沉降測量 的英文怎麼說
中文拼音 [chénjiàngcèliáng]
沉降測量
英文
settlement gauging- 沉 : Ⅰ動詞1 (沉沒; 墜落) sink 2 (沉下 多指抽象事物) keep down; lower 3 [方言] (停止) rest Ⅱ形容...
- 降 : 降動詞1. (投降) surrender; capitulate 2. (降伏) subdue; vanquish; tame
- 測 : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
- 量 : 量動1. (度量) measure 2. (估量) estimate; size up
- 測量 : measure; survey; gauge; meter; measurement; measuring; surveying; mensuration; metering; gauging;...
-
Based on the terszige and biot theory, initially analyze the economical of this experiment, directly save investment 22 % after compute. after that, computing the settlement of highway foundation, comparing the computing and survey value, the predict formula of vacuum - heaped load combining precompression for designing, this formula show that the distortion law of consolidation progress. at the same time, based on the position and room experiment, analyzes the intension transformation in soft soil and criteria of stabilization control
在太沙基和比奧固結理論的基礎上,先分析了此次試驗的經濟性,經核算直接節約投資22 ,經濟效益十分明顯;隨后對真空堆載聯合預壓法加固軟土路基的沉降量進行了估算,並與實測值作對比分析,得出了真空堆載聯合預壓下的沉降量估算公式,能反映「真空」加固過程的變化規律;同時根據現場和室內試驗,分析了軟土強度的變化,以及給出並驗證了工后沉降控制標準。As to planar visco - elastic prediction of settlement, this paper fixes on range of the back - calculation parameters range, analyzes back - calculation parameters which are indispensably in the course of anti - analysis. since it is difficult to acquire the optimization result in simultaneous back - calculation, this paper puts forward a calculation method which combined with investigation data and field experiment data to minimize the parameters to get optimization
( 2 )針對二維粘彈性沉降預測,確定了模型反演參數的取值范圍,對于多層軟土地基變量同時反演很難獲得最優解的問題,提出結合工程勘察和現場實驗以減少參數的方法獲得最優解。The rule of loads and settlement is concluded from numbers of settlement observation points ’ data. and in actual construction, this rule could be used to prevent immediate settlement under the accelerated load, and also, the serious result of the soil destruction could be avoided. at last, a proper method of settlement computing is derived from the identified rules, which can be used to guide the practical construction work, of course, meeting the compulsory standards of the settlement control well
採用逆作法施工,現實地解決了樁、土與筏板接觸面的變形協調關系;通過對樁、土受荷過程的實際測試,得出了樁、土分擔荷載比例和變化過程,從而為樁、土的荷載計算提供實際依據;從設置的大量沉降觀測點中所得到的沉降資料,得出荷載、沉降變化規律,從而指導在實際施工中,防止加載過快而導致速沉,避免由此帶來的土體破壞的嚴重後果;通過沉降規律分析,得出了適用於軟土地區的樁基沉降計算方法,用於指導實際施工,以滿足沉降控制的強制性標準。The country has made substantial scientific and technological achievements in some research areas, such as the comprehensive prevention and control of beijing ' s environmental pollution, the capacity of the atmospheric environment, the background value and environmental capacity of the nation ' s major soils, acid deposition and its impact and control, the forecasting and monitoring of the influence of the changes in the global climate and corresponding countermeasures, the depollution of coal, and the control of air pollution
國家取得了北京市環境污染綜合防治研究、大氣環境容量研究、全國主要土壤背景值與環境容量研究、酸沉降及其影響和控制技術研究、全球氣候變化預測影響和對策研究、潔凈煤及大氣污染控制技術研究等一大批科技成果。At last, the author simulated destructive process of the reinforced foundation with ansys program. and the bearing capacity and settlement of numerical simulation is consistent to test results, which proved that the numerical simulation is right and the simulation is feasible with ansys program, this method enriched study resorts of reinforced foundation
最後,採用ansys程序對該加筋地基的破壞過程進行數值,模擬所得的地基承載力和沉降量與實際檢測結果基本一致,證明了數值模擬的準確性,也證明了用ansys程序對加筋地基進行數值模擬的可行性,豐富了加筋土地基研究的手段。Through summarization for complicated geohydrology and engineering geology condition of research area, the non - stability 3 - dimension flow model of ground water and land subsidence model were established in this thesis. the coupled models of ground water and land subsidence were combined with a large series of water level observation and land subsidence information to debug the parameters and ascertain the models
兩者通過含水層的水位內在聯系耦合在一起,並根據研究區水文地質條件及抽水試驗資料,結合大量的水位觀測序列資料及地面沉降觀測資料對模型進行調參,標定地下熱水運移的三維有限元數值模型,所建模型可以對地下水水位及地面沉降同時進行模擬預測。Measures preventing a nd handling hole caving are given based upon analyzing various factors that infl uence hole wall stability including objective, technological, environmental and artificial factors
開挖期間進行了水平位移及沉降、深層位移、圈樑應力、水位及水量等項監測,對監測結果進行了分析,對監測發現的問題及時進行了處理,為基坑開挖提供了保障。There are some disadvantages in these routine methods, for example, they takes many steps and costs much time, and the accuracy of results is effected greatly by subjective factors of human inspectors
目前對粉體粒度的測量大多採用沉降法等常規方法,存在測量時間長、測量步驟多、測量準確度受主觀因素影響大等許多不利因素。The collapsible loess is often met during the construction of the high - grade highway in the loess area, and the main failure is the uneven subsidence of the roadbed and the culvert, which affects the safe usage of the roadbed and the culvert, etc. directed against this, based on the chankou - lanzhou freeway construction, the paper analyzes the application of the composite ground formed by lime - soil pile under the bridge and designs the project, discusses the rules of the contact pressure, the stress ratio of the pile and the soil, compares the p - s curves of one pile, the composite ground formed by one pile and the composite ground formed by two piles based on the in - situ plate loading test, evaluates the bearing capacity of the composite ground of the project
黃土地區的高等級公路建設中經常遇到濕陷性黃土問題,其病害類型主要是地基土受水浸濕后引起路基、橋臺、涵洞等的不均勻沉降,直接影響路基、構造物等的正常使用。針對此問題,本文依託甘肅讒口至蘭州柳溝河高速公路建設工程,對橋基灰土樁復合地基應用的可行性進行了深入分析,根據具體工程進行了合理的設計與計算,並配合現場靜載荷試驗及壓力盒實測數據,探討了基底應力分佈規律,樁土應力比,變形模量的變化關系,對比分析了單樁、單樁復合和雙樁復合的p ? s關系,對橋基灰土樁復合地基承載力進行了整體評價。The results show that the ultimate bearing capacity can be increased 10 % - 40 % and the lateral displacement and vertical settlement can be decreased 20 % - 50 % and 30 % - 50 % respectively, if the sand foundation is reinforced by geogrid
由模型試驗測量結果得知,在砂土地基中鋪設塑料土工格柵,可以使承載力提高10 % ~ 40 % 、側向位移量減少20 % ~ 50 % 、地基軸線處豎向沉降減少30 % ~ 50 % 。Particle size analysis ; sedimention analysis ; principles ; evaluation equations for determination of quantities in the field of centrifugal force
顆粒度分析.沉降分析.原理.離心力場中量測定的評定公It is necessary to make more profound research in the field of settlement prediction. in this dissertation, on base of the existing work, the three - point method which is the mostly used method in the settlement prediction has been studied thoroughly firstly, which indicated and discussed the deficiency of the three - point method, and as a result an improved three - point method was put out ; secondly, by analyzing the characteristics of the process of the foundation settlement we put forward the model for predicting foundation settlement based on " law of massaction ". the predictive result was ideal as we applied it to the 3. rd coalfield project of wenzhou power plant and project of wenzhou peninsula, which shows that the model deserve use in much more projects
本文在對國內外關于地基沉降預測理論的研究進行綜述的基礎上,首先對工程中常用的三點法進行了細致深入的研究,指出以工程實測數據證明的現有三點法在應用時存在的不足,針對該不足進行了探討,並在此分析基礎上提出了預測結果更為理想的改進三點法;其次區別傳統沉降預測方法的研究途徑,本文從沉降過程的發展特徵出發,根據描述物化反應過程發展特徵的質量作用定律原理,探討了一種新的地基沉降預測方法:地基沉降預測的「質量作用定律」模型;本文還以溫州三期煤場工程及溫州淺灘圍塗促淤工程為背景,對上述改進三點法、地基沉降預測的「質量作用定律」模型的工程應用與傳統的預測方法進行了比較,認為這些方法是可行的,並得出一些有用結論。Various previous methods after the loading is constant are summarized and classified into two categories : semi - math methods and pure - math methods, the common and difference among these methods is discussed. then, by analyzing the characteristics of the process of the foundation settlement, the model for predicting foundation settlement based on " law of massaction " is put forward. this paper relies on the research of the section of the soft foundation of the shen zhen bay
本文總結了以往荷載穩定后的沉降預測方法,將其劃分為半數學方法與純數學方法,尋找各預測方法相互之間的聯系;其次區別于傳統沉降預測方法的研究途徑,從沉降過程的發展特徵出發,根據描述物理化學反應過程發展特徵的質量作用定律原理,探討了地基沉降預測的「質量作用定律」模型。Through analyzing the in - situ data such as total settlement, layered settlement and pore water pressure, the actual deformation behavior of soft foundation are mastered. after summarizing the methods of predicting settlement of soft foundation and bring forward a method to predict the post construction settlement of the surcharge preloading soft foundation. and the engineering application of the predicting foundation settlement based on “ law of massaction ” and the traditional predicting methods are compared, the results shows that the model is useable and it deserves more validation in more projects
本文以深圳灣軟基處理工程試驗區為背景,通過對淺層沉降、分層沉降、孔隙水壓力等資料的分析,掌握了軟基變形的實際性狀;在總結軟基路堤沉降預測方法的基礎上,探討了軟基超載預壓工后沉降預測的參數反演法;並對地基沉降預測的「質量作用定律」模型的工程應用與傳統的預測方法進行了對比,驗證這種方法是可行的,得出了一些有用的結論。The prototype observation shows that because settlement of soil is larger than that of piles, " arch effect " appears in the embankment so that its weight is gradually transferred from the soil to piles and pile - soil stress ratio increases
現場原型觀測表明,樁間土的沉降量大於樁頂的沉降量,填土中出現拱效應,填土荷載逐漸從樁問土向樁頂轉移,樁土應力比逐漸增加。Support vector machine model of settlement prediction of road soft foundation
公路軟基沉降預測的支持向量機模型Surface settlement is due to layer losses and the layer losses are due to the changes of stress state and water content. it is necessary to probe into the principle, but to pay more attention to the aftermath of layer losses - surface settlement and its regularity. this paper has focused on discussing about the regularity of surface settlement in tunneling construction
地表之所以發生沉降,是因為發生了地層損失,而地層損失主要是由於土的應力狀態和土的含水量發生了變化,機理的探討是必要的,但是人們更關心地層損失造成的後果?地表沉降,更關心地表沉降的規律性,本文討論了隧道施工過程中地表沉降的規律,將隧道施工方法分為盾構法和礦山法兩種,結合理論分析和實測結果,分別給出了地表沉降曲線和沉降范圍的經驗公式,其結論對北京地鐵隧道的設計與施工具有重要的參考價值。According to this practical project, beijing metro no. 10 line crosses under the beijing metro no. 13 line existed station structure, this paper has made an overall and systemic analytical study on crosswise surface settlement and the longitudinal surface settlement process which influence by metro tunnel construction with shield driven method through analyzing a mass of site monitoring data. the settlements in different period are concluded, the crosswise surface settlement influence scope, some construction factors to surface settlement has been analyzed too
本文針對北京地鐵十號線芍藥居至北土城東站區間隧道下穿既有城鐵十三號線芍藥居車站結構這一實際工程,通過大量的現場監測資料分析,研究了盾構掘進過程中對橫向地表沉降和縱向地表沉降的影響過程;探討了盾構掘進各個階段的沉降占總沉降量的百分比;分析了盾構掘進對橫向地表沉降的影響范圍,以及各種施工因素對地表沉降的影響。During the construction of the freeway, the work of safety monitor of the roadbed sedimentation provides first - hand information for all kinds of researches, with large numbers of locale data
在高速公路建設過程中進行沉降觀測工作,以大量的現場實測數據為各種分析研究提供第一手的資料。2. the methods that differentiate the soil practical sedimentation from the monitored data are recommended, when the data are measured credibly in the measure process
在確保觀測數據量測過程可靠的前提下,對數據是否為土體的實際沉降的真偽辨別方法作了分析介紹。分享友人