泄水閘 的英文怎麼說

中文拼音 [xièshuǐzhá]
泄水閘 英文
discharge sluice
  • : Ⅰ動詞1 (液體、氣體排出) let out; discharge; release 2 (泄露) let out (a secret); leak (new...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : anchor gate
  • 水閘 : water gate; water lock; penstock; dam; sluice; pen; sasse; canal-lock
  1. Certain possible inventions of which he had cogitated when reclining in a state of supine repletion to aid digestion, stimulated by his appreciation of the importance of inventions now common but once revolutionary for example, the aeronautic parachute, the reflecting telescope, the spiral corkscrew, the safety pin, the mineral water siphon, the canal lock with winch and sluice, the suction pump

    當吃飽后,為了助消化而仰臥著時,他曾思考過幾項發明的可能性。這是由於認識到如今雖已司空見慣當初卻曾是巨大革新的那些發明的重要性,從而受到刺激:比方說,航空降落傘反射望遠鏡螺絲錐別針瓶裝礦泉運河那有著絞車與道的門裝置抽機。
  2. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河庫供工程取頭部由引渡槽、節制、進泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上要求,對其過流能力也要經試驗確定,為碧流河庫增建旁通管設計提供依據。
  3. " if we hadn ' t opened the discharge gate, the dam might have overflowed and the losses would have been much more serious, " he added

    他還說: 「如果我們不開,那庫區的就會溢出大壩造成更嚴重的損失。 」
  4. In an actual case of the numerical modeling on the flood of both the north branch and the mid - downstream of daqing river in haihe river hasin, the flood is simulated with one - dimensional model, in which flood regulation of the retarding basin, the discharge gate control and the infiltrations of the northern rivers are considered

    在海河流域大清河北支及中下遊河道洪數值模擬的實際工作中,應用了一維河網模型進行洪的模擬計算,並根據實際情況加入了蓄滯洪區調度、控制調度以及近年來北方河道入滲的特點等條件,計算效果良好。
  5. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟的加速發展及西部大開發戰略的實施,我國電事業也迎來了迅猛發展的大好時機,一批高壩電站正在建設或規劃之中,其建築物孔口及頭愈來愈大,常規混凝土或鋼筋混凝土墩結構難以承受如此之大的推力作用,隨著預應力技術的成熟,這一技術已成為解決該問題的關鍵技術措施之一。
  6. Reconstruction of supervisory control for release floor water in wanan hydropower plant

    萬安電廠監控改造
  7. The dynamic - instability of radial gate was always due to the instability of arm under dynamic loading action, the security of gate spillway was dominated by the dynamic stability of arms

    摘要弧形門的動力失穩往往是由於支臂在動力荷載作用下喪失動力穩定的,支臂的動力穩定與否控制著整個洪安全。
  8. Reinnovation of erjiang discharging sluice automatic monitoring system at gezhouba project

    葛洲壩二江泄水閘自動監測系統更新改造
  9. Discharge calculation and experimental for plain sluice

    平原流能力計算與試驗
  10. Abstract : using a series of model tests, the properties of discharge capacity in the closed conduit due to inflow in gate shaft is studied and a method for estimating reducing discharge capacity is provided to designers

    文摘:通過系統模型試驗,研究了道因進口門井進減小流能力的特性,並提出了估算方法,可供設計應用。
  11. Computerized supervisory and control system for discharge sluice in feilai gorge hydraulic project in guangdong

    飛來峽利樞紐工程泄水閘計算機監控系統
  12. The pier room being a sophisticated spatial structure system, conventional methods in material mechanics and structure mechanics find difficulty in describing the real burdening situation, which presents embarrassment in designing

    泄水閘室屬於一種復雜的空間結構體系,傳統的材料力學,結構力學方法難以真實的反映其受力狀態,必然給設計工作帶來一定的困難。
  13. Abstract : the computerized supervisory and control system for dischargesluice in feilai gorge hydraulic project in guangdong province is introduced, and the hardware and software design and the functions of this system are presented

    文摘:介紹了廣東省飛來峽利樞紐工程泄水閘計算機監控系統,並對該系統的硬體設計、軟體設計進行了描述,同時對該系統的功能進行了介紹
  14. Intelligent control of sluice gate in the reservoirs using transducer

    用變頻器實現的智能控制
  15. Application of polymer silicon powder mortar in reinforcing the floodgate project of longfengshan reservoir

    聚合物硅粉砂漿在龍鳳山工程加固中的應用
  16. According to the comparison of many alternatives, the repair scheme of the releasing tunnel adopted the alternative of installing temporary sealing gate to form dry land construction conditions so that the repair scheme has been completed smoothly

    空洞修復工程,經多種方案比較,最終優選下安裝臨時封門,形成旱地施工條件,完成了檢修工程。
  17. Concrete construction temperature control for water discharge culvert of tgp ' s shiplock in summer season

    三峽船箱涵夏季混凝土施工溫度控制
  18. The unavoidable flooding of villages occurred when authorities opened sluice gates at a dam on guangdong ' s hanjiang river because water there was building up to too high a level, it said

    報道稱,由於廣東韓江位過高,當地政府開啟了一座壩的,從而不可避免地淹沒了這些村落。
  19. A curved floodgate to release floodwater is one of the important equipments of the hydroelectric power plant. the outdated measuring apparatus of the floodgate ' s opening has low precision and reliability

    弧形電廠的重要設備之一,老式的門開度測量儀的測量精度低,可靠性差。
  20. Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier

    本文結合黃河小峽電站預應力墩這一工程實踐,採用國際上已成熟的有限元方法,合理地建立了預應力墩的三維有限元模型,該模型可方便地按預應力錨索的點位施加錨索預張拉力,考慮了可能發生的多種荷載工況組合,並與無預應力墩結構進行了對比分析研究,指出其預應力效果是明顯的,可以大大改善墩結構的受力狀態,通過三維有限元分析,還得到了胸墻簡支、固端不同情況下的應力成果和各荷載下的位移成果,這些成果的取得對預應力墩的設計具有一定的指導和參考價值。