油量測定員 的英文怎麼說

中文拼音 [yóuliángdìngyuán]
油量測定員 英文
gauger
  • : Ⅰ名詞1 (脂肪; 油脂) oil; fat; grease 2 (姓氏) a surname Ⅱ動詞1 (用桐油、油漆等塗抹) apply t...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 員名詞1. (指工作或學習的人) a person engaged in some field of activity 2. (指團體或組織中的成員) member Ⅱ量詞(用於武將)
  • 油量 : oil mass
  • 測定 : determine; determination; setting-out; admeasurement; assignment; assay; finding
  1. At the quality supervision monitoring center for oil plants and manufactured products under the ministry of agriculture, li peiwu, director of the center and a research fellow, introduced the monitoring technologies for the quality of aanola, especially the quick tester of top - quality rapes. this tester can test the glucosinolate and erucic acid contents at a fast speed, and it is characterized by a low charge for testing costs

    在農業部料及製品質監督監中心,中心主任李培武研究向學介紹了雙低菜的質技術,並重點介紹了該中心的優質菜速儀,該儀器可以快速硫甙和芥酸含,並且具有試費用低的特點。
  2. Then we define criterions including a series of software practice process and method and tools, which are also fit most of home software corporation to application software exploration and fit them to improve their software exploration engineering management before passing evaluation of cmm. the criterions we defined using a series normative process and document to engineer software exploration, which include " project management criterion ", " configuration management criterion ", " software test criterion ", " document writing criterion ", " software exploration and maintenance criterion ", ' software life cycle guide ", etc. " project management criterion " defines area and principle of software research management, which is practiced to manage the people, technology, resources, software, process and so on to improve efficiency and to ensure quality and increase income

    《項目管理規程》義軟體研發管理的范圍、原則,通過實施該規程來對項目中的人、技術、資源、軟體、過程等進行全方位的管理,一西南石學院碩卜學位畢業論文以達到提高效率、保證質、降低消耗、增加收益的最終目的; 《配置管理規程》 ,通過實施該規程對項目開發過程中的所有資源進行控制; 《軟體試規程》義對軟體系統試所用工具、過程和責任: 《文檔編制規程》提供滿足國家《計算機軟體文檔編制規范gb8567 》標準的各種文檔模板來建立統一的文檔編制規范; 《軟體開發和維護規程》義了軟體開發過程以及採取的方法和工具; 《軟體生命周期指南》 ,根據軟體項目管理的經驗,將典型軟體過程形成軟體過程模型,用於指導以後軟體周期的選擇; 《年度公司規劃》 ,對需要公司總體安排的資源統一調度的過程。
分享友人