泄水接頭 的英文怎麼說

中文拼音 [xièshuǐjiētóu]
泄水接頭 英文
drain connection
  • : Ⅰ動詞1 (液體、氣體排出) let out; discharge; release 2 (泄露) let out (a secret); leak (new...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • 接頭 : 1 (連接起來) connect; join; joint 2 (找人聯系) contact; get in touch with; meet 3 (了解情況...
  1. Energy consume, electric strength, insulation resistance, ground conductivity, leakage current, microwave leakage, power input, normal temperature, humidity treatment, glow wire, horizontal flame, vertical flame, tracking, ball pressure, rainproof, water splash, dustproof, salt fog, endurance, motor load test, cord flexing, cord pulling, pull & torque test, lamp replacement, construction check etc

    能耗、電氣強度、絕緣電阻、地連續性、漏電流、微波漏、功率、溫升、濕熱試驗、灼熱絲、平燃燒、垂直燃燒、漏電起痕、球壓試驗、防雨淋、防濺、粉塵、鹽霧、耐久性(壽命)試驗、電機負載試驗、電源線彎折、電源線提拉、拉扭力測試、燈互換性、安全結構檢查等。
  2. If the hose is left on the figure 85 and 90m in freezing weather, the valve ' s self - draining feature will protect the sillcock from freeze damage if : 1 ) the nozzle is not left affixed to the hose ; and 2 ) the entire hose length is on a plane lower than the fixed position of the frostproof sillcock

    如果型號85和90m的軟管位於冰凍氣候中,閥門的自排功能將會保護灑不會凍壞,如果: 1 )灑出口沒有連軟管;或2 )整個軟管長度都位於防凍灑的連點下方。
  3. Connect copper pipes, lines and water pipes with indoor parts. connectors should be tightened to prevent leakage

    將銅管、連線、管與室內機連好,銅管必須擰緊,不能有漏現象,排管不能有漏現象。
  4. Sewage standard discharge connection

    標準排
  5. Leakage checking : to apply soap water to all connectors for checking leakage or not

    檢漏:用肥皂對各連進行檢查,有無漏。
  6. Plastics piping systems - end - load - bearing and non - end - load - bearing assemblies and joints for thermoplastics pressure piping - test method for long - term leaktightness under internal water pressure

    塑料管道系統.熱塑性壓力管道用端部承載及非端部承載組件和.內部壓下長期防漏的試驗方法
分享友人