水路循環 的英文怎麼說

中文拼音 [shuǐxúnhuán]
水路循環 英文
water circuit
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : 循動詞(遵守; 依照; 沿襲) follow; abide by
  • : Ⅰ名詞1 (環子) ring; hoop 2 (環節) link 3 (姓氏) a surname Ⅱ動詞(圍繞) surround; encircle;...
  • 水路 : waterway; water route; aquage; [現英方] gote
  • 循環 : circulate; circle; round; repeat; loop; period; recurrence; cycling; circulating; mixing; circula...
  1. After the surplus size of the thick liquid trough is retrieved or put, can put the branch water properly, heat, wash the pipeline which sends the thick liquid material with pump circulation again, so as not to stop up

    漿槽的剩餘漿液回收或放掉后,可適當放入清、用蒸汽加溫,再用泵清洗輸送漿料的管,以免堵塞。
  2. Practice of closed circulation and washing water equipoise in zhangcun coal preparation plant

    漳村選煤廠洗平衡與閉實踐
  3. Through the study of three factors of a, s, c in lunan area, we have found that, under the modem natural conditions, the actual height of stone pillars is still increasing at the rate of 15. 77mm / ka, and their visible height 639. 6mm / ka, moreover, soil layer which is one of the most important driving forces for the heightening of stone forest is quickly becoming thiner and thiner at the speed of 623. 83mm / ka

    同時,研究也表明,土壤co :的最大濃度主要出現在土下60一120cm ,土壤的含量在土下60一80cm處也較大,由此決定了土下最大溶蝕強度主要分佈在土下150cm內,包氣帶強溶蝕帶的下限約在土下iom處。因此,在厚達數百米的南群的覆蓋之下,是不可能發育石林的。
  4. Balance of washing water and closed water circuit in practice at bailong coal preparation plant

    白龍選煤廠洗平衡與閉實踐
  5. Reform and result of washing water closed - cycle in coal preparation

    選煤廠洗改造及效果
  6. Grade for closed water circuit of coal preparation plant

    選煤廠洗等級
  7. Technical reformation of closed water circuit in practice

    煤泥技術改造的實踐
  8. A combined method was proposed i. e., to separate circulating water from washing ash - water and form closed circulating, make acid dipping of condenser copper pipe, add scale and corrosion inhibitor, and perform sterilization and filtration

    針對此問題,提出了隔斷與沖灰的直接聯系,將系統改為閉,對凝汽器銅管進行酸洗,向中添加緩蝕阻垢劑、殺菌滅藻劑和增設旁流過濾系統等辦法。
  9. Today, many fish farms can be found in the area and also many migratory birds that spend their winter here during their journey can be spotted. thus it becomes the transit stop for migratory birds in asia and australia. moreover, the water system developed to maintain water circulation of the salt pans and fish farms in the area has enhanced the growth of mangrove plants, such as sandy mangroves limnitzera racemosa willd.,

    道光3年( 1823年) ,由於曾文溪改道,導致臺江內海淤積,形成了四草內海,后來逐漸變成沼澤,再被開發為鹽場與魚瘟,池裡底棲生物豐富,吸引許多鳥類來此覓食、棲息,加上為維持鹽田及魚瘟的水路循環而開辟的道系統,道旁遍生欖李、海茄? 、五梨跤等紅樹林植物,自然生態豐富。
  10. Practice of closed water circuit at small coal preparation plant

    小型選煤廠洗的實踐
  11. Closed water circuit operation in practice at wangfengang washery

    望峰崗選煤廠洗的實踐
  12. Closed water circuit in practice at zhangzhuang coal mine washery

    張莊礦選煤廠洗的實踐
  13. Practice on the closed - circuitry of slime - water at shaqu coal preparation plant

    沙曲礦選煤廠洗的實踐
  14. Realization of slime water closed - circuitry by replenishment of process flowsheet

    完善工藝流程實現洗
  15. After technical renovation the systems for gasification sewage and heat power ash effluent achieve closed - circuit circulation, so as to accomplish zero discharge of the gasification and heat power sewage

    摘要經技改后,造氣污、熱電灰系統實現了閉,使造氣、熱電污達到零排放。
  16. The practice of wash water balance and closed water circuit of zhenchendi washery

    鎮城底礦選煤廠洗平衡及閉的實踐
  17. Discussion on washing water balance and closed water circuit in coal preparation plant

    試論選煤廠洗平衡與洗
  18. Abstract : measures for waste water management from re co very processing of zhushanxia uranium deposit of wengyuan mine is analyzed in th is paper, which include improving process flow, recycling process water used in ur anium mill as much as possible and choosing asuitable disposing system. all these can decrease the amount of waste water, and also reduce costs of disposing waste water and harm to environment

    文摘:翁源鈾礦竹山下礦井采冶工程恢復生產過程中,通過改進生產工藝流程、實行工藝及選擇合適的廢處理方法等綜合措施加強廢管理,減少了廢產生量和排放量,降低了廢處理成本,改善了境質量。
  19. The direct - inserted solar energy water heater can be used independently for household life, and connected in series or in parallel into a collective hot water supply system for unit such as factory, mine, school, armed forces, guest house, hotel etc. where volume of hot water is needed not so much. both the full glass vacuum heat collection tube which takes natural convection of heat exchange and the heat pipe with superconducting medium have passed the ice and snow test in cold area, and have been recognized by customers in various kinds of climate conditions

    這種系統包括熱管真空管全玻璃真空管,熱保溫箱,系統,泵和控制器系統,其工作原理:建立於定點溫度的基礎上,介於集熱器和熱保溫箱間的泵系統強制,集熱管吸收的太陽能不斷的轉化為熱能,使箱里的不斷加熱。
  20. Analysis and discussion on the closed - circuitry of slime water at a coal preparation plant

    選煤廠煤泥的分析和探討
分享友人