水電成形 的英文怎麼說

中文拼音 [shuǐdiànchéngxíng]
水電成形 英文
hydroelectric forming
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (完成; 成功) accomplish; succeed 2 (成為; 變為) become; turn into 3 (成全) help comp...
  • 水電 : hydroelectricity; hydropower; water and electricity
  1. According to the multi - areas development strategy, the corporation has expanded its business to engineering and construction of all kinds of civil works, municipal and public works, marine works, dredging and reclamation works as well as manufacture and installation of hydraulic steelworks and electro - mechanical equipment, with the major annual capacity of 150 million m3 in earth and rock works, 15 million m3 in concrete production and placement, 10, 000 mw in installation of generating units, and 150, 000 tons in manufacture and erection of hydraulic steelworks

    根據多元化發展戰略,集團公司的業務范圍除工程總承包外,還將業務擴展到各類土木工程、市政工程、海事工程的設計、施工、機械設備和金屬結構製造安裝等,核心競爭力進一步得到擴展和增強,了年完土石方開挖15000萬立方米、混凝土澆注1500萬立方米、發機組安裝1000萬千瓦、鋼結構製作安裝15萬噸的綜合施工能力。
  2. Shp technology needs to be unpacked into different economic levels and conditions of a particular area, which can help those areas to select appropriate technologies

    以上新技術的逐步推廣了一種參數先進價格合理運行可靠維護方便的新的小行業技術。
  3. Fuyuan comapny had started to specialized develop, study and produce the technology of polyurethane productions since 1990. at present, it owns about 30 million of fixed assets, we built nearly 10000 square meters workshop of international standard in weihai hi - tech develop zoon, and there were fully equipped water, power, steam and communication apparatus. we had 4 sets high - power pu foaming machines from italy, and a lot of advanced and perfect devices for chemical examination, and now we have the ability of production for 5 million polyurethane flat - free tyres pu tyres and 1000, 000 pieces polyurethane spare parts for automobile

    本公司自1990年開始專業從事聚氨酯產品的技術開發研究與生產。目前擁有固定資產三千余萬元,在國家級的威海高技術產業開發區建設近萬平方米的國際標準廠房,汽通訊等設施全。裝備有義大利進口的聚氨酯高壓發泡設備4臺套,並且具備先進完備的化驗檢測試驗裝置,現已年產各種規格的聚氨酯無充氣輪胎五百萬條和聚氨酯汽車內外裝飾件十萬件的生產能力。
  4. The excavation on the left side of xiangjiaba hydropower plant would form the large - scale artificial slope, which refers to the main project near the source of the river and the project of intake sea - route near the mouth of the river, and its height would reach 150 meters

    向家壩站左岸開挖將規模較大的人工高邊坡,涉及上游段的主體工程和下游段的引航道工程,工程邊坡的高度達150m 。
  5. Recent years, with the full - blown development of the prestressed concrete technique, the prestressed technique with ring - like strands as the professional technique adapted to the penstock, has been applied to many civil engineering fields such as tunnels and surge shafts in civil engineering hydraulics and power engineering, containment shells of nuclear power station, industrial storage bunkers, digesters and conservation pools in municipal engineering

    近年來,隨著預應力混凝土技術的熟化發展,環預應力作為適應壓力管道結構式的專業技術,廣泛應用於工程隧洞和調壓井、核站安全殼、工業儲料倉、市政工程消化池和蓄池等諸多領域。目前,預應力混凝土壓力管道已得到了越來越多的重視和研究。
  6. The gpss have one output and two inputs which are speed error and its derivative. selecting triangular function as fuzzy variable ' s membership function, mamdani max - min synthetic method as fuzzy inference method and centroid method as denazification method, fuzzy control rules are given according to the control expectation of governor and the experience of operating staff

    這種模糊gpss採用二輸入單輸出結構,以機組轉速誤差及其導數為輸入量,以三角函數作為模糊量的隸屬函數,根據機組穩定控制要求和操作人員的經驗制定控制規則,以mamdani的max - min合法和重心法分別作為模糊推理方法和清晰化方法。
  7. In the course of western development, it must have a lot of fund to exploit water and electricity, oil coalfield, colour metal, to build basic establishment. but the fund is very short, because the western area is located in a bad geographical place, and it is bchindhandly developed in history. so the western area is in the financial state of bottle - neck

    在西部大開發過程中,、油氣、煤炭、有色金屬等資源的開發以及基礎設施的建設,需要大量的建設資金,但由於西部地區所處的地理位置以及歷史發展等多方面的原因,所需資金嚴重不足,了金融的「瓶頸」制約狀況;為了有效地解決資金的供需矛盾,本文提出採用項目融資的方式解決這一問題。
  8. The correlated degree of the density of deformed and failured masses and correlative dynamic force factors in tiger - leaping gorge reach are analyzed by effect measure analysis method which combines qualitative and quantitative analysis, and the key dynamic factors of bank - slope stability are established, which can provided the scientific information for origin division, evaluation, prevention of geological hazards and project planning

    本文採用定性與定量相結合的效果測度分析方法,對虎跳峽河段岸坡變破壞密度與相關動力因子進行關聯度量化分析,從而確定了影響岸坡穩定的關鍵性動力因子,可為開發中的岸坡災害因類型劃分、危險性評價、災害治理和工程規劃設計等提供科學依據。
  9. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河口站工程實際資料,對m方案和n方案溫度場進行了施工期和運行期全過程模擬計算分析,給出了拱冠梁剖面和壩體中心縱剖面準穩定溫度場等值線圖以及施工期、運行期拱冠梁剖面和壩體中心縱剖面非穩定溫度場等值線圖,提供了施工期逐月和運行期每年最高、最低溫度等果,分析了壩體溫度分佈規律以及高溫區的原因,並探討了預埋冷卻管的效果和可行性以及預埋冷卻管的區域。
  10. Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope

    本文在闡明錦屏一級站壩區巖體的和演化特徵的基礎上,詳細研究了拱肩槽高邊坡巖體的結構特徵及岸坡巖體淺表生改造特徵,建立了岸坡巖體淺表生改造與岸坡演化模式,分析研究了巖體的物理力學性質,採用修正的csmr法對拱肩槽高邊坡的巖體質量進行分級研究,在此上基礎之上,採用地質分析判斷和有限元分析等方法,對高邊坡整體穩定性進行了系統分析、計算與評價;應用塊體理論對高邊坡的局部穩定性進行了分析計算,確定局部不穩定塊體的規模、出露范圍,從而對拱肩槽高邊坡的局部穩定性有了系統全面的認識和了解。
  11. In this paper, the deposition evolution process in qtx reservoir are studied, the incoming water and sediment, the operation data, and the time and space distribution of longitudinal and lateral sedimentation in reservoir are analyzed in detail, and the longitudinal scouring and sedimentation and lateral deformation law in reservoir tidal flat and mainstream under different operation way are summarized in every operation period

    本文以黃河青銅峽樞紐工程庫淤積演變過程為研究對象,對青銅峽庫來來沙組庫運行資料、庫縱橫向泥沙淤積時空分佈等進行了較詳細的分析,總結了青銅峽庫各個運行時期不同運行方式下庫灘槽縱向沖淤和橫向變規律。
  12. Boring, grouting and finally forming an impervious curtain in the rock mass with cracks, that is one of the most popular methods of the foundation seepage control at hydraulic and hydroelectric engineering

    採用鉆孔泥灌漿封堵巖體中的縫隙而帷幕,達到減少滲漏量和降低滲透壓力的目的,是工程基礎處理的重要手段之一。
  13. Though the land of the prefecture of liangshan only accounts for 6 of the all the country, water energy resource theoretical gross of the prefecture reaches about 10. 5 % of the theoretical storage of all the country and 13. 1 % of the developable hydropower potential of all the country. it is supposed that we exploited the all developable hydropower potential of the prefecture of liangshan, annual energy output should be over 297 billion kw. h, then the annual average power consumption should be 230 kw. h to every chinese, and according to the shadow electric price of ertan hydroelectric plant, three gorges hydropower station and other hydropower station, the annual energy output will bring 74, 000, 000, 000 yuan industries production value for the prefecture of liangshan annually

    據樂觀預測,到2020年,全州用負荷也僅在250 300萬千瓦之間,除開大型、巨型、超巨型站所開發的力由國家統一購銷外,屆時中小站所開發的力將800萬千瓦的供應能力,除在州內銷納300萬負荷外,至少還500萬千瓦的力需要異地銷納,因此,將涼山中小型資源優勢轉化為經濟優勢,把資本轉化為經濟資本,推動涼山中小產業健康持續發展的關鍵在於不斷開拓營銷市場。
  14. Huidong tales advantage of its climate and topographical benefits to develop specialty products and industries and has established such eco - friendly specialty agriculture as commercial bamboo plantation, poultry and livestock farming and mini waterpower plants in the mountainous region, such suburban specialty agriculture as fruit and vegetable growing and processing, freshwater apuaculture and poultry farming in the waterfront region, and such export - oriented specialty agriculture as potato and balsam pear growing, marine aquaculture and marine fishing in the coastal region

    惠東縣堅持因地制宜、分類指導、培育發展特色優勢產品和產業,使山區以種植經濟型竹類、家畜養殖和小等生態資源特色農業;沿江以優質果和蔬菜種植與深加工、淡養殖和禽類飼養為主的城郊型特色農業;沿海以出口馬鈴薯和大項苦瓜、海養殖和海洋捕撈為主出口的創匯型經濟特色農業。
  15. Hydropower development and ecological environment protection form a pair of contradictions between human beings and nature in the process of material transformation

    摘要開發與生態環境保護了人和自然之間在「物質變換」過程中的一對矛盾。
  16. The host computer system ' s functions are as follows : duplex communicate with automatic station data poll gather to each automatic station save and handle the data format and print diagram based on the gathered data download the parameter to automatic station and adjust the clock dial - up to network and long - distance control automatic rainfall station consists of outer garment, meet rain bucket, water input and output electromagnetic valve, measure bucket, storage battery and circuit control

    可以與自動站進行雙向通訊,完對各個自動站數據輪詢採集並進行存儲、處理,並生圖表,根據採集的數據圖表、列印,可以向自動雨量下載參數、時鐘校準以及遠程聯網撥號和控制。自動雨量站包括外罩、接雨桶、進放磁閥、測量桶、蓄池以及控部分等部分組
  17. Depending on how the ground surface is denuded, the feature of the current crustal stress field and rock stress environment can be calculated analyzing the result in this paper : by analyzing the recovering feature of the elastic deformation of the rockmass in unload - stage under various pressures, it has been found there is close relationship between the recovering degree of the elastic deformation of the rockmass and the unloading degree of the pressure the direction of the major principal stress in the crustal stress field is not consistent with the direction of the crushing stress regional tectonics borne during the last tectonic movement. the evolving degree of the regional geomorphology evidently affects the current crustal stress field, which changes from the self - weight stress field to the horizontal stress field, with the changing of the eroding degree of the regional geomorphology ranging from valley area to hilly country to flat country. in valley area, where there is two stress belts, the bankslope s tress belt and the self - weight stress belt within the mountain. the direction of the major principal stress is nearly parallel to the ground surface and inclines towards the valley in the bankslope stress belt. it is nearly vertical in the self - weight stress belt

    通過本文的研究果,根據區域性地貌的演化特徵,我們可以大致地對現今地應力場進行判斷:在分級卸荷條件下,巖體中彈性變的恢復具有明顯的規律性,這種規律對于研究地應力場的演變是有幫助的;地應力場中最大主應力方向與區域構造跡在最近的構造運動中所受區域性擠壓應力的方向無明顯的對應性;區域性地貌態的演化程度對現今地應力場的特徵具明顯的影響,隨著區域性地貌侵蝕程度由峽谷區、丘陵區、平原區的變化,現今地應力場特徵由自重應力場、平應力場為主含少量自重應力場特徵向平應力場的規律變化;在峽谷區,山體中具有兩個應力帶:自重應力帶和卸荷應力帶,最大主應力方向在卸荷應力帶中近平行於坡面並傾向于河谷、在自重應力帶中近於直立;根據原始地面遭剝蝕的程度,可以大致地估算最大主應力和中間主應力的量值和方向;在丘陵區和平原區,最大主應力的方向近於平,並與附近區域性侵蝕盆地和河流的展布方向基本平行,根據原始地面遭剝蝕的程度,可以大致估算其最大主應力的量值;根據區域性地貌態的特徵來分析工程區的現今地應力場特徵,並進而大致了解巖石的應力環境,這種分析方法得出的結論與許多實際的地應力測試果基本一致,對于大型工程地下廠房和壓力隧洞的設計是有所幫助的。
  18. During the construction of the concrete lining for the diversion tunnel of xiaowan hydropower station, the concrete linings for the sides and the crown of the tunnel are simultaneously placed by the integral steel shuttering trolley with the greatly shortened construction progress

    摘要小灣站工程在導流洞混凝土襯砌施工中,邊頂拱混凝土採用整體式鋼模臺車一次襯砌,大幅提高了施工進度。
  19. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽站右岸旋流內消能泄洪洞是國內第一個泄量達1000m s 、頭超過100m ,即將修建的旋流式內消能泄洪洞,其方案的論證與試驗研究以及建后投入使用,將在國內外旋流式內消能泄洪洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能式在工程中的應用,從而為解決高壩建設中泄建築物的高速流問題與導流洞改建的技術與經濟問題提供工程實例,對推動與發展力學的研究與發展均具有重要的理論與實踐意義。
  20. Since the founding of the armed police hydropower troops in 1966, tens of large hydropower projects including some national key projects with high technical content and greater construction difficulties are undertaken by the troops ; with which the technical features of the troops are created based on the engineering practice and the continuous advancement of the construction techniques

    摘要武警部隊自1966年組建以來,承擔了數十座技術含量較高、施工難度較大的大型項目和其他國家重點工程,通過工程建設實踐和施工技術不斷提高,了自己的技術特色。
分享友人