水熟混凝土 的英文怎麼說

中文拼音 [shuǐshúhúnníng]
水熟混凝土 英文
water cured concrete
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 熟形容詞1 (植物的果實完全長成) ripe 2 (加熱到可以吃的程度) cooked; done 3 (加工製造或鍛煉過...
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. Construction of a mass concrete is in the construction process, because of cement let out in large quantity hydration heat and surface of a mass concrete let out heat, make its temperature, humidity cause to ascend and descend, and it causable constringency transform will be unavoidable

    大體積結構在施工過程中,由於化時放出大量的化熱及其隨后的表面散熱,使其溫度、濕度出現升降變化,並由此而引起的收縮變形將是無法避免的。
  2. Recent years, with the full - blown development of the prestressed concrete technique, the prestressed technique with ring - like strands as the professional technique adapted to the penstock, has been applied to many civil engineering fields such as tunnels and surge shafts in civil engineering hydraulics and power engineering, containment shells of nuclear power station, industrial storage bunkers, digesters and conservation pools in municipal engineering

    近年來,隨著預應力技術的成化發展,環形預應力作為適應壓力管道結構形式的專業技術,廣泛應用於電工程隧洞和調壓井、核電站安全殼、工業儲料倉、市政工程消化池和蓄池等諸多領域。目前,預應力壓力管道已得到了越來越多的重視和研究。
  3. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟的加速發展及西部大開發戰略的實施,我國電事業也迎來了迅猛發展的大好時機,一批高壩電站正在建設或規劃之中,其泄建築物孔口及頭愈來愈大,常規或鋼筋閘室閘墩結構難以承受如此之大的推力作用,隨著預應力技術的成,這一技術已成為解決該問題的關鍵技術措施之一。
  4. Chengzhi, z., w. aiqin, and t. mingshu, “ the filling role of pozzolanic material ”, cement and concrete research, vol. 26, no. 6, pp. 943 - 947 ( 1996 )

    陳清泉、陳振川、袁宏續和詹穎雯,爐石為料與填加料對特性影響之文獻及國外淚況調查研究,營建研究中心( 1987 ) 。
  5. B47 breaker is a pneumatic instrument manufactured with the mature technology of america gardener denver corporation. featuring portability, durability, great efficiency and speed, the breaker can break ferroconcrete, rocks and asphalt. it is ideal machinery for the construction and backout of mines bridges, roads, water pipes and electricity grids

    B47破碎機採用美國迦納德?丹佛氣動集團公司成技術,以壓縮空氣為動力的破碎工具,能高效完成鋼筋、巖石、瀝青等的破碎工作,具有輕便耐用,快速高效等特點,是礦山、橋梁、道路、、電管網施工搶修及拆除的理想工具。
  6. This paper analyzes how structure characteristic of old concrete pavement affects the load stress of asphalt overlay by the three dimensions finite element analysis program - adina. ( 2 ) the asphalt overlay design in rehabilitation of old cement concrete pavement asphalt overlay design not only relates the distress, structure characteristic, traffic and environment of the old pavement, but also requires reasonable mechanics model, correct material parameter, effective measure of preventing reflection cracking, and so on

    ( 2 )舊路面瀝青罩面改造中瀝青罩面層的設計舊路改造的罩面設計方法不僅涉及舊路面的損壞、結構狀況、交通狀況、環境因素,而且還需要合適的力學分析模型、正確的材料參數、有效的防反射裂縫措施等,內容廣泛、復雜多變,至今尚未有成的設計方法。
  7. So there is still not a matured design method up to now. this paper introduces several relatively matured design methods and puts forward some problems which require more study. this purpose is to accelerate the study of asphalt overlay design in our country

    本文介紹了目前相對成的幾種罩面設計體系,並加以評析,提出今後尚需研究的問題,為促進我國對考慮反射裂縫的舊路面上瀝青罩面設計方法的研究提供參考。
分享友人