水電站 的英文怎麼說

中文拼音 [shuǐdiànzhàn]
水電站 英文
[簡] (水力發電站) hydroelectric (power) station; hydropower station水電站自動化 automation of hydraulic power plant
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 水電 : hydroelectricity; hydropower; water and electricity
  1. Stability analysis on adjoining rock of large - scale underground chamber group of suofengying hydropower station

    索風營水電站大型地下洞室群圍巖穩定分析
  2. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦屏二級水電站(一期)深埋長隧洞的設計和施工中面臨的一些問題,選取隧洞的一個典型斷面進行滲流、滲控分析和開挖及支護的有限元數值模擬,從而就深埋隧洞不同的開挖及支護方式對地下滲流場及圍巖穩定性的影響和所應採取的支護措施等方面進行了探索、研究。
  3. Considering amendatory forecast runoff value will affect the operation strategy, a step - by - step decision method is proposed, which is useful for manager ' s making an optimized decision. the mid - long runoff forecast system of longxiriver is developed with the c + + language

    ( 5 )考慮徑流預測值修正後對水電站運行策略的影響,提出了水電站優化調度的滾動決策方法,為水電站及其庫最優運行策略的採用提供依據。
  4. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  5. Brings forward the basic network cell model of symmetrical blast vault and asymmetric blast vault. then studies and analyses airflow in vault of main voltage switchyard hall of xiluodu hydropower station which is far cry and large numbers of airflow conflux, brings forward concept of “ virtual embranchment ” and corresponding basic network cell model, regresses calculate expressions of flux uniformity coefficient and impedance of “ virtual embranchment ” of vault of main voltage switchyard hall of xiluodu hydropower station

    而後又採用cfd數值模擬的方法對溪洛渡水電站主變洞排風拱頂這種多股氣流匯流的長距離通道內的氣流流動進行了分析,提出了「虛擬分支」的概念和相應的網路基元模型,並回歸得到了溪洛渡水電站主變洞排風拱頂各個排風「虛擬分支」風量均勻系數以及阻抗的計算公式。
  6. Experimental research on asphalt concrete impervious core wall for yele hydropower station

    冶勒水電站瀝青混凝土心墻防滲性能的試驗研究
  7. Along with the a enhancing proportion of hydroelectricity in the whole electricity system in our country, the increase of the single unit capacity, the faults ratio of the large - scale hydropower units is more and more important to the whole system safe operation, if we do n ' t manage it well, it will cause the collapse of the whole system and bring a great loss of country ' s economy, hi addition, accompany with " to dispart plant and grid, connect to the grid according to the price " put into practice, how to control the production cost of the power plant has to be put into consideration

    隨著我國在系統中所佔比重的增加及單機容量的增大,大型水電站和機組的故障率對系統的安全運行也越來越重要,如果處理不好,甚至會引起整個系統的崩潰,給國家帶來巨大的損失。另外,隨著我國「廠網分開,競價上網」的逐步實施,如何控制發廠的生產成本,也將提上各個廠的議事日程。
  8. Namely : high wear - resisting rubber, screen mesh of polyurethane ( pu ), become the domestic biggest producer specializing in high wear - resisting screen mesh, the practical experience for many years, craft is it develop high - quality to apply, durable new product have all over foot industrial demand modernized polyurethane, becoming can produce the production bases of different high wear - resisting screen mesh at home, whom products can select rubber or polyurethane screen mesh for use at home separately coloured, ferrous metal mine enterprise, power station and building materials sift subsystem use, well received by ore dressing circle from home, this mean square garden screen mesh of our company credit can trust among user

    即:高耐磨橡膠、聚氨酯( pu )篩網,成為國內專業生產高耐磨篩網的最大廠家,有著多年的實踐經驗,將現代化的聚氨酯工藝應用於開發優質、耐用的新產品來滿足工業需求,成為國內能生產各種高耐磨篩網的生產基地,產品可以分別選用橡膠或聚氨酯篩網在國內的有色、黑色金屬礦山企業、水電站及建材篩分系統使用,受到國內選礦界的好評,這就意味著我公司的方園牌篩網在用戶中信用完全可以信賴。
  9. This software can not only measure the real time data of hydroelectric plant, but also carry out the auto generate electricity on the hydroelectric plan t and ordinal startup - stop of the dynamotor. the software also carrys out the functions of alarm disposal, report forms, print and load curve

    該軟體不僅實現了對水電站內各種模擬參數和數字信號的實時監測功能,還實現了對水電站的自動發、機組順序啟停的控制,以及報警處理、報表列印、負荷曲線等功能。
  10. Research on the assessment system for water economization and power generating improvement of gongboxia power station

    公伯峽水電站增發考核方法研究
  11. Based on the demand of power department, a full distributed multifuncitional monitoring device is studied. this instrument not only can measure the data of hydroelectric plant, but also integrate the funcition of control the dynamotor, by cooperate with the program of epigynous system, it can realization the auto generate electricity on the hydroelectric plant and ordinal startup - stop of the dynamotor. 2 furthermore, performance of integrated dft arithmetic enhances the acturacy and reliability of measure. by communication several devices can run online to be controlled dispersedly and managed centrally

    本文分析了國內外水電站自動控制裝置的研究和發展狀況,尤其是國內小型水電站的自動化現狀,針對現有力部門的需求,設計並實現了一種單元式的微機自動監控裝置,該裝置不僅實現了對水電站內各種模擬參數和數字信號的實時監測功能,還對輪發機組進行了調控,通過與上位機處理程序的配合,可以實現水電站的自動發控制、機組順序啟停;在測量發機組機端壓和流參數的時候,採用32點離散傅立葉演算法( dft ) ,增加了測量的準確性和可靠性;通過通訊可以實現裝置的聯網運行,做到「分散控制、集中管理」 。
  12. At the end of the dissertation, example calculation is given under multi - loading cases using the agc software of hydropower station based on dcpm - fga

    最後,運用所設計的水電站廠內agc控制軟體對某進行了多個功率點多工況條件下的實例計算。
  13. Comparing with the method of equal differential increment rate, dcpm - fga has better optimization quality. the agc software of hydropower station based on dcpm - fga can reduce water consume, and enhance the economic performance of hydropower stations

    實例計算結果表明,與等微增率方法相比,基於dcpm - fga的水電站agc具有更好的優化品質,能有效降低量損耗,提高的經濟效益。
  14. The spatial condition and both the technical and economic feasibilities for the layout of the light - court for the auxiliary powerhouse under the condition of higher fluctuation of the flood level downstream is basically analyzed ; in which the principles of the layout and both the spatial dimension and configuration are discussed, and then a actual design case is given with the preliminary evaluation on the ventilating and lighting effect of the light - court

    初步分析了下游洪位變幅較大等環境條件下,貫流式水電站副廠房設置自然通風採光天井的空間條件及其技術性和經濟性,討論了天井布置原則和空間尺度與形態處理,給出設計實例並初步評價了天井通風採光的效果。
  15. Take the example of ghazi - barotha hydropower project in pakistan, the article illustrate the basic principle and application of project risk management

    文章結合巴基斯坦巴羅塔水電站工程的實例,闡述了項目風險管理的基本原理和具體應用。
  16. Design standards of hydropower headrace and forebay

    水電站渠道及前池設計規范
  17. Design specifications for hydropower headrace and forebay

    水電站渠道及前池設計規范
  18. Baise hydraulic power plant lies in the head of yujiang river, which is 22km away from baise city

    百色水電站位於鬱江上游,在百色上游22km處。
  19. In this paper, 3d nonlinear finite element model is used to analyze the stability of side slope of baise hydraulic power plant ' s tail channel, and the result to be given for consulting

    本文主要應用三維非線性有限元對百色水電站渠高邊坡進行靜、動力穩定性分析,並對結果進行分析,給出供工程設計的參考意見。
  20. I used to work at the hydroelectric station in roznow -

    我以前在羅茲諾的水電站工作
分享友人