水輪機原理與 的英文怎麼說

中文拼音 [shuǐlúnyuán]
水輪機原理與 英文
principles of water-turbine engine & design of water engine
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (輪子) wheel 2 (像輪子的東西) wheel like object; ring; disc 3 (輪船) steamer; steamboa...
  • : machineengine
  • : Ⅰ形容詞1 (最初的; 原來的) primary; original; former 2 (沒有加工的) unprocessed; raw Ⅱ動詞(原...
  • : Ⅰ名詞1 (物質組織的條紋) texture; grain (in wood skin etc ) 2 (道理;事理) reason; logic; tru...
  • 輪機 : turbine
  1. By applying the method of reliability technique, according to the eletric equipments reliability evaluate rules, this paper systematically analyzes faults which possibility or usually appear in turbine, generator, speed - adjusting controller in water power station and their reasons and effect factors. meanwhile it also uses the method of fat to study the fmea and preventive fault measures of turbine of zz500 - lh - 1020 and find out the biggest risk from all parts risk in turbine of zz500 - lh - 1020. this paper analyses the technique of reliability management of main equipments

    本論文運用可靠性技術中的有關方法,依據《發電設備可靠性評價規程》對組的可靠性狀態進行分類,系統地分析了、發電、調速器等三大械主設備中可能或經常出現的故障,產生這些故障的因及其影響因素;同時,使用故障樹分析方法,研究了zz500 - lh - 1020軸流轉漿式的故障模式及其影響,同時也分析了預防處這些故障的措施;通過危害度分析,找出了zz500 - lh - 1020軸流轉漿式轉中各個部件的危害性大小危害性最大的部件。
  2. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算科學管;大壩混凝土澆築方案及主要施工械選型;混凝土的材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構支護研究;特大型發電組的科學研究。
  3. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算科學管;大壩混凝土澆築方案及主要施工械選型;混凝土的材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構支護研究;特大型發電組的科學研究。
  4. Aiming at mulongtan hydropower station, this paper introduces the meaning of and protection about the temperature of hydro - generating units, the system composition, the configuration and work elements of sensors anti instrument, the means of realization with plc for temperature protection, and puts forward several measure of enhancing the temperature control system

    摘要發電組溫度的監測是組安全運行的重要保證,是電站計算監控系統監測的重要參數,介紹了木龍灘電站發電組溫度測量和溫度保護系統的一般組成模式,測溫傳感器、儀表的配置工作,及採用plc實現溫度保護的方法,並提出了提高溫控系統可靠性幾點措施。
分享友人