沉管法施工 的英文怎麼說
中文拼音 [chénguǎnfǎshīgōng]
沉管法施工
英文
sinking pipeline method- 沉 : Ⅰ動詞1 (沉沒; 墜落) sink 2 (沉下 多指抽象事物) keep down; lower 3 [方言] (停止) rest Ⅱ形容...
- 管 : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
- 法 : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
- 施 : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 施工 : be in the process of construction; be under construction; build; construction
-
With the development of the technology to build tunnels with sunken tubes in china, more and more subaquatic tumiels are built with sunken tubes and construction of the tubes in dry - docks is one of the important factors for building subaquatic tunnels with sunken tubes
摘要隨著我國沉管法修建隧道技術的發展,越來越多的水下隧道採用沉管法施工,而干塢是沉管隧道修建的重要因素之一。Taking the measure of uncorking on the steel tube and filling water before sand filling, the installation process of sand compaction piles is optimized, the installation parameters and testing rate under the near shore condition are confirmed, and the control and testing methods for the piles ' quality are summarized
採取樁管壁開孔、先灌水后灌砂的方法,優化了水上擠密砂樁的施工工藝;給出了在近岸無掩護、水流急的施工條件下的施工參數和檢驗比率,總結了沉樁定位、高程式控制制、灌砂率等參數的控制措施和檢驗方法。In order to achieve the optimized tunneling approach, first, tunneling procedures, shift length, horizontal jet grouting length, bench length and space length between c and d part of crd method are optimized ; on the basis of these results, two kinds of tunneling schemes are calculated with three - dimensional fem and the optimized tunneling scheme is achieved. as results of the optimized scheme, the conclusion is made that the gas pipe above the tunnel of sk3 + 355 section is secure. the calculation results are verified through comparison of numerical simulation results and site - monitoring measurement data
為得出適合本段工程的最佳施工路線,利用大型有限元通用軟體ansys對開挖順序、開挖進尺、水平旋噴長度、臺階長度及crd工法施工的c 、 d部相錯長度進行了有限元數值模擬和優化分析,並利用這些分析結果,進行了兩個施工方案的三維有限元動態施工模擬,得出了較優的施工方案,並利用施工后的地表沉降槽曲線,對sk3 + 355斷面處隧道上方的煤氣管線的安全性進行了分析,得出了利用此施工方案施工不會造成此處煤氣管線破壞的結論。With practical instances, this paper introduces construction technology and matters needing attention of repeated - stroked vibrating driven cast - in - place pile
摘要文章結合工程實例介紹復打法振動沉管灌注樁的施工工藝及注意事項。Some means of ground treatment are discussed. all kinds of ground treatment methods are analysed. they are the deeping pile, prestressed tubular piles, diving casing cast - in - place pile, which are often used in shao xing. some problems about design and constrction are proposed
另外,對紹興城區常用的各種地基形式如:水泥攪拌法、管樁、沉管灌注樁等進行了分析,提出了在設計和施工中應注意的問題。Construction of flat tunnel of large span at extra - shallow depth must be conducted on the principle that advance grouting should be strictly performed before excavation and length of pull at one time should be short, together with reinforced support, immediate closing and constant monitoring and surveying. that preceding pilot tunnels, large - volume excavation divided into small ones, excavation of flank before that of center, upper before lower, arch before wall etc is a good method which could effectively reduce surface subsidence and its adverse effect on adjacent buildings, in addition, some other measures are also taken to lessen blast - induced vibration in the ground and surrounding structures. in a word, all means and steps mentioned above have already proved effective and practicable in practice
軟弱大跨超淺埋扁平隧道必須按「管超前,嚴注漿,多分部、短開挖、強支護、快封閉,勤量測」的施工原則進行施工,採用「眼鏡超前,化大為小,先側后中,先上後下,先拱后墻」的施工方法控制地表沉降和對周邊建築物的影響;採用「多分部,化大為小,短進尺,密布眼,弱裝藥,設減振槽」 ,控制爆破振動,經過實踐證明,這些方法都是行之有效的。分享友人