水管開關 的英文怎麼說

中文拼音 [shuǐguǎnkāiguān]
水管開關 英文
stopcock
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ動詞1 (使開著的物體合攏) close; shut 2 (圈起來) shut in; lock up 3 (倒閉; 歇業) close down...
  • 水管 : waterpipe; water carrier; aqueduct; water conduit; water pipe; syphon; siphon (消防) 水管車 hos...
  1. The central control room of the branch is located in the bank of communications plaza in the lujiazui, shanghai, which adopts the xbrother developed professional security and facility control system which monitors and controls 10 subsystems in the central control room, including : the ups control system ; the coulometer control system ; the leaking control system ; the temperature and humidity control system ; the air conditioning control system ; the video surveillance system ; the sensor of in out water temperature control system ; the access control system ; the switch control system and ; the fire alarm system

    交通銀行機房位於上海浦東新區陸家嘴金融中心的交銀金融大廈內,其機房監控系統採用我司自主研製的專業機房監控系統。對機房內的ups監控系統電量儀監測系統漏監控系統溫濕度監控系統空調監控系統視頻監控系統進出溫傳感器監測系統門禁監控系統狀態監控系統消防監控系統等10個子系統進行集中監控,對所有的設備和系統進行工作狀態運行參數報警處理等監視和理。
  2. Rabbit turned off the tap then took the hosepipe from tigger. " i ' ll water the flowers ! " he said. " wait until i go out in the garden then turn on the tap.

    瑞比龍頭,從跳跳虎手裡奪下,告訴跳跳虎: "我自己來澆花!記住,等我回到花園里,你再打龍頭!
  3. It is by an electric pump pressure jar, tube of switch stone of the pressure and water gate make up

    它由一個電泵壓力缸,壓力四通閘門組成。
  4. The central authority - in - charge shall guide and assist persons who have developed hot springs prior to the enforcement of this act

    本法施行前,已發溫泉使用者,主應輔導取得權。
  5. An asian ministerial round table dialogue on water sector challenges, policies and institutional development was organized in may 2002 by escap, in collaboration with the international water management institute, the asian development bank and the government of thailand

    亞太經社會與國際理研究所、亞洲發銀行和泰國政府合作,於2002年5月舉辦了一次部門挑戰、政策和體制發展的亞洲部長級圓桌對話。
  6. Article 7 to assist existing enterprises that have already developed hot spring utilization in hot spring areas to comply with the provisions of the law concerning land and building use, the municipal or county ( city ) government with due jurisdiction may first draw up an assistance program setting out the scope, targets, conditions, implementation period, and other relevant matters of the assistance, and after submitting it for review by the ministry of transportation and communications and other authorities in charge of land use, buildings, environmental protection, water and soil conservation, agriculture, water resources, and so on, submit it to the executive yuan for approval

    為輔導溫泉區內現有已發供溫泉使用事業使用之土地、建築物符合法令規定,直轄市、縣(市)政府得先就輔導?圍、對象、條件、辦理時程及相事項,研擬輔導方案,報請交通部會同土地使用、建築、環境保護、土保持、農業、利等主審查后,轉陳行政院核定。
  7. Article 9 in granting approvals for the operation of fishery, the competent authority may impose restrictions or conditions on the approval if so dictated for the development or conservation of fishery resources, or if it is in the public interest

    第9條(漁業經營核準之附款)為發或保育產資源,或為公共利益之必要,主于漁業經營之核準時,得加以限制或附以條件。
  8. The thesis is based on the sewage pipe network of wuhan zhuankou economical development zone, discussing how to design urban sewage pipe network gis

    本系統以武漢沌口經濟發區污網為基礎數據,探討了有城市污理信息系統( gis )的設計和實現的方法。
  9. Most of the switch tubes used presently work in the gas spark region ( the right branch of paschen curve ), and are made of graphite and mental such as tungsten, molybdenum, stainless steel and mercury

    目前實際應用的多數工作在火花放電區域(巴邢曲線的右支) ,使用的電極材料一般為鎢、鉬、不銹鋼、銀、石墨等。
  10. Licensees shall, pursuant to the water act or the mining act, apply for the hot spring water right or mining right to develop and subsequently apply for permits from the local authority - in - charge to operate the business

    溫泉取供事業應依利法或礦業法等相規定申請取得溫泉權或溫泉礦業權並完成發后,向直轄市、縣(市)主申請經營許可。
  11. With an aim to arouse public awareness on the protection of underground utilities ( gas, water, drains, power, telecom, etc ) and work safety in road excavation, a series of open competitions will be jointly organized by hong kong institute of utility surveyors ( hkius ), the hong kong the hong kong association for the advancement of science and technology ( hkaast ), and utilityinfo institute ( uti )

    為提高大眾市民保護地下設施(煤氣、渠、電纜、視訊等)及道路安全的認知,香港線測量師學會、香港工程師學會安全工程專責事務委員會、香港科技協進會及香港工程網路資料理中心現正聯辦一系列地下線相之大型公比賽。
  12. Preliminary studies suggest that the mutual relations of the security, economic and risk should be adjusted and made into organic unity during determination of design flood standards for construction, the concepts on the cascade exploitation of the river should be transferred from flood control to flood management, the design flood standards for construction at the initial, middle and later stages of high dam projects should be driven up gradually according to reservoir capacity

    初步研究認為,在施工洪設計標準選擇時,應處理好安全、經濟和風險相互之間的系,以達到三者有機的統一;在梯級發河流上應實施從施工洪控制到施工洪理的觀念轉移;高壩大庫工程的初期、中期、後期三個時段的施工洪設計標準應根據庫容等指標逐步抬高。
  13. The dc draining electromagnet zdt series is the main accessory for the household full - auto washers and acts as openingclosing the drainage valve when working after being rectified with a diode bridge rectifier

    直流排電磁鐵zdt系列是家用全自動洗衣機主要配件,經二級橋式整流后工作,主要起打閉排閥作用。
  14. In the base of analysis the water conservancy project ’ s management system history and actuality of our country, this paper point out some problems in the system, such as the property is not clear 、 personal exceed 、 the outlay is not enough 、 the system of insurance is not perfect ; bring forward something that can use reference in our country through introduce the water system of america 、 japan 、 holland ; then put forward the combine of construction and operation of water conservancy project, mainly study in feasibility research stage 、 design stage and building stage ; then, analysis the framework of pure - commonweal 、 quasi - commonweal and management water conservancy and point out the management system of water conservancy projects that suit in the conditions of our country. mainly in develop mixed farming 、 deepen in the system of personal 、 make correlation policy accelerate the reform of the water conservancy project system. at last, the author give some advice

    本文在分析我國利工程理體制歷史和現狀的基礎上,指出我國利工程體制存在的諸如單位性質劃分不準、人員超編、工程理經費不足、社保體制不健全等方面問題;通過分析日本、美國、荷蘭等國的利工程理體制,提出可供我國利工程理體制模式借鑒之處;進而提出新建利工程建設理和運行理有機結合的方法,主要從可研階段、設計階段、施工階段進行結合;然後按照利可持續發展戰略思想,探討適合我國國情的三類利工程理體制模式,分別分析純公益性、準公益性、經營性三類利工程理體制模式,研究出適合我國國情的利工程理體制模式;從展多種經營、深化人事制度改革、制定相政策等方面促進單位理體制的改革;在文章的最後,提出筆者的幾點建議和展望。
  15. High - pressure hose 10 m, pivoting stainless steel spray lance ( 850 mm ), triple nozzle 0 / 25 / 40, easy - press trigger gun woth soft grip insert

    帶軟護套引發槍, 10米高壓, 850毫米可旋轉不銹鋼噴槍桿, 7升清潔劑箱,無級可調壓和流量控制,壓力控制,凱馳專利高壓防纏繞設計。
  16. To expedite the exploitation of hydroelectric resources of huanghe upstream meets the request of western development, and is significant to the strategically overall arrangement of realizing the optimization deployment of resource and transporting clean energy to the east but, for a long time, in the electric market, the supply - and - demand analysis and the science - oriented, reliable forecast of electric network load is absent. in the developing gradation, the support of theory about hydroelectric plants " developing gradation is absent. in the pattern of management and development, a theoretical system of developing, management is absent, such as the relation of the synthetically utilization of hydroelectric development and water resource and environment should be brought into the unified planning and managing system of the valley

    但是長期以來,在電力市場方面,缺乏科學、可靠的電網負荷需求預測及市場供需分析;在發順序方面,缺乏電站發順序理論方法依據的支持,影響了發的層次和速度;在理模式方面,缺乏一套行之有效的發、經營及理的理論體系,比如發與資源綜合利用及與生態環境的系等,都應納入流域統一規劃、統一理的發利用理體系中。
  17. A new full - wave measurement circuit structure is put forward that would increase distribution automation system reliability and veracity. the distributed protection and monitoring unit in this paper can instead of general instruments of low voltage distribution system. it not only combines ampere meter, voltage meter, active power meter, reactive power meter and power meter, frequency meter into a meter, but also increases monitoring position switch, control bus switching alternately and monitoring energy

    本文研製的保護和測控單元,可替代低壓配電系統中所使用的常規儀表,將原來迴路需要的電流表、電壓表、有功功率表、無功功率表和功率因數表、頻率表簡化為一塊表,並增加了位置量檢測,控制母線投切和電度監測功能,從而極大的簡化了低壓配電二次儀表設計、安裝調試,提高了運行、維護和平。
  18. 1 the valve and the adjustment device of the boiler steaming - water pipe should be clearly marked, which should indicate the valve name, number, switch direction and working medium flowing direction, and the main regulating valve should have opening indicator

    1鍋爐汽道的閥門及調整裝置應有明顯標志,標明閥門名稱、編號、方向以及工質流動方向,主要調節閥應有度指示。
  19. Distributes pipings, gauges, meters, switches, valves, fittings, pumps, hoses, flow controls and related items

    -提供壓力控制器壓力液壓系統液壓成套避震軟等。
  20. Building in used with tubes for drinking water and used water. it ' s a great fortune that water will come out whenever we switch the tap on

    正在使用中的樓房,備有食和排污.原來打就有流出來,是一種幸福
分享友人