永久性基礎 的英文怎麼說

中文拼音 [yǒngjiǔxìngchǔ]
永久性基礎 英文
permanent foundation
  • : Ⅰ副詞(永遠; 久遠) perpetually; forever; always Ⅱ名詞(姓氏) a surname
  • : Ⅰ形容詞(時間長) for a long time; long Ⅱ名詞(時間的長短) of a specified duration
  • : Ⅰ名詞1 (性格) nature; character; disposition 2 (性能; 性質) property; quality 3 (性別) sex ...
  • : 名詞(墊在房屋柱子底下的石頭) plinth
  • 永久性 : perpetual; permanency
  • 永久 : permanent; perpetual; everlasting; forever; for good (and all)
  1. In order to avoid the ehv system disaster caused by reclosing on the permanent fault of transmission line, adaptive autoreclosure based on microprocessor - based protection arises at the historic moment, but is still in the stage of theory study

    為了避免超高壓輸電線路採用自動重合閘時重合於故障所造成系統穩定破壞等重大系統災難,在微機保護的上,自適應重合閘應運而生,但尚處于理論探索階段。
  2. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐優化試驗研究;大壩深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  3. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐優化試驗研究;大壩深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  4. The executive committee may, under special circumstances and on non - permanent basis, appoint ad hoc committees as it considers necessary for securing the efficient discharge of its functions, and may delegate to any such committee, ad hoc committee or working party any of its powers and duties, provided that no delegation made hereunder shall preclude the executive committee from exercising, performing or resuming at any time any of the powers and duties so delegated

    為工作效率起見,執行委員會在有需要時,並在特別情況和非之下,得隨時委派委員會,並得將其某種權力與任務指派給委員會、臨時委員會及工作小組。受委派之代表不能阻止執行委員會在任何時間內行使或收回其所委託之權力與任務。
  5. In this paper, studies are profoundly made on the actual detecting problems happened in the topic of " acoustic emission monitoring of the slope stability of the permanent ship lock for the three gorges "

    本文在「長江三峽船閘邊坡穩定聲發射監測」課題上及實際檢測中面臨的問題進行較深入而有針對的研究。
  6. The seismic response is analyzed with total stress method ; and it ' s found that the positions of the most dangerous slide surfaces are fairly stable though the precision for searching is very high. the idea of newmark method is induced to calculate permanent deformation on circular sliding surfaces. the precision is increased and the complexity of searching is lessened

    本文採用總應力法分析了填埋場在地震作用下的動力響應,通過計算發現,在滑弧搜索的精度相當高的情況下,最危險滑弧的位置仍然比較固定;在這一發現的上,引入newmark地震變形的思想,並將其運用於圓形滑動面從而提高了該方法的精度並減少了試算的繁復
  7. In practice, i think we should pay attention to establish perpetual enterprise culture ; simultaneously, we should manage corporation strategically according to its practice situation, base on which we apply the strategic management accounting

    在實際的操作中,我認為在企業中我們要注意培養的企業文化,同時,根據企業的實際情況對企業實行戰略管理,並在此上應用戰略管理會計。
  8. Capital is the prerequisite and foundation of commercial banks. the capital offers a permanent capital source for commercial bank

    銀行資本為商業銀行提供了的資金來源,是商業銀行存在的前提和發展的
  9. It is a historic event in the sino - u. s relationship for usa to establish the station of the permanent normal trade relationship with china, and it establishes the stable basis of the development of the economic and trade relationship between two nations in the new century

    中國入世后,中美經貿關系面臨新的機遇和挑戰。美國確立對華正常貿易關系地位是中美關系中具有歷史意義的事件,為中美經貿關系在新世紀的發展奠定了堅實
  10. Firstly in the paper the research of hydraulic characters and the optimize of structure have being carried out on the four bigger design schemes of permanent internal dissipation discharge tunnel reconstructed from the right bank ' s diversion tunnel of gongboxia power station with a method of theoretical analysis combined with test comparisons. on this basis, two form swirling flow internal dissipation schemes, vertical and horizontal axis are recommended to the construction unit of the station as the schemes to be selected next

    本文採取理論分析與試驗比較相結合的方法,首先對黃河公伯峽水電站右岸導流洞改建為式內消能泄洪洞的四個較大設計方案進行了水力特的試驗研究與體型優化,在此上,向建設單位分別提供了豎井旋流內消能的推薦方案與水平旋流內消能的推薦方案。
  11. On the function study basis of main doublized protection type 11 and type 902 micro computer line protection device, taking permanent single phase fault occuring on power line within protected district as example, the paper analized in detail the acting behavior of type 11 and type 902 computer line protection device

    摘要在對構成線路主保護雙重化的11型和902型微機線路保護裝置功能研究的上,以線路發生區內單相接地故障為例,對11型和902型微機線路保護裝置動作行為作了詳細分析。
分享友人