沉井 的英文怎麼說

中文拼音 [chénjǐng]
沉井 英文
[建築] open caisson; well-sinking; sink沉井法 drop shaft sinking; 沉井基礎 [土] (sunk) well foundation; open caisson foundation; 沉井施工 open caisson construction
  • : Ⅰ動詞1 (沉沒; 墜落) sink 2 (沉下 多指抽象事物) keep down; lower 3 [方言] (停止) rest Ⅱ形容...
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  1. The towers are 170 ft above the caisson.

    沉井以上的塔柱高度為170英尺。
  2. Construction of pylon pier caisson of haikou shiji bridge

    海口世紀大橋主墩沉井施工
  3. 1 sedimentation anyslys of soil under the action of deadweight ; 2 sedimentation anyslys of structure in using ; 3 endogen force anyslys of structure in using ; 4 soil remolding type anyslys ; 5 homogenous flush works anyslys ; 6 anyslys of the structure sedimentation effects of different flushing amount at the same place ; 7 anyslys of the structure sedimentation effects of different flushing places ; 8 anyslys of the structure sedimentation effects of different horizontal flushing places ; 9 anyslys of the structure sedimentation effects of different vertical flushing places ; getting the different between the endogen force of common structure and that of slant structure. the rule of stricture sedimentation and the effect of different soil remolding type were also gained

    對掏土糾偏過程做了以下9個方面的分析: 1 、土體在自重作用下的降分析; 2 、建築物在使用階段的降分析; 3 、建築物在使用階段的內力分析; 4 、土體受擾動類型分析; 5 、均勻沖水施工過程分析; 6 、同一個地方沖水量大小不同對建築物降影響分析; 7 、不同沉井沖水對建築物降影響分析; 8 、進深不同的土層沖水對建築物降影響分析; 9 、不同埋深土體沖水對建築物降影響分析。
  4. The methods for treating the sand drifting in the construction of the sunken shaft

    關于沉井施工中流沙的處理方法
  5. Supersonic deep - well detector for submerged shaft sinking

    淹水沉井超聲波深測探儀
  6. Open - end caisson foundation

    深基礎沉井基礎
  7. The construction techniques of sinking well and explode in water are introduced. auto climbing form panel technique is applied in the construction of main tower

    斜拉橋主橋墩設計為鋼筋混凝土圓端型沉井結構,其中詳細介紹了沉井施工技術,同時介紹了水下松動控制爆破技術。
  8. In this paper, the construction techniques of linjiangmen cable - stayed bridge in jilin, such as large sinking well technique of pier, climbing form panel technique of main tower, stay rope formwork traveler technique of girder and construction control, are summarized in details

    本文全面總結了吉林臨江門斜拉橋施工技術,詳細敘述了主墩大型沉井施工技術,主塔爬模施工技術,主梁牽索式掛籃施工新技術。斜拉索施工及施工控制等。
  9. High pressure rotary jet grouting applied to curtain construction of drop shaft sinking

    高壓旋噴注漿法在沉井帷幕施工中的應用
  10. Through analyzing the structure of open caisson, and according to sinking stress principle, the paper introduced in the open caisson construction process sinking, correcting error, survey control as well as peculiar circumstance processing technical measure, such as in open caisson construction the inner - mold for sanding, framework supporting and steel binding, and concrete casting ; in open caisson sinking - control the sand in edge foot inner - mold, sand - pumping sinking, and pressure hydraulic monitor breaking and pressure - blowing sinking by air pressure blower etc

    摘要根據下受力原理,分析了沉井結構,介紹了沉井施工過程中的下、糾偏、測量控制以及特殊情況處理的技術措施,如沉井製作中的填沙內模,模板支設和鋼筋綁扎,混凝土澆注;沉井控制中的刃腳內模沙土,抽沙泵抽沙下,高壓水槍破壓、空壓機吹壓下等。
  11. During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation

    在三維有限元計算中,對不同工況(沉井充填、錨體澆築、主纜架設、箱梁吊裝、橋面鋪裝以及通車運營)下的施工過程作了模擬,全面揭示了各工況下錨碇沉井基礎與地基土的變形變位規律,著重分析了影響散索鞍水平位移的因素以及不同工況下沉井前測地基土水平向抗力變化規律,並提出了不同深度地基土水平向抗力與水平位移間的擬合關系。
  12. The construction technology for sinking well of pfa layer

    粉煤灰層沉井施工技術
  13. Experience of sunk well construction in the basis of basement

    高層建築地下室基礎沉井施工經驗淺談
  14. Saveral methods to build sinking well

    沉井施工的幾種方法
  15. The technique and application of the cast - in - site bored pile post - grouting construction

    薄壁沉井法在挖孔樁基礎施工中的應用
  16. Construction technique of sand brick sinking pile in deep water

    深水河中磚沉井挖孔樁施工技術
  17. Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985

    自從武漢長江大橋工程中擯棄了過去一直沿用的氣壓箱,首次採用了鋼板樁圍堰管柱基礎以來, 1985年建成的九江長江大橋基礎獨創性地採用雙壁鋼沉井圍堰鉆孔樁基礎,鋼圍堰在橋梁基礎施工中的應用越來越多。
  18. Specification for structural design of reinforced concrete sinking well of water supply and sewerage engineering

    給水排水工程鋼筋混凝土沉井結構設計規程
  19. The plans selection, formation, construction of sunk wells and its correction for deflection during the subsidence of sunk well were introduced. the experience obtained from the engineering can be useful to the construction of basement of high - rise buildings in down town area

    全面介紹了沉井方案的選擇、沉井的製作、施工及沉井過程中的糾偏處理,為鬧市區高層建築物地下室的施工提供了成功經驗。
  20. The construction scheme is briefly introduced herein, and furthermore, the diversion structures, the composite scheme consisting of open caisson group adopted to treat the overburden of the foundation for the stage 2 longitudinal concrete cofferdam and the diversion method of bottom outlet combined with the dam gap used for the stage 2 diversion are described as well

    文中對該方案進行了簡要介紹,並介紹了有關導流建築物,以及二期縱向混凝土圍堰堰基覆蓋層採用了沉井群等綜合處理方案和二期導流採用的底孔加缺口聯合泄流方式。
分享友人