沉降時間測定 的英文怎麼說

中文拼音 [chénjiàngshíjiāndìng]
沉降時間測定 英文
settling-time measurement
  • : Ⅰ動詞1 (沉沒; 墜落) sink 2 (沉下 多指抽象事物) keep down; lower 3 [方言] (停止) rest Ⅱ形容...
  • : 降動詞1. (投降) surrender; capitulate 2. (降伏) subdue; vanquish; tame
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • 時間 : time; hour; 北京時間十九點整19 hours beijing time; 上課時間school hours; 時間與空間 time and spac...
  • 測定 : determine; determination; setting-out; admeasurement; assignment; assay; finding
  1. Researching on the technology if reverse order is to study strains if pits, structural systems if basement, environmental surwey and underpinnings. on account of emphasizing developing methods if checking strength if pick - ets, modemizing machenes of excavation and studying methods of underpinning is put forward and is a way if controlling the quality of pickets in sites, which leads an active effect ; synthetic application if rankintheory, spatial and time effect theory to excavation tl aanalyze the state of soil force and strain is brought forward and the time effect should be considered in the zone of clay, the formation and development of soil plasticity are analyzed and the most dangerous zone to decide how to excavate and where to begin is found ; analyzing the cause of picket settlement during reverse order and the differential settlement and discussing hlw to solute it. duringh the temporary survey and the environmental warship, bringing rorward the theory of environmental vibration and analyzing the state of soil force and probability of losing stabilization of soil under the effect of environmental vibration ; analyzing the state offeree in underground concrete wall by the method of mathematics and pointing out the place of the maximum force and deformation. based on systematic illustrating the reverse order, problems about application and development of reverse order and suggestions also are expressed

    鑒于國內外的研究把重點放在大力發展工程樁的實驗室承載力監方法與設備、如何使土方開挖機械現代化及對周圍建築的臨方法上,本文提出了現場利用聲波層析成像技術監鋼砼樁內部質量的方法與程序,並得出了聲波層析成像技術是砼樁的動態質量檢的有效手段,這對指導施有積極、現實意義;提出了綜合運用朗肯土壓力理論、基坑空效應影響理論來分析逆作法施工過程中基坑邊坡土體應力及應變的變化情況,指出粘土地區也應考慮效應,並且進一步分析了基坑邊坡土體的塑性區形成和發展,找出邊坡最不利的區域,以確地下室土體的挖掘的方式和順序,指出憑主觀臆斷與經驗來施工是不可取的;在分析、經較逆作法與大開挖順作法的地下室結構體系受力情況及施工順序的不同,提出了節點處理技術;分析了逆作法施工期樁的變化原因及由此而產生的差異,並探討了解決的方法;本文還提出了環境振動對土體邊坡穩產生影響的觀點,並分析了在環境振動影響下,土體的應力狀態及土休失穩破壞概率,並且還運用彈性力學知識和數學分析的方法量地分析了地下混凝土墻受力狀態,指出了被監墻體的最大應力、應變位置。
  2. The study solves engineering problem as follows : ( 1 ) the systematic study on the historical course of xigeda strata deposit and geologic environment includes strata, lithologic characters and constitution et in the liangshan and panzhihua region. the results show that the xichang - panzhihua express way is controlled by the anninghe fault and the xigeda fault, the earthquake frequently happen in the region of pass, the different sedimentation number is more great, they effect the road building, safety in operation and structure belong road ( 2 ) because in some place the xigeda strata is foundation and roadbed, the study on the basic properties of the xigeda strata include density, moisture content plastic and liquid limit graduation. the results show that the xigeda strata is deposition in lake, the main component is mudstone and sandstone, the fine particle is main, it has some viscosity, the moisture content of mudstone is different the it of sandstone, the other property are likeness. the xigeda strata has no dilatation on total, some claystone have low and medium dilatation ; ( 3 ) the study on the basic properties of xigeda filler include the composition of matter the biggest standard dry density, the optimum moisture content the results show that xigeda filler can use as road material, it is well grade filler and admixture filler on essence, its compaction index should change in different place because the property is controlled by mudstone and sandstone that change is great in different place ; ( 4 ) the study on the xigeda filler craft used as express way roadbed, includes suitable thickness, compaction numbers and methods and equipment choice et

    公路沿線廣泛分佈有昔格達地層,昔格達地層能否用作高速公路路基填料,國內沒有先例,本論文就是結合導師的科研項目,在非典期,現場長達5個月的工作,完成了從試驗、現場施工工藝到路堤分層等工作,是面對生產實際,認識昔格達地層的性質和其作為地基、路基和填料應用中面臨的問題進行的研究。主要的研究內容有:對攀西地區地層巖性、構造等地質環境和昔格達地層的積歷史過程作了系統的分析,研究表明西攀高速公路主要受安寧河斷裂和昔格達斷裂影響,通過地區地震活動頻繁,差異較大,對公路建設、安全運行和沿線構築物設計有較大影響;由於昔格達地層在有些路段作為地基、有些作為路基,對其基本性質進行了研究:包括天然密度、含水量、塑液限、顆粒級配等指標的試驗研究。研究成果表明:昔格達地層為湖相積,主要為砂巖和泥巖,它以細粒組為主,同粘粒的存在,使其具有一粘性。
  3. The direction guidance system plays an important part in the shield excavation, such as the prevention of snake motion, the reduction of ground settlement of tunnel construction and the insurance of tunnel quality etc. based on the principle of guidance system, a precise direction guidance system with high accuracy, high efficiency and more reliability is developed, it has the advantages of less times of surveying, real time positioning and shield behaviors monitoring

    盾構導向系統是盾構掘進的指揮系統,對指導盾構掘進、隧洞貫通、減少地表以及保證隧洞的質量等具有重要的作用。本文在研究盾構導向工作原理的基礎上開發研製了一套盾構導向系統,精度高、工作可靠,可極大地縮短導向量的和減輕勞動強度,實現了盾構掘進的實位和姿態監
  4. The data captured in field tests and observations both prove that crossrange prestressing can effectively reduce roadbed settlement, shorten the roadbed compression and stabilization period, and increase the capacity of roadbed

    通過試驗路段的試驗以及竣工后一段期觀,表明側向施加的預應力能減少路堤總,縮短工后期,提高路堤的承載力。
分享友人