泄水閘門 的英文怎麼說
中文拼音 [xièshuǐzhámén]
泄水閘門
英文
outlet gate- 泄 : Ⅰ動詞1 (液體、氣體排出) let out; discharge; release 2 (泄露) let out (a secret); leak (new...
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 閘 : anchor gate
- 門 : Ⅰ名詞1 (房屋、車船等的出入口 ) entrance; exit; door; gate 2 (形狀或作用像門的東西) switch; va...
- 閘門 : 1 (水閘) sluice gate; gate; water gate2 (船閘) lock gate3 [機械工程] throttle valve; strobe; ...
-
Certain possible inventions of which he had cogitated when reclining in a state of supine repletion to aid digestion, stimulated by his appreciation of the importance of inventions now common but once revolutionary for example, the aeronautic parachute, the reflecting telescope, the spiral corkscrew, the safety pin, the mineral water siphon, the canal lock with winch and sluice, the suction pump
當吃飽后,為了助消化而仰臥著時,他曾思考過幾項發明的可能性。這是由於認識到如今雖已司空見慣當初卻曾是巨大革新的那些發明的重要性,從而受到刺激:比方說,航空降落傘反射望遠鏡螺絲錐別針瓶裝礦泉水運河那有著絞車與泄水道的閘門裝置抽水機。The main work is done with the help of model experiment. in the flood - relief experiment, the flood carrying capacity of spillway tunnel is checked. in the hydraulic experiment of the diversion power conduit system, the followings are studied : the flow condition and fluctuation in the surge chamber, the distribution of flow velocity before the rack in the surge shaft, the amplitude of stage in the quick gate bay etc. the test step, content and results of different proposals are introduced in details
本項優化試驗研究的目的主要在於,通過泄洪系統整體水力學試驗,校核泄洪洞的泄流能力;通過發電引水系統整體水力學試驗,研究調壓井內水流流態和水位波動情況、調壓井內攔污柵前流速分佈情況;確定快速閘門井內水位波動幅度;試驗確定壓力管道水擊壓力穿井系數以及泄洪洞弧形門處的水壓力。The researches including discharge capacity, pressare properties, cavitation characteristics at some key positions, hoisting load of the gate, configuration of energy dissipator at the exit dentated - sill, and downstream scouring were performed by hydraulic model tests
藉助系列水工模型試驗對水布埡放空洞的泄流能力、壓力特性及關鍵部位的空化特性、閘門啟閉力、出口鼻坎消能工體型及下游沖刷等進行了較深入的研究、分析。The dynamic - instability of radial gate was always due to the instability of arm under dynamic loading action, the security of gate spillway was dominated by the dynamic stability of arms
摘要弧形閘門的動力失穩往往是由於支臂在動力荷載作用下喪失動力穩定的,支臂的動力穩定與否控制著整個水閘的泄洪安全。Abstract : using a series of model tests, the properties of discharge capacity in the closed conduit due to inflow in gate shaft is studied and a method for estimating reducing discharge capacity is provided to designers
文摘:通過系統模型試驗,研究了泄水道因進口閘門井進水減小泄流能力的特性,並提出了估算方法,可供設計應用。According to the comparison of many alternatives, the repair scheme of the releasing tunnel adopted the alternative of installing temporary sealing gate to form dry land construction conditions so that the repair scheme has been completed smoothly
泄空洞修復工程,經多種方案比較,最終優選水下安裝臨時封水閘門,形成旱地施工條件,完成了檢修工程。A curved floodgate to release floodwater is one of the important equipments of the hydroelectric power plant. the outdated measuring apparatus of the floodgate ' s opening has low precision and reliability
弧形泄洪閘是水電廠的重要設備之一,老式的閘門開度測量儀的測量精度低,可靠性差。The different drawbacks in the original design and construction of the emergency gate slot of the releasing tunnel of zhelin hydropower station in jiangxi province resulted in the disjunction of most slot corner plates under the parapet walls of two sides of the left hole and the damage of the second - phrase concrete in these slot corner plates, after the gate is closed and under the action of seepage water pressure
江西省柘林水電站泄空洞檢修門槽,由於原設計和施工均存在不同的缺陷,致使閘門關閉后,在滲透水壓作用下,造成左孔兩側胸墻以下大部分門槽護角板被擠壓脫開,護角板裏面的二期混凝土損壞。The flow regime inside of the tunnel, the characteristics of hydrodynamic load, the hydrodynamic pressure feature at the gate slot and the vent air speed during the shutting of the gate is studied through model test, and then the reliability of the gate, the feature of the vent air speed and the pressure at the gate slot during the shutting of the gate are analyzed based on the test result concerned
通過模型試驗研究了事故閘門關閉過程中泄洪洞內的水流流態、門體的水動力荷載特性以及門槽段動水壓力特性、通氣孔風速,並根據試驗結果分析了該閘門動水下門過程中的可靠性,通氣孔風速特性和門槽段壓力特性。The spillway tunnel at xiluodu hydropower station has the characteristics of large discharge and high flow velocity, for which the hydraulic characteristics of the emergency gate and the dynamic properties of gate structure during shutting down under hydrodynamic condition are directly related to the technical feasibility and the safety reliability of the spillway tunnel operation
摘要溪洛渡水電站泄洪洞具有泄量大、流速高等特點,事故閘門動水下門過程中的水力學特性以及門體結構的動力性能直接關繫到泄洪洞運行的技術可行性和安全可靠性。分享友人