水深計 的英文怎麼說

中文拼音 [shuǐshēn]
水深計 英文
fathometer
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ形容詞1 (從上到下或從外到里的距離大) deep 2 (深奧) difficult; profound 3 (深刻; 深入) thor...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 水深 : depth of water水深計 water gage; 水深圖 fathogram; bathygram; 水深儀 fathometer
  1. Application of bathymetric adjustment system for bathymetric survey

    平差系統設及其在測量中的應用
  2. Also to get some new conclusion of glacial lakes burst floods, in possibility study of glacial lake burst, and in qualitified study of the safety of the glacial lakes. the first character of this paper introduce the background of this paper, set the goal, content and methodlogy of the study work in this paper. the second chapter of this paper focuses on the meterological character, runoff composition character, why not correspondency of ratio of rainfall and runoff in same period to annual value for nianchu river, lasha river, niyang river and the middle reach of yalu - zangbu river

    本文第一章介紹了課題的研究背景,提出了研究目標、內容和方法;第二章重點分析了年楚河、拉薩河、尼洋河和雅魯藏布江幹流中游段的氣候特徵,徑流組成特性,同期降、徑流占年總量比例的不對應特性和原因,徑流年內年際變化規律及徑流分佈特性,分析了天然洪的特點和洪參數;第三章介紹了冰川終磧湖的特點,結合已經發生潰決的冰川終磧湖的有關調查資料和考察資料,分析提出了危險冰湖判別指標和發生潰決的氣候條件、周期性特徵,提出了冰湖潰決洪算途徑。
  3. Using the model experiment data, the authors calculate the decreased percentage of water jump length, unit width hydraulic jump volume and the water depth downstream of the jump ; and also calculate the energy dissipation rate of dentoid baffle, it is concluded that the device of dentoid baffle can increase the energy dissipation rate of hydraulic jump theory and decrease the engineering cost

    算了新增齒墩設施的消能量,同時算了新增齒墩設施的躍后躍長度和單寬躍容積減少的百分數。結果表明,採用齒墩設施,可增進消能作用,並取得顯著的經濟效益,達到附加射流躍理論所預期的效果。
  4. The water - depth computer monitoring system collects data from gps, multi - frequency fathometer ( 16 frequencies ) and plc network. based on the analysis of these data, a three - dimensional underwater ground profile is presented for the scheduled area of geotextiles - laying, the development tool of the three - dimensional underwater ground profile is opengl. this thesis is organized into five chapters

    水深計算機監控系統採集來自gps 、多通道測儀( 16通道)以及plc網路的數據,將這些數據進行處理后,顯示待鋪設軟體排的小區域內的三維下地形,三維地形的開發採用目前國際上流行的三維圖形介面opengl 。
  5. The discussion and reason for fire water design of szcec

    圳會議展覽中心方案消防給論證綜述
  6. This procedure can imitate the single well pumps water the chronometer calculates at all point water level in district declines deep with horary variety ; study the sport law of the rivers ; solve definitely flow draw water issue wanton boundary the wells of termses, predict that dives under water in the location, guide and construct and excavate the progress, appraise the rationality of the precipitation scheme

    此程序可以模擬單井抽算區域各點位降隨時間的變化,研究流運動規律;求解任意邊界條件下的井定流量抽問題,預測潛位,指導施工開挖進度,評價降方案的合理性。
  7. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文通過試驗研究與理論分析對旋流式豎井泄洪洞應用於高頭、大泄流量情況時存在的一些力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高頭( 252m ) 、大泄流量( 1400m ~ 3 s )條件下旋流式豎井中的流運動特徵進行了比較全面的測量,包括空腔形態、徑向流速分佈及井壁壓強等;二、提出了豎井空腔段螺旋算方法,其算結果與實測值吻合良好;三、利用試驗與算結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能力有了總體認識;四、對豎井下部消力井的合理井進行了優化試驗研究,發現消力井合理度為0 . 9d左右;五、通過試驗研究,歸納出豎井流總摻氣量估算方法,為導流洞排氣方案的設提供了參考依據;六、在高頭、大流量條件下,豎井空腔段下部流速很高,盡管流螺旋運動引起的離心力可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。
  8. Because the elevation data we have acquired through gps is too variable to satisfy the mapping accuracy requirement the elevation value is solved by the water lever observation in the hydrology station and datum horizon correction of sounding observation

    由於gps的rtk模式測量所獲取的高程精度不能滿足測圖精度要求,因此其高程值是通過測量值、結合其統一到基準面的改正數、根據相關文部門各位站提供的位觀測資料綜合算獲得。
  9. ( 3 ) hydraulic resistance coefficient formulas are derived according to a great number of flume experiments and relative theory analysis

    ( 3 )通過系列槽試驗和相關理論分析,提出了十字片梅花加糙的有效力阻力系數算公式。
  10. At present, the studies about the controlled alternate furrow irrigation are focused on how it affects the water physiological indexes, water consumption and yields of crops. but, some problems suc h as the soil infiltrative parameters, irrigating water advancing, water redistribution in soil, calculation of crop water requirement and water consumption, and the upper and lower limit indexes of soil moisture, guiding a field irrigation after the controlled alternative furrow irrigation is implemented in field, have not been researched systematically and deeply. if these problems could not been solved commendably, the popularization of controlled alternate furrow irrigation will be affected

    然而,目前有關交替隔溝灌溉的研究還主要集中於這種灌方式對作物分生理指標、耗量和產量的影響方面,而對大田採用這種灌式后的土壤入滲參數變化情況、作物需量與耗算、以及指導大田灌溉的分下限控制指標等與大田生產實際密切相關的幾個問題基本上還沒有進行系統的入研究,而這些問題如不能得到很好地解決,勢必會對這種灌方式的推廣應用產生嚴重的影響。
  11. This article is based on statistic and analysis of the long - term observation data of the groundwater in the karst basin from 1987 to 2005 and systematically discusses the water level of karst groundwater, the pumping volume and the carved distribution regulation because of over - pumping water and puts forward some specific measures to reasonably development and utilization of groundwater resources

    摘要通過覆蓋型盆地巖溶盆地中取井1987年2005年盆地地下長觀資料統分析,系統探討了宕溶地下位、取量以及抽產生的塌陷分佈規律,提出了合理開發利用地下資源的具體措施。
  12. This thesis develops computer monitoring system of water depth of the automatic control system for the geotextiles - laying boats used for the yangtze river

    本課題依據長江航道鋪排船自動控制系統,完成鋪排船集控臺上水深計算機監視系統的開發,研究下地形的模擬和再現。
  13. The value calculated by the new model approximates the measure data, and the value that calculated by the whole depth mixing 2d model is much less than the measure data in the near field. this model is also superior to the traditional 2d model for its precision

    可以看出,新建的部分平均質模型算值與實測值符合較好,而傳統的全平均模型在排放口近區范圍內算濃度值及污染帶范圍明顯小於實測值。
  14. Water impact calculation and protection measures for water drainage in deep mine

    井排算及防護措施
  15. Uning the experimental data, the dec r eased percentages of conjugate depth, length of hydraulic jump or unit width hydr a ulic jump volume with the increased dissipated energy facilities are calculated

    並通過模型試驗驗證了消能的理論分析,算了新增設施的消能量、躍后躍長度或單寬躍容積減少的百分數。
  16. The economic benefits of new additional energy dissipation facilities are estimated in terms of the decreased percentage of the sequent depth of hydraulic jump and length of jump, or the capacity of hydraulic jump under the unit width. the additional flow hydraulic jump theory has been demonstrated by model tests

    文中用新增齒墩設施的躍后躍長度和單寬躍容積減少的百分數,估新增設施的經濟效益,並通過模型試驗驗證了附加射流躍消能的理論分析。
  17. In the test of transmission coefficient property, semi - circle type, rectangle type, trapezoid type and concave type dyke are studied. research study is on the effect of relative water depth over the dyke to the transmission coefficient of the four different types dyke, and the comparison is done. finally, the experimental formula is given to the transmission coefficient, which are compared with the present formulae

    在潛堤透射特性的研究中,選取半圓型、矩型、梯型和槽型潛堤作為研究對象,在分析各個影響因素對潛堤透射影響的基礎上,選取最主要的影響因素,即相對堤頂作為研究的重點,分析研究了堤頂相對對四種結構型式潛堤透射系數的影響,比較分析了四種結構型式潛堤透射特性,在此基礎上,總結了算潛堤透射系數的經驗公式,並與已存在的算公式進行了對比,最後對潛堤的促淤效果進行了評估。
  18. Through the physical model experiment, the wave forces over submerged dyke and transmission coefficient are analyzed under the action of regular wave. in the test of wave forces, the rectangle - type submerged dyke is used as research object, and when analyzing the total wave forces, the effect of water depth before the dyke and that of the wave parameters is considered. based on the test, through the methods of multi - element linear regression, experimental formulae are given to calculate maximum total wave forces in horizontal direction, its relative vertical wave forces and maximum wave forces before and after the dyke, which are compared with the present formulae

    在潛堤波力的研究中,選取矩型潛堤作為研究對象,在分析各個影響因素對潛堤波力影響的基礎上,選取兩個最主要的影響因素,即相對波高和相對作為研究重點,在物理模型試驗結果的基礎上,定性地研究分析了潛堤所受的總波力隨相對波高和相對的變化規律,並在此基礎上,利用多元線性回歸的方法,分別給出了在本文試驗條件下算潛堤最大平總波力及其相對應的垂向總波力的經驗公式以及算堤前堤后最大總波力的經驗公式,並與已存在的算公式進行了對比。
  19. Design and construction of dewatering system of extra large deep foundation trench

    特大型基坑降與施工
  20. The shoreline is 423. 5 km, and the channel 13 m deep and 250m wide. by september 2007, the channel from guishan to nansha will be deepened to 15. 2 m

    廣州港岸線長達423 . 5公里,珠江口至黃埔港區的墩頭西基調頭區,航道- 13米,底寬250米。劃到2007年9月份,桂山至南沙航段航道到- 15 . 2米。
分享友人