河段來水 的英文怎麼說

中文拼音 [duànlāishuǐ]
河段來水 英文
inflow to reach
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  • : 來動詞1 (從別的地方到說話人所在的地方) come; arrive 2 (發生; 來到) crop up; take place; come ...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • 河段 : [水文] channel segment; stream segment; reach
  1. Based on 2m contour of surveyed bathymetry from 1976 to 1999 and mean - high - tidal line distracted from remote sensing images acquired by landsat - 5 tm from 1976 to 2000 respectively, quantitative analysis about alluvion and erosion as well as the relationship between accretion of modern yellow river delta and the water and sediment discharge of yellow river is made, and the results indicate the mean - high - tidal level is more effective than 2m contour of the bathymetry. it is found that the accretion of modem yellow river delta is becoming less and less, what ' s more, erosion is even more than alluvion in some recent years. diaokou promontory has been eroded seriously since yellow river changed its course in1976

    以一般高潮線反映現代黃三角洲沖淤演變時,從1976年黃改道清溝流路入海到2000年,整個黃洞三角洲凈造陸201 . 5km ~ 2 ,淤積有逐漸變慢的趨勢,甚至出現凈蝕退的年份;刁口嘴大量蝕退,蝕退速率開始快速,后逐漸變慢;清嘴大量淤積,淤積速率開始迅速,后逐漸變慢,甚至出現凈蝕退;清嘴南側到支脈溝一岸線與刁口嘴以西到灣灣溝一岸線基本穩定。
  2. Then i turned and went down chesnut - street and part of walnut - street, eating my roll all the way, and, coming round, found myself again at market - street wharf, near the boat i came in, to which i went for a draught of the river water ; and, being filled with one of my rolls, gave the other two to a woman and her child that came down the river in the boat with us, and were waiting to go further

    於是我轉個彎,經過栗子街和胡桃街的一,在路上吃那一卷東西,兜一個圈子,發現我又在市場街碼頭,離開我剛時停船處不遠,我到那裡去喝一點,我的三卷中的一卷已塞滿我的肚子了,於是就把另外的兩個給一個婦人和她的孩子,她是和他們一齊的,正在等著到更遠的地方去。
  3. It was a monstrous big river down there - sometimes a mile and a half wide ; we run nights, and laid up and hid daytimes ; soon as night was most gone we stopped navigating and tied up - nearly always in the dead water under a towhead ; and then cut young cottonwoods and willows, and hid the raft with them

    一到下游那邊,只見一條大得嚇人的大有的地方面有一英里半開闊。我們在夜晚行駛白天,便躲起。夜快盡了,我們便停止航行,把筏子靠岸總是靠在一處沙洲流平靜的地,然後砍下白楊和柳樹的嫩枝,把木筏子給遮蓋起
  4. There will eventually be a total of 12 turbines on the right side of the three gorges dam, which is in the midsection of the yangtze, china ' s longest river

    三峽大壩右側未一共將有12個輪發電機組。三峽大壩位於中國最長的流長江的中
  5. There are 5 depositional systems in the region. they are panne and jishan delta systems coming from chengning heave near the northwest border of the region, shuangfeng delta located in southwest part of the region coming from luxi dome, qudi fan - delta located in the southeast of the studying area and the sub - fan near fault or fan - delta of the southern part of the region. based on the study of sedimentary facies and depositional systems, 11 lithological traps are predicted

    在等時地層格架內對沙三各中期基準面旋迴內的沉積相和沉積體系進行了詳細研究,確定了沙三沉積時期發育的五種沉積體系類型,即自凹陷西北邊界埕寧凸起的盤三角洲體系和基山三角洲體系、自魯西隆起、分佈在凹陷西南部的雙豐三角洲體系、東南部的曲堤(扇)三角洲體系,南部的近岸下扇/扇三角洲體系。
  6. World economic development process is divided into 3 stages according to transportation progress : " river economy ( re ) ", " marine economy ( me ) " and " road - bridge economy ( rbe ) ". the origin, evolution, social - economic characteristics and implications of re and me are analyzed in detail and the origin and evolvement of rbe is introduced after these backgrounds

    主要闡述用交通劃分經濟發展階,世界經濟大體相應地經歷了「江經濟」發展階、 「沿海經濟」發展階、 「路橋經濟」發展階,著重分析江經濟、沿海經濟的源起、發展、經濟社會發展特徵及其啟示,從而說明路橋經濟的形成與發展。
  7. 2. by the analysis of grain - size accumulative centigrade content, grain - size composition and grain - size parameters performed on samples in baijiaziu profile and mafangtan profile, nine stages of hydrological and climatic changes since the last 1300 years have been distinguished. the first, the third, the fifth, the seventh and the ninth layers of the stratigraphical sequence are finer while the second, the fourth, the sixth and the eighth are coarser

    據此,將白家嘴剖面劃分為9個地層單位, 4個沉積旋迴,其中剖面1 、 3 、 5 、 7 、 9層較細, 2 、 4 、 6 、 8層較粗,並認為此沉積序列表明近1 . 3ka以文與古氣候大致經歷了9個變化階
  8. According to all the sediment peaks of 35 floods observed at each station on the downstream of xiaolangdi, it analyzes the characteristic of delayed sediment peak and establishes a regression equation between sediment peak lag time for each section of xiaolangdi, huayuankou, jiahetan, gaocun, sunkou, aishan and lijin and peak discharge, sediment concentration of the peak, flood propagation velocity and fall velocity of suspended load of the previous station, which can search, make up and extend sediment peak lag time and provide a basis for accurate forecasting on sediment peak travel time of each station on the lower yellow river

    根據小浪底下游各站沙峰均滯後於洪峰的35場洪,對沙峰滯後於洪峰的特性進行了剖析,建立了小浪底、花園口、夾灘、高村、孫口、艾山、利津各沙峰滯后時間與上站洪峰流量、沙峰含沙量、洪傳播速度、懸移質泥沙群體沉速之間的回歸方程,可以用查補延長沙峰滯后時間,為下游各站沙峰傳播時間的準確預報提供依據。
  9. The trees impending over it had flung down great branches, from time to time, which choked up the current, and compelled it to form eddies and black depths at some points ; while, in

    懸在溪上的樹木常年投下的大樹枝,阻逼了溪流,在一些地方形成了漩渦和深潭而在溪暢通流得歡快的地,則露出底的石子和閃光的褐砂。
  10. The behaviors of the inflow and sediment, the recent evolution rules and trend of the river channel in this section as well as the changing rules and causes of the change of the hechangzhou brai - ded channel are analyzed and the scheme researches, engineering design, construction and the effects of the control works at the entrance of the left branch of the hechang sandbar are presented in the paper

    根據鎮揚目前的情況分析了該河段來水沙特點、近期道演變規律及演變趨勢,介紹了該二期整治工程的基本情況,並著重介紹了和暢洲左汊口門控制工程方案研究、設計、施工及工程效果等內容。
  11. In order to control the flood and to mitigate wangering of the section, since the beginning of building water control works on the yellow river, some 3700 dams, battlements and revetments have beed set up. these works have played an impotant role in flood control

    人民治黃以,為了有效地控制洪,減少主流游蕩范圍,在該已修建了3700多道由壩、垛、護岸組成的道整治工程,對保障防洪安全起到了重要作用。
  12. Continuous downpour on the upper reaches of the yangtze river has resulted in this year ' s heaviest flood, with 3, 3000 cubic meters of water flowing into the three gorges reservior every second

    這幾日連續不斷的傾盆大雨使得揚子江上遊區域迎了今年洪峰,平均每一秒就有大概3 , 3000立方米的流進三峽大壩的貯池。
  13. Manwan hydropower station, located in the middle stream of lancang river, is the largest state key construction project in yunnan province

    摘要位於瀾滄江中遊的漫灣電站是雲南省至今投資最大的國家重點建設項目,電站建設和運行以出現了一些社會、經濟和生態環境問題。
  14. Based on the analysis of satellite images of various periods, landform data and river channel transverse section evolution in the lower yellow river, the characteristics of the river channel boundary condition changes at different location are clarified as middle flood channel flood transport width and area are evidently decreased especially for the main channel with comparison to 1950s, beach area that is unimpeded before become blocked because of road, irrigation channel constructed on it, and consequently intensify high edge of beach and lowering dyke and river

    在現場查勘的基礎上,通過對丹江口庫和小浪底庫攔沙初期下遊道演變、排洪能力變化特點的對比,分析了黃下游防洪面臨的新形勢:小浪底庫攔沙初期,下遊道發生沖刷,但艾山以下窄沖淤變化不大,近年形成的淤積萎縮的狀況難以很快改觀,游蕩性調整劇烈,工程出險機遇增大,位流量關系中流量以下部分同流量位明顯降低,中流量以上部分位降低幅度可能會明顯偏小,防洪形勢仍不容樂觀。
  15. In recent years, with the development of the economy in shengli oil - field, the water resources demand has increasingly added. at the same time, the yellow river valley economy has gain the significant increment in the last ten years, so its water use continually increases. the water measure of the yellow river mouth in shengli oil - field continuously has reduced, and breaking flowing time has become more and more, resulting in the contradict with oil - field supply and demand turning worse continuously

    近年,隨著勝利油田經濟的多元化發展和城鎮化進程的加快,必然導致對資源需求量的增加,與此同時,黃流域在近十幾年同樣經歷了一個經濟高速發展期,流域內的耗量大幅度增加,黃量不斷減少,斷流時間越越長,造成了以黃為主要源的勝利油田供需矛盾不斷加劇,供工程暴露的一些問題亟待解決。
  16. The results showed that each river flow has a tendency to gradual decrease mainly by soil and water conservation in the above four catchments. the critical year of the river flow decrease was 1974, 1974, 1977 and 1974 for jia - lu - he, tu - wei - he, pian - guan - he and qiu - shui - he catchments, respectively. each river flow has been divided into prophase and anaphase period according to the critical year

    結果表明:土流失綜合治理是引起徑流量減少的主要原因之一;從上世紀七十年代以,四條流域的年徑流量均出現逐年減少的趨勢;在研究時內,佳蘆、偏關、禿尾和湫徑流量發生趨勢性減少的臨界年份分別為1974年、 1974年、 1977年和1974年。
  17. When xiaolangdi project completed and put into orperation, the inflow of water and sediment condition will be changed because of the regulation of the reservoir. especially the initial 14 years, the reservoir will hold up sediment and release clear water, which may affect the river sections in henan province, especially the wandering sections. it will result in changes of flow state and endangering the water works, because the longitudinal addend by scouring and lateral slope failure

    小浪底庫建成運用后,通過庫的調調沙,改變了黃下游的沙條件,尤其是運用的前14年處于攔沙期,下泄清,對道的影響最為劇烈,對游蕩性勢變化將產生很大影響,道縱向沖刷下切,橫向灘岸坍塌,工程出險將大量增加。
  18. The paper calculates the volume of scour and fill of the inner mongolia section of the yellow river respectively through the observed data of cross sections, coming sediment and variations of water level with same discharge and the results are basically the same

    摘要通過實測斷面資料、沙量資料和同流量位的變化等,對黃內蒙古的沖淤量分別進行了估算,其結果基本一致。
  19. Along with 21 centuries putting into effect step by step of strategy is developed greatly in our country the west, and this district will be the west possesses one of district of the development vigour, rapid development of society economy most, and ensures public security that the requirement put forward entirely is also more and more higher to preventing flood, therefore would rather quickening ningmeng course further, the river training is very necessary

    隨著21世紀我國西部大開發戰略的逐步實施,該地區將是西部最具發展活力的地區之一,社會經濟的迅速發展,對防洪保安全提出的要求也越越高,因此,進一步加快寧蒙的治理是十分必要的。本文通過分析黃寧蒙文泥沙特點、道特性、以及龍、劉庫運用后對寧蒙的影響,闡述了寧蒙道整治的重要性。
  20. Impact of flood events from different source areas on channel transects adjustment at the wandering - braided reach of the lower yellow river

    不同源區洪對黃下游游蕩床橫斷面形態調整過程的影響
分享友人