust - covered water - ice includes a similarity in appearance to ice blocks off earth ' s antarctica, nearby surface fractures from which underground water could have flowed, and the shallow depth of the craters indicating that something is filling them in

    支持如上面影像的扁盤的確是被沙塵所掩的冰的證據有:它有著與地球南極的冰塊相似的特徵、附近地表凹凸不平的部分曾經有被地下淹沒的痕跡、影像中淺的隕石坑也許表示有某種東西填滿了坑
  9. But isn ' t it like pouring water into a bottomless pit

    但不就像往無里倒一樣嗎
  10. Returned to the edge of the precipice and see myself have a cave along the winding down the stairs, enter the cave, in the water beside the paths, pick up a three charge

    退回,來到懸崖邊,看到崖有一山,沿著蜿蜒的石階往下,進入山,在棧道旁的裡拾到一個三分管。
  11. The days of his youth appeared like dreams before him, and he recalled the serious moment when his father placed him at the entrance of the two roads - - - one leading to a peaceful, sunny place, covered with flowers, fruits and resounding with soft, sweet songs ; the other leading to a deep, dark cave, which was endless, where poison flowed instead of water and where devils and poisonous snakes hissed and crawled

    年輕的時光像夢一樣在浮現在眼前,他回想起那個關鍵的時刻,父親把他帶到人生的岔路口,有兩條路擺在他面前:一條通往一個寧靜的、陽光燦爛的地方,那裡滿是花果,柔和甜美的歌手回響在空中;另一條卻通往一個黑暗無穴,那裡流淌的不是清,而是毒汁,那裡惡魔肆虐,毒蛇橫行。
  12. Never seen a white algae bed before

    從來沒見過有白色
  13. Through discussion of numerical solution, the author get the effect of height of filled soil, size of culvert, width of valley, property of filled soil, construction procedure and techniques on soil stress of the culvert top ; 3. through the centrifuge test, the paper validates the reliability of numerical calculating on high - stack soil ; 4. the paper puts forward the simplified calculating method of soil stress of the culvert top on the foundation of numerical simulating and centrifuge modeling

    通過對數值解的討論,得到填土高度,涵截面尺寸,溝谷部寬度,溝壁坡角,填築體性狀,施工速度,地下對豎向位移場及涵頂部土壓力的影響情況; 3通過離心機的模擬試驗,驗證了數值計算對高路堤的計算結果的可靠性; 4在數值模擬和室內離心機模型試驗的基礎上,提出了高填方涵頂部土壓力簡化計算方法。
  14. The collapsible loess is often met during the construction of the high - grade highway in the loess area, and the main failure is the uneven subsidence of the roadbed and the culvert, which affects the safe usage of the roadbed and the culvert, etc. directed against this, based on the chankou - lanzhou freeway construction, the paper analyzes the application of the composite ground formed by lime - soil pile under the bridge and designs the project, discusses the rules of the contact pressure, the stress ratio of the pile and the soil, compares the p - s curves of one pile, the composite ground formed by one pile and the composite ground formed by two piles based on the in - situ plate loading test, evaluates the bearing capacity of the composite ground of the project

    黃土地區的高等級公路建設中經常遇到濕陷性黃土問題,其病害類型主要是地基土受浸濕后引起路基、橋臺、涵等的不均勻沉降,直接影響路基、構造物等的正常使用。針對此問題,本文依託甘肅讒口至蘭州柳溝河高速公路建設工程,對橋基灰土樁復合地基應用的可行性進行了深入分析,根據具體工程進行了合理的設計與計算,並配合現場靜載荷試驗及壓力盒實測數據,探討了基應力分佈規律,樁土應力比,變形模量的變化關系,對比分析了單樁、單樁復合和雙樁復合的p ? s關系,對橋基灰土樁復合地基承載力進行了整體評價。
  15. To solve the frequent ash and slag stacking in the ash - pit under the 600 mw supercritical boiler for huaneng shanghai shidongkou no. 2 power plant, the high resolution acoustics imaging real - time monitoring system was developed using underwater acoustics imaging technology

    摘要結合華能上海石口二電廠600mw超臨界鍋爐爐灰坑頻繁堆渣排放的實際情況,利用下聲納成像技術,開發了高解析度聲納成像實時監視系統。
  16. The abnormalities in the seasons and the weather, the rapid melting of the polar ice cap, the rising temperature of the oceans, the continuous expansion of the hole in the ozone layer, the acid rain given back to us by mother earth, sinking land masses and rising sea levels - what do all these reactions of the natural environment tell us that things turn for the worse when they reach the extreme seems not to be something which people take heed of

    人類賴以生存的地球已是岌岌可危,生態環境在不斷的破壞下已產生了顯著的變化,四季氣溫異常北極冰巖急速溶化海溫高漲臭氧層的破繼續擴張大自然「還贈」給人們的酸雨陸地下陷海平面上升,這種種的自然界反應到給了我們什麼啟示?物極必反的道理,似乎很難在人們心中起警惕的效應。
  17. At a clear night the moon seems to fall on the bottom of the water and at the same time float on the water surface

    倒影清流,構成「有明月,上明月浮」的奇觀。
  18. Sometimes it stayed underwater for as long as an hour, possibly sleeping inside rock crevices or hollows

    它間中亦會躲在個多小時,很可能是在的石縫或穴中睡覺。
  19. 1. under the same kind of wall rock and the same condition, displacement of pipe liner is symmetry, for tunnel structure and suffered load are symmetry. as level terra stress is bigger, the maximum of displacement and the first main stress occur in tie - in of pipe liner structure, and its direction is radial and points in hole ; the direction of the third main stress is annular and its maximum occurs in top and bottom hole inner

    1 、同一類圍巖在同一種工況下,由於結構和荷載的對稱性,管片襯砌結構的位移也表現出對稱性,因平向地應力較大,位移最大值、第一主應力的最大值發生在管片襯砌結構的接頭處,方向為徑向指向內;第三主應力的方向為環向,較大值發生在頂和內側。
  20. Large benthic aquatic animals in caves along the shouchang river and its adjacent areas

    壽昌江流域及鄰近山區溶巖穴大型棲動物
分享友人