水處理措施 的英文怎麼說

中文拼音 [shuǐchǔcuòshī]
水處理措施 英文
elimination of water
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 處名詞1 (地方) place 2 (方面; 某一點) part; point 3 (機關或機關里一個部門) department; offi...
  • : Ⅰ名詞1 (物質組織的條紋) texture; grain (in wood skin etc ) 2 (道理;事理) reason; logic; tru...
  • : 動詞1 (安排; 處置) arrange; manage; handle 2 (籌劃) make plans 3 [書面語] (施行) execute; a...
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • 措施 : measure; step
  1. Goal model on system reform of the urban public healthcare facilities in china

    隧洞工中遇不良地質段的
  2. The article analyses the reasons for the main defects such as cracks, subsidence and ablations that existes in the irrigation collocation buildings such as aqueduct, clough and water fall and puts for ward some technical processing measures

    摘要文章對深史杭灌區配套建築物渡槽、閘、跌等存在的裂縫、沉陷、沖蝕等主要癥害原因進行了分析,提出了相應的
  3. This paper takes an example to show the key steps of this new technique, discusses the problems in the construction process, such as waterproof and reinforcement, and the experiences gained in the construction engineering

    通過一工程實例介紹了其實的方法、實效果,以及出現的問題及其補救和改進后的效果等,並對整環拼裝隧道結構的補強、防水處理措施等作了介紹,為類似工程的工提供了經驗。
  4. By careful analysis, we determined to adopt the treatment by grouting and laying on sr sealant, which was done in 2006

    在2005年檢查時發現大壩混凝土面板出現了若干裂縫,經過認真分析,確定採用灌漿和sr止材料的,於2006年進行了
  5. Analysis on usual accidents in underwater concrete pouring and its countermeasures

    下混凝土灌注常見事故分析及探討
  6. Abstract : the utilization and control measures of original artificial embankment in the tentative design of reservoir are introduced and the influences to the dam are also studied in many aspects

    摘要:介紹庫工程初步設計中對大壩原人工填土的利用及,分析了原填土對大壩安全的影響。
  7. A large of reservoirs had been built in our country in 50th ~ 70th last century, because of the condition at that time, some dam foundation had insufficient permeating control steps

    上世紀50 70年代我國興建了一大批庫工程,鑒于當時條件限制,不少工程對壩基防滲不足,造成較嚴重的壩基滲漏問題。
  8. Abstract : large transmission main pipe line engineering, treated foundation on deep muddy, thick backfilling ground is introduced in this paper, cement mixed combined earth foundation is designed and calculated, pipe bridge 、 pipe pass through dam and etc, technical measures are also introduced

    文摘:本文介紹深淤泥厚填土場地大型輸干管工程的地基泥攪拌樁復合地基基礎設計與計算及過橋管、過堤管等的技術
  9. This paper researches the influence of no treating, paving cement and fly ash paste, and paving cement mortar on rcc layer surface upon the ultimate tensile strain of placing joint of rcc layers under the condition of different interval of placement of rcc layers and different amount of binding materials

    研究在不同的層間間隔時間條件下,採用不同的膠凝材料用量,對碾壓混凝土層面分別採取不,鋪泥粉煤灰漿(簡稱泥凈漿) 、泥砂漿等對碾壓混凝土層面極限拉伸值的影響。
  10. The preventive treatments of the frost heaving of lining canals in seasonal frozen soil areas

    季凍地區路基中的分遷移機
  11. The improper excavating will bear capacity, water permeability, natural structure and geological structure worsenning the base rock of foundation., this ca n ' t be allowed to the water conservancy project building, especially to block water building. lt will not only increase the expenses happened of the remedy measure, but also lengthen building straight line time limit for a project of construction

    開挖不當將降低基巖的承載能力、增大基礎的透性、惡化基巖的天然結構和地質構造,這對於工建築物,特別是擋建築物是不能允許的,同時將會增加採取補救所發生的費用,延長建築物工直線工期。
  12. During the construction of concrete cut - off wall of the auxiliary dam in huangbizhuang reservoir, in the section with complex geographical condition, especially the closure section of concrete cut - off wall ( about 120m ), the deterioration of the underground water ' s flow state and the existence of the overseep channel in the stratum result in the several collapses in the dam crest. through the analysis of ever } 1 collapse ' s reason, the proposal of handling measure and its effect, the paper expounds and proves that the cut - off wall can be safely constructed and devoted into normal usage after dealing with collapse. the psper improves the construction technique and method of concrete cut - off wall especially under complex geological condition and in the overseep stratum

    本文通過對歷次塌坑的原因分析及歷次塌坑的提出和對歷次塌坑效果的分析,論證了塌坑後防滲墻能安全工和投入正常運用;完善了在復雜地質條件及強滲漏地層混凝土防滲墻的工工藝和工方法;提出了對病險庫加固及在地質條件復雜地層中修建混凝土防滲墻的工要點;同時提出了在強滲漏地層修建防滲墻的關鍵是在防滲墻工前通過預注漿封閉強滲漏通道的重要論點;對塌坑一些中的不足之亦進行了分析研究,供國內類似工程借鑒。
  13. In this paper is introduced the problems appeared in the course of debugging and operation of two - stage ro pure water system in a pharmaceutical plant in jiangsu province, and related measures taken

    本文介紹了江蘇某制藥廠兩級反滲透純系統在調試和其後的運行過程中出現的問題以及
  14. According to the original work on the stability problem of the left side of the river and the elementary analysis on the model of geological mechanism, two section planes of rock group t33 and j have been chosen to carry out the stability evaluation ( the slope stability analysis utilized the sarma program ), both of which have the different rock characters. when loads are calculated, the internal force, underground water, earthquake force, their combination and measure to deal with anchorage force infliction are also considered

    根據左岸邊坡穩定問題的前期工作和地質力學模式的初步分析,並結合工程地質條件調查,選取巖性構成不同的t33巖組和j巖組的兩個剖面分別進行穩定性評價(邊坡穩定性分析採用sarma程序進行) ,計算載荷考慮了自重、地下、地震力及其組合以及加錨固力的
  15. Through the analysis of the status of huangbizhuang reservoir and other problems, such as its destruction caused by water seeping, and with the reference to the internal successful application, the project adopted the measure of constructing concrete cut - off wall on body and foundation of the auxiliary dam between stake no. 0 + 840 and stake no. 5 + 740

    通過分析黃壁莊庫現狀及存在的滲透破壞等問題,類比國內成功的工程實例,本工程副壩在樁號0 + 840至5 + 700採用在壩體和壩基建混凝土防滲墻
  16. According to these calculation results, proper measures are chosen to secure the proper operation of sluice

    根據計算結果,選擇較為合的地基,以保證閘的安全運用。
  17. Based on the characteristics of the foundation for the powerhouse of chaozhou water supply control project, the supporting measures, excavation method and control measures for the foundation excavation is put forward herein, and then the method to solve the problems such as monitoring on the supporting, de - pressurization of the ground water, treatment of the seepage from the outside and the protection of the structures inside of the foundation pit etc. are presented as well

    摘要根據潮州供樞紐工程廠房地基的特點,提出了比較合適的基坑支撐和開挖方法及控制,並結合工程實踐對軟深基坑開挖工中應注意的支撐監測、地下降壓、外內滲及基坑內結構物保護等問題提出了解決方法。
  18. At the same time, a number of software and hardware projects have formed their own systems, so it cannot realize data - sharing of the whole locomotive depot and has brought about much waste of manpower and material resources and man - made fault, the railway department fuel reports are filled in, calculated and submitted by manual work, the management is inefficient

    隨著我國鐵路體制的改革即信息化建設的實,機務段也在不斷提高自身的管平和競爭能力,運用信息系統改進機車加油及燃料信息管平,並通過各種途徑研製了眾多信息化。但是這眾多的軟硬體系統自成體系,無法實現整個機務段的數據共享,而鐵油報表的填寫、計算、報送依然沿用人工作業,管效率低下。
  19. Under the condition of applied technology based on internet combined with intellective computational ways and traditional marine condition monitoring, we can construct a new failure diagnosis system ( to develop a distance condition monitoring and failure diagnosis system for main mechanic equipments ) in dredger. it can offer timely credible technical guidance and steps to dredging technician. it is satisfied with the need of dredging security, equipments " condition monitoring and failure diagnosis, maintenance decision of the shipping and its base

    將基於internet的應用技術、智能計算方法與傳統的船舶狀態監測與故障診斷技術相結合,在具有首沖功能的300方自航耙吸挖泥船上構造一種全新的故障診斷系統,即開發一套基於網路的挖泥船主要機械設備遠程狀態監測和故障診斷系統,為疏浚作業的技術人員提供及時可靠的技術指導和,滿足疏浚作業安全、設備狀態監測和故障診斷、實船和基地管和維修決策的需求,提高設備利用率和管平。
  20. There are large words in slope design and slope deformation analysis with monitoring involved, on basis of geology of slopes at nos. 1 and 2 diversion tunnel inlets and actual project conditions of zipingpu project. interior and exterior factors and conditions causing deformation are obtained from analysis. special measures to control deformation are taken to ensure long - term stability, such as consolidation

    本文以分析紫坪鋪利樞紐1 ~ # 、 2 ~ #導流隧洞進口邊坡為主,根據導流隧洞進口的地質及具體的工程環境及條件,對工程中的高邊坡設計所遇到的一些問題進行了分析和闡述;並採用了一定的監測手段,對工過程中邊坡產生的變形,進行了觀測分析,通過綜合分析,找出邊坡變形的內在因素和外部條件,有針對性的採取工程
分享友人