  1. Relating closely to the main problem of the high sidewall and wide span underground cavities excavation stability of xiluodu hydroelectric project, the evolution characters of geo - stress field in deep - cutting gorge and the whole features of the stress field, strain field and plastic failure zone around the underground chambers after excavation are studied systematically in the dissertation, based on a great deal of data gathered in field investigation and taking the flac3d v2. 0 software as basic computation tools. meanwhile, in the course of research, the new methods of dynamic numerical simulation are summarized and applied. furthermore, the effects of rock mass qualities, initial geo - stress field and excavation procedure on surrounding rock mass stability are discussed

    本文緊密結合溪洛渡工程大跨度、高邊墻復雜地下房洞室群,施工開挖過程中和開挖后圍巖穩定性研究這一重大課題,在詳盡的野外地質調查工作和對大量基礎地質資料的整理與分析基礎上,以目前國際工程地質界公認的最新通用軟體flac ~ ( 3d ) 2 . 0版作為基本計算工具,從整個壩區地應力場的研究開始,通過動態數值模擬分析這一新的模擬思路,系統地研究了深切峽谷區地應力場多階段的特徵和演變規律,進而對左、右岸地下房洞室群開挖全過程中圍巖應力場、變形場和塑性破區的變化特徵,進行了全過程動態數值模擬研究,並詳細討論了圍巖質量、初始地應力場、施工開挖順序對大型地下洞室群圍巖穩定性的影響。
  2. On the fact of turbine burn down failures and forced to be operated in limited load caused by high generator temperature rising, this paper analyzed the cause from electric magnetic design and ventilation type, provided improvement method and make it be implemented on no. 1 and no. 2 unit and got remarkable effect

    針對瀏陽市株樹橋機溫升過高,以至多次發生發機燒事故,被迫限負荷運行的實際狀況,從磁設計和通風方式上分析了發機溫升高的原因,提出了改造措施並加以實施,成功地1號和2號機進行技術改造,取得了顯著的效果。
  3. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽房7 # - 14 #壩段溫控並縫措施研究:為房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  4. The rock anchor beam is the most difficult and demanded in excavating underground factory, its quality will affect its safety of performing later, as a result, a better quality and smaller crushedregion is demanded

    站地下房開挖中,巖錨梁開挖難度大、質量要求高,該部位成型質量的好將直接影響今後房內吊車的運行安全。巖錨梁開挖要求其具有良好的開挖輪廓面和較小的破范圍。
  5. And that, the variable regulations of stress field, strain field and plastic failure zones in the surrounding rock mass of the underground cavities are summarized for the right and the left bank of underground chambers

    全面總結了溪洛渡站左、右岸地下房洞室群圍巖應力,變形和破區的分佈特徵和變化規律,為洞室群穩定性評價和工程施工設計提供了基礎資料和理論依據。
  6. Analysis of the destruction of the francis turbine draft tube inner side of dongjiang power plant

    東江輪機尾管里襯破原因初探
  7. Hydroturbine governor is one of the important controlling devices in the hydro power plant, and its performance exerts important influence on the quality of electric energy and the operational reliablity of the hydro power plant. lt is an active subject to research some technology and selection for hydroturbine governor

    輪機調速器是的重要控制設備,其性能的好直接影響著能品質和的安全經濟運行,對輪機調速器的若干技術及選型進行研究,具有十分重要的現實意義。