水電總站 的英文怎麼說

中文拼音 [shuǐdiànzǒngzhàn]
水電總站 英文
hydraulic central station
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞(總括; 匯集) assemble; gather; put together; sum up Ⅱ形容詞1 (全部的; 全面的) general; o...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 水電 : hydroelectricity; hydropower; water and electricity
  1. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花在1995年及1996年導流渡汛工程措施設計及工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  2. In this paper, the study of construction technology of concrete facing rock - fill dam in frigid zone has been done in accordance with construction and practice of lianhua hydropower station ( concrete face rock - fill dam ) in mudanjiang, heilongjiang province

    本文針對嚴寒地區砼面板堆石壩施工技術研究方面的不足,結合我國黑龍江省牡丹江上的蓮花,面板堆石壩的施工實踐,通過施工的原型實驗,對砼面板堆石壩在嚴寒條件下的施工技術進行了研究和結。
  3. According to the actuality of the studied water power station, the thesis combine the advanced fieldbus technique, ethernet and the traditional hydraulic technique together, and use them to design the supervise controlling system of the water power station. base on the gate - controlling request of the water power station, designed the gate ' s hydraulic hoist system

    文章從結合所研究的的實際需要出發,將先進的現場線技術、以太網技術與傳統的液壓技術相結合,並應用到閘門監控系統的實際設計過程中。論文根據所研究閘門控制的具體技術要求,設計了適合該的液壓啟閉機系統。
  4. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂位於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段上,為低閘引式開發。正常蓄位1268 . 0m ,最大閘高31m ,庫容297 . 4萬m ~ 3 ,引隧洞長19 . 57km ,裝機360mw 。福堂閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,體屬于多層復雜地基。
  5. Abstract : the character of dsp and site bus technique, its application and prospect in automation of hydropower station are discussed in this paper

    文摘:主要討論dsp技術及現場線技術的特點及其在自動化中的應用和發展前景。
  6. Based on the project scale argumentation of letan hydropower station, the paper briefly introduces the main results of scheme ' s technical & economical comparison and the main factors of scheme option in the option and design stage of the normal storage water level and installed capacity, as well as the evaluating opinions given by the specialist group of project proposal evaluating committee ; the main technical characteristics for similar project scale argumentation are summarized up according to the project scale design argumentation of letan hydropower station

    摘要通過樂灘工程規模論證,簡述該工程正常蓄位選擇和裝機容量選擇設計階段方案技術經濟比較的主要成果、取捨方案的主要因素、以及項目建議書評估會專家組的評估意見;並根據樂灘工程規模設計論證結類似工程規模論證時的主要技術要點。
  7. In general speaking, this paper has deeply researched the unit increasing capacity for improving hydraulic power utilization of our country, and this paper is a guide for unit increasing capacity working of gezhouba hydroelectric power plant and other hydroelecrtic plants

    之,本文立足事業的發展,為提高我國力發機組能利用率,對機組增容改造進行了深入的研究,對葛洲壩機組增容改造和其它的機組改造工作具有指導作用。
  8. In consideration of the special features of the power system of lhasa area, the station uses the surplus electricity to draw water and store energy when its load is at the lowest and discharges water to generate electricity at the peak load

    為維護生態環境,按拉薩力系統的特點、利用負荷低谷時的多餘量抽蓄能負荷高峰時放體上不改變羊卓雍湖的量,以力保羊湖位不下降。
  9. And that, the variable regulations of stress field, strain field and plastic failure zones in the surrounding rock mass of the underground cavities are summarized for the right and the left bank of underground chambers

    全面結了溪洛渡左、右岸地下廠房洞室群圍巖應力,變形和破壞區的分佈特徵和變化規律,為洞室群穩定性評價和工程施工設計提供了基礎資料和理論依據。
  10. In this paper, referring to qingju water power station, temperature control analysis and study has been done : study on the match ratio of the concrete and question of modifying of the special fine sand concrete to improve resisting ability of splitting of concrete ; study on the technology of the highly mixed fly ash to reduce the adiabatic temperature rise of concrete ; in case of the condition of resisting splitting to allow, study on the temperature control measure to strengthen and water the size of building, simplify the operational procedure, accelerate the construction speed, economize the expenses of the project

    溫控問題成為青居設計和施工的關鍵技術問題。 、本文對工大體積混凝土溫控問題進行了分析和結,結合青居閘壩工程,開展溫度應力及溫度控制研究:研究混凝土的配合比及特細砂混凝土『改性問題,提高混凝土的抗裂能力;研究高摻粉煤灰技術,降低混凝土的絕熱溫升:在抗裂條件允許的情況下,研究施工過程中溫控措施的簡化,以加大澆築尺寸,簡化施工程序,加快施工進度,節約工程費用。
  11. Two large - scale debris flows burst out in chongdui gully of nyalam county on may 23 and june 29, 2002, causing tremendous disasters to the hydropower station, the china - nepal highway, communication establishment, and farming and stockbreeding, and resulting economic loss of above 7. 5 million yuan

    摘要聶拉木縣沖堆普於2002年5月23日和6月29日先後兩次暴發了大規模泥石流災害,導致下游的、中尼公路、農牧業生產、通訊設施等遭受嚴重破壞,共損失約750餘萬元,給地方社會經濟造成了嚴重的影響。
  12. In order to calculate the high external water pressure, the rock seepage field and external water pressure coefficient should be treated in detail. concentrated on the questions of high external water pressure and flow of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied, the high external water pressure of jinping cascade 2 hydropower station is analyzed and studied in detail

    本文在結前人研究成果的基礎上,圍繞深埋隧洞的突涌和高外壓力問題,系統地研究了深埋隧洞襯砌荷載和外壓力的作用機理及計算方法等理論,並對錦屏二級深埋引隧洞的外壓力問題進行了詳細的分析和研究。
  13. Consequencely, the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, and the back - analysis and the prediction of the parameters of the dam system have been done according to the operating observed data. the research work involves several aspects as follows : 1 ) a back - analysis model including the prior information and a predictive model of nonlinear time series were established ; 2 ) the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, in which the analysis module of the loading effects, the back - analysis module, the forecasting module of the physical parameters and the assessment module of the operating state were contained ; 3 ) according to the operating observed data, the operating state of the dam was assessed and predicted with the analysis system of the operating state, the results suggested that the dam is in basically normal operation at present

    具體工作有以下幾方面: 1 )收集整理漫灣大壩運行監測資料,並對其進行了系統分析,從觀測資料本身直觀的分析了大壩的運行狀況; 2 )結位移反分析的理論及方法,建立了考慮先驗信息多介質位移反分析模型,基於神經網路非線性映射功能,建立了神經網路時間序列預測模型; 3 )以ansys軟體為平臺,開發了漫灣砼重力壩運行狀態評價模塊,結合荷載效應分析、參數反演分析、參數預測分析三個模塊組成漫灣砼重力壩運行狀態分析系統;實現了對漫灣運行狀態的動態「反演-預測」分析; 4 )利用漫灣砼重力壩運行狀態分析系統,在漫灣大壩實測資料分析、大壩砼特性參數反分析、大壩砼彈性模量衰變規律及預測分析的基礎上,系統的分析並預測了大壩運行狀態。
  14. Gaobazhou water conservancy project is the most downstream hydropower station in the 3 cascade development qingjiang mainstream, total installed capacity 252mw, total reservoir capacity 430 million - m3, maximum dam height 57m, length of dam axis 439. 5m, total static investment rmb 623. 48 million ( 1998 price )

    高壩洲利樞紐是清江流域三級的最下游一級裝機容量252mw ,庫容4 . 3億m ~ 3 ,最大壩高57m ,壩軸線長439 . 5m ,靜態投資( 1988年價格) 62348萬元。
  15. The paper reviews the background of optimum design for letan hydropower station, introduces the principal and method of optimum design and summarizes the success experience

    文章回顧了樂灘優化設計背景,闡述了優化設計原則與方法和重要優化設計項目,結了順利實現優化設計的經驗。
  16. Bid invitation on electromechanical equipment for letan hydropower station is an important part of the whole project bid invitation, the whole project has finished 50 bidding items in total, and the total sum of contract reaches rmb 561, 200, 000

    摘要樂灘設備招標是整個工程項目招標的重要部分,共完成了50個招標項目,合同金額達56120萬多元。
  17. Letan hydropower station, with a total installed capacity of 600 mw and a total investment of 4. 024 billion yuan, is one of the important electric supply project in guangxi in the period of the tenth five - year plan in china

    摘要樂灘工程是國家「十五」期間在廣西投產的重要源建設項目之一,工程投資40 . 24億元,裝機容量600mw 。
  18. In this paper, brief summary and contrast for the analytical methods of arch dam were conducted, the visualization and parameterization of fem, and its implementation were investigated, and the system based on ansys, for the simulation fem analysis of arch dam was developed. and 3 - d nonlinear fem simulation analysis was then carried out for niutoushan arch dam, which is located in shouning county, fujian province of china

    本文對拱壩的分析方法做了結對比,研究了有限元分析中的可視化、參數化方法及它們實施技術,開發了基於ansys平臺的拱壩有限元模擬分析系統,並結合實際工程對福建省壽寧縣境內牛頭山雙曲拱壩進行了三維非線性有限元整體穩定模擬分析。
  19. The thesis analyzed the development of the gate ' s hoist and its controlsystem, and the localization of the gate ' s operating machine ' s traditional hydraulic system, according to today ' s control technique, especially the characteristics of the profibus fieldbus, the thesis put forward the project that " the gate supervise controlling system base on the profibus control and ethernet technique ", according to that project, completed plc control procedure and the procedure of the supervise and control ( supervise and control software and man - machine interface ), at last the thesis set up a ethernet network for the monitor and the plc correspondence of a place of honor machine and plc and a fieldbus network for the far i / o mold and the plc, made the gate supervise and control by network

    文章對閘門啟閉機及其控制系統的發展狀況和傳統液壓啟閉機控制系統的局限性進行了詳細分析,並結合當前控制技術,特別是profibus現場線控制技術的特點,針對所研究的的實際情況提出了「基於profibus現場線控制和以太網技術的閘門監控系統」的技術方案。並根據該方案完成了下位機( plc控製程序)的編制和上位機(監控軟體和人機界面的組態)的組態。最後通過組建上位機與plc的通信以太網路和遠程i o模塊與plc之間的線網路,實現了整個閘門監控系統的網路化。
  20. The bingling ( si gou xia ) hydropower station is a series of power stations on the yellow river, in order to the expropriation and the emigration be reduced, after studied the relation of water level and flux of the bingling hydropower station on the taping dam location, under the different running circumstances of the liujiaxia reservoir, to located the bingling hydropower station on the head of the liujiaxia reservoir, and keeping the total installation and the generated energy not be changed all made use of the floodwater of the liujiaxia reservoir

    摘要黃河炳靈(寺溝峽)是黃河幹流上的一個梯級,為了減少征地移民損失,經對炳靈(塔坪壩址)尾斷面在劉家峽庫不同運行方式下的位與流量關系進行分析研究,在裝機和年發量基本不變的情況下,充分利用劉家峽庫汛限位,將樞紐選址在其庫尾內。
分享友人