河段蓄水 的英文怎麼說

中文拼音 [duànshuǐ]
河段蓄水 英文
water storage in reach
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  • : 動詞1. (儲存; 積蓄) store up; save up 2. (留著而不剃掉) grow 3. (心裏藏著) entertain (ideas); harbour
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • 河段 : [水文] channel segment; stream segment; reach
  • 蓄水 : [水文] retain water; store water; [土] impound蓄水池 pool; reservoir; source; cistern; lasher; pi...
  1. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝,壩型為305米高雙曲拱壩,正常位標高1880米。壩址區出露的地層為三疊系雜谷腦組二大理巖和三疊系雜谷腦組三的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  2. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂電站位於四川省阿壩藏族羌族自治州汶川縣境內的岷江上,電站為低閘引式開發。正常位1268 . 0m ,最大閘高31m ,庫容297 . 4萬m ~ 3 ,引隧洞長19 . 57km ,裝機360mw 。福堂電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  3. The research of bend channel of reach guide - lijia flume from longyang flume to lijia flume in upstream of the yellow river is proceeded to present rules of feasibility analysis for navigation between the flumes and the riverbed stability

    摘要對黃上游龍羊峽至李家峽間的貴德李家峽的蜿蜒道進行了研究,為兩壩間的通航和床穩定性問題提供可行性分析依據。
  4. The analyzed results are as follows : the late 1960 ' s cutoff of riverbends increased both the runoff amount and the sediment transport amount of the lower reach of jingjiang river, while the sediment deposition decreased in the lkngting lake area ; after the mid 1980 ' s, both the middle reach of yangtze river main stem and the dongting lake occurred a trend of decreasing annual sediment transport as a result of decreasing sediment releasing from the upper reach of yangtze river ; and in the recent 3 years ( 2003 - 2006 ), the three gorges reservoir first impoundment additionally reduced the sediment concentration in the middle reach of yangtze river flow with a long time, so a distance would be quite long for suspended sediment recovery, but the distance for bed - material load of suspended sediment recovery would be quite short

    分析結果表明: 20世紀60年代下荊江裁彎后,三口(松滋口、太平口、藕池口)分流分沙減少,下荊江徑流量和輸沙量相應增加,洞庭湖泥沙淤積減少; 80年代中期以後,長江中游幹流及洞庭湖出口的年輸沙量呈減少趨勢,城陵磯至武漢床由淤積轉為趨向沖淤平衡;三峽工程初期運用后,長江中游含沙量沿程恢復距離較長,但床沙質部分恢復距離相對較短。
  5. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建壩工程荷載條件下谷巖體力學環境分析及右岸古滑坡體的穩定問題分析得出:建壩后谷的巖體應力量值明顯增高,同時左岸的張應力區的范圍及量值明顯減小,主應力的方向依然與模型的底邊界垂直;大壩建成后逐漸以及同時考慮本區最強地震力的作用等各種不同的工況條件時,滑坡體及壩體總體上仍處于穩定狀態;位驟降時,在未考慮其他外力作用的情況時,滑體的安全系數將顯著降低。若考慮位驟降及本區最大地震力的共同作用,壩體將在滑坡體下滑推力的作用下產生破壞;建壩后平推力對右岸古滑坡體穩定性的影響分析可以看出,在最危險的工況條件下,壩體及滑坡體也將處于臨界狀態;在長期滲透變形的作用下,由於滑帶的物理力學參數的降低而有可能導致壩體失穩破壞。
  6. Navigation management at the river reach near gezhouba after water filling of the three - gorges reservoir

    三峽后的葛洲壩近壩通航管理
  7. ( 2 ) the key problem to the application of muskingum approach, in another word, there exists non - linear effect. therefore, to meet the demand of practical engineering to a more satisfactory extent, it is vital to convert the linear formula in muskingum model to a non - linear one

    2 、在文學中馬斯京根( muskingum )法是道洪演算中廣泛應用的方法,因該槽方程是線性的,即把k , x在一定內假定為常數,這在某些情況下是不切實際的,為此必須將馬斯京根模型中線性的槽方程非線性化,才能更好地滿足實際工程的需要。
  8. Based on the analyses of the flow and sediment characteristics and evolution trend of the river bed of the fuling reach in the yangtze river before and after the impoundment of the three gorges reservoir, the water level, velocity variation and influenced range in the fuling reach before and fifty years after the operation of the three gorges reservoir with the construction of the fuling dock and four discharge combinations are calculated by using a two - dimensional flow mathematic model

    摘要在分析長江涪陵沙特性和三峽前後該床演變趨勢的基礎上,運用二維流數學模型,分析了4種流量組合情況下在三峽庫運用前和運用50年,涪陵港區碼頭修建前後的位、流速變化及其影響范圍。
  9. Which is situated in the western of he nan and is drought year in year out and it is a multiple - purpose water supply development with agricultural irrigation, municipal water supply and rural water of men and domestic animals. the irrigation district was designed by he nan water survey designing institute in 1967, and began to be built in 1970. the aggregate main canal and the east - two main canal were built up and began to irrigate partially in 1974. up of the dong song part of the main canal had been built in 1980, and the first periodical project was completed in 1991. one part of the west main canal was built afterward

    南省陸渾灌區是南省百萬畝以上大型灌區之一,地處十年九旱的南省西部,是一集農業灌溉,城市供,農村人為一體的多目標供工程,灌區於1967年由南省利勘測設計院開始勘測規劃設計, 1970年開工建設, 1974年建成總乾渠、東二乾渠,並通局部施灌, 1980年完成東一乾渠東宋以上渠, 1991年第一期工程竣工驗收,以後又修建了西乾渠部分工程。
  10. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析下坂地利樞紐工程,由於該工程床覆蓋層深度最深達147 . 95m ,是壩體高度的近兩倍左右,壩基的滲流和液化成為壩體安全主要問題,本文對該壩的三種設計方案即平鋪層防滲方案、粘土心墻防滲方案及瀝青心墻防滲方案的靜態應力位移及壩體在竣工期、期等各個階可能產生的破壞進行了認真研究。
  11. Impact of new operation regulation of three gorges reservoir on navigation of chongqing reach

    三峽庫新方案對重慶航道的影響
  12. Capacity in the henan section of the lower reaches of the yellow river

    下遊地下調庫設想
  13. On basis of the concrete character of the whole reservoir bank, the reconstruction of reservoir bank is valuated and forecasted by means of analogy method, which means to acquire the ultimately stable slope angel of zone being affected by reservoir water after reservoir storing water by analogy to the slopes " configuration parameters of the yangtze river before the reservoir storing water

    針對庫區的具體情況,採用現代長江谷岸坡形態參數類推后相應位作用帶的最終穩定坡角,對145m和175m兩種庫位條件下的庫岸再造進行了預測和評價。預測和評價結果表明,再造強烈的庫岸累計總長4 . 05km ,占整個庫岸總長( 10 . 352km )的39 . 1 。
  14. Eutrophic investigation and assessment on backwater reaches of several typical branches of three gorges reservoir at 135m water level

    典型次級流回富營養化監測評價
分享友人