泄流河 的英文怎麼說

中文拼音 [xièliú]
泄流河 英文
exit stream
  • : Ⅰ動詞1 (液體、氣體排出) let out; discharge; release 2 (泄露) let out (a secret); leak (new...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  1. The upper of the east model boundary remains constant head and the at the lower of it, there might exists a diffluent interface. so the east and west sides of the diffluent interface are respectively the drainage area of east and west karst - groundwater of yellow river

    模型東界上部以黃水位為第一類水頭已知邊界,下部必存在一個分面,分面東西兩側分別是黃東西兩塊巖溶水的排區,該分面可視為零量邊界。
  2. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與水要求,對其過能力也要經試驗確定,為碧水庫增建旁通管設計提供依據。
  3. Could there exist another possibility for the south boundary of the system as follow : the rainfall infiltrates in the outcrop carbonate - mountain area of western, and moves towards south and deeper along carbonate rocks, then moves upper through the overlain tertiary system ( n ) with a thickness of 400m ( instead of running off to the springs and yellow river through a long approach of least hydraulic gradient ), and then mainly transforms into the horizontal drainage in the loess layer of quaternary, finally drains in lu - botan depres sion

    並且提出,關于對系統南界的認識,是否存在另一可能:即在西部碳酸鹽巖裸露區大氣降水入滲后,沿碳酸鹽巖向南向深部運動,然後,並非在極小的水力坡度驅動下長距離地向東部黃、泉群徑,而是通過上覆厚度約400m的第三系向上運動,繼而主要在第四系黃土層中轉為向南水平排到鹵泊灘。
  4. In an actual case of the numerical modeling on the flood of both the north branch and the mid - downstream of daqing river in haihe river hasin, the flood is simulated with one - dimensional model, in which flood regulation of the retarding basin, the discharge gate control and the infiltrations of the northern rivers are considered

    在海域大清北支及中下遊道洪水數值模擬的實際工作中,應用了一維網模型進行洪水的模擬計算,並根據實際情況加入了蓄滯洪區調度、洪閘控制調度以及近年來北方道入滲的特點等條件,計算效果良好。
  5. If the project proceeds as planned, toxic oil will move from offshore platforms through an earthquake zone and down and 800 - kilometer pipeline that crosses 24 active seismic faults and more than 200 wild salmon spawning rivers and tributaries

    如果該項目順利進行,有毒的油氣將通過一個地震帶從海上平臺露出來,同時一條800公里長的管線將穿越24個地震多發帶,超過200條及其支,而這正是野生大馬哈魚的產卵地。
  6. For the low water head water control project at a branching channel, its flood discharge capacity is related not only with the total discharge width but also with the discharge width ratio of the two branches

    摘要位於分汊段的低水頭樞紐,其洪能力不僅與樞紐的總寬度有關,而且與兩汊寬度之比有關。
  7. The paper discusses the methods of multi - objective ecological operation of reservoirs, which covers the establishment of legislation systems ; water demands for the basic ecological functions of downstream river channel ; reservoir discharge patterns simulating natural hydrological regimes ; regulation and control of sedimentation and eutrophication of reservoirs ; mitigation of the influences by water temperature stratification ; the operation techniques in pollution prevention and connectivity reinforcement of water systems

    文中討論了水庫多目標生態調度的方法,包括建立相應法規體系;保證維持下遊道基本生態功能的需水量;模擬自然水文情勢的水庫方式;進行水庫泥沙調控及水庫富營養化控制;減輕水體溫度分層影響;進行防污調度以及增強水系連通性等方面的調度技術。
  8. Many geological and hydrological factors of the river section, where the yellow river water intake engineering is laid out, such as the capacity of the reservoirs along the river section upstream and downstream, the rate of the flow discharge, the erosion and silt of the watercourse, the form of the riverbed and the water current, ice tuck, the convergence of the upstream branches of the river section, flood crest, sand crest size, the capacity for flood discharge of the watercourse, the effect of flood control structure around and the impacts on surrounding environment and the third person " s legitimate rights and interests, should be considered

    取水工程的布設要考慮工程所處段的地質水文等諸多因素。如該段上下游水庫的庫容,量、道沖刷、淤積、床形態、水形態、冰塞、段上游的支匯入、洪峰、沙峰的大小、道行洪能力的大小、周圍防洪工程的影響及對周圍環境和第三人合法權益的影響等等。
  9. Analyses show that, when the ratio of the two branches ' discharge widths is coordinated with the resistance ratio of the two branches, the project reach has the least resistance, that the discharge capacity is the largest and that its influence on the project reach is less after the finishing of the project

    通過分析,當兩汊寬度之比與汊道兩汊阻力比相協調時,樞紐段的阻力最小,其洪能力達最大,且樞紐建成后對樞紐段的影響也較小。
  10. The huge runoff in the flood season had badly endangered the lives and fortunes of over 2000 million residents in downstream region of huaihe river

    下游洪水出路歷來不足,在洪水季節,下量激增,嚴重危及淮下游地區2000多萬人民的生命和財產安全。
  11. The groundwater, flowing towards east, outflow a part in yuan jiapo and wentang spring aside luo river, and the rest majority completely drain in the bottom glade of yellow river and its nearby springs - mafen and chunv spring

    這股東的地下水,在洛袁家坡和溫湯泉排一部分地下水,最終全部排到本區最低排點? ?黃及其附近的馬瀵泉和處女泉等。
  12. Various computational examples are presented in the paper for different cases, such as simultaneous routing of main and branch streams, routing of dam - break flood, computation of simultaneous outflow from dam, flood calculation in watercourse with multiple branch steams, and computation of the hydraulic grade line in the reservoir

    論文針對不同條件分析了干支同時演進計算、潰壩洪水計算、干支大壩洪對下游的影響、多支道演算和庫區水面線的計算。
  13. Finally, taking the panjiakou reservoir in the haihe river basin in china as an example, the paper analysis the reasonable adjustment scheme of the limited level of the reservoir during the flood season according to the design flood, the flood forecasting, the flood control operation under forecasting, the flood control standard of upstream and downstream of the reservoir, the immigrants range, and the benefits and the risk of the reservoir in a long period of the operation simulation

    最後以海域潘家口水庫為分析實例,從設計洪水、預報預、洪水預報調度方式、上下游防洪設計標準、上游移民淹沒及土地退賠線、水庫長期運行的風險和效益等多個方面分析論證了水庫汛限水位的合理調整方案。
  14. Discharge pipes directly take pollutants away from the plant into the river

    管道直接將污染物從工廠排入
  15. ( 5 ) by analyzing the terrace in the lacustrine sediment of the ancient barrier lake, diexi, minjiang river, forming of the terrace is not only because of the intermittent arising of the tectonic movement, but also because of descend of the eroding normal covering resulting from destroying of the barrier lake

    ( 5 )通過對岷江疊溪古堰塞湖湖相沉積中的階地分析可知,階地的形成不僅僅是由於新構造運動的間歇性抬升作用,由於堰塞湖的潰決引起洪水下,導致侵蝕基準面的下降也可以形成階地。
  16. The result show that the position of free surface is higher because of frusta of brake, especial obvious in the head of frusta of brake ; flux coefficient and pressure on dam are quite influenced by type of frusta and 3 a type frusta of brake relative to 2 type frusta of brake has bigger flux coefficient and smaller pressure on dam ; obvious influence of ability of discharge flow for different ratio of thickness of frusta and breadth of brake and pressure on dam reduces with increasing ration of thickness of frusta and breadth of brake, while bigger flux coefficient is obtained when tlb = 0. 2

    結果表明,閘墩海大學博士論文的存在抬高了水面線的位置,其中在閘墩頭部尤其明顯;墩型對量系數和壩面壓力影響較大, 3a型閘墩相對於2型閘墩具有更大的量系數和更小的壩面壓力:不同的墩厚閘寬比t / b對能力也將產生顯著的影響,隨著墩厚閘寬比的增加,壩面壓力降低,而當t / b二0 . 2時溢壩具有更大的量系數。
  17. Jahezi reservoir is located at the northwest arid area of china, the primary tasks of which are flood control land irrigation. it has been reinforced in 2003 so the discharge capacity and the safety of dam were increasing at large degree, which created the conditions to utilize the flood sufficiently by raising the limited water level

    子水庫地處我國西北乾旱區,主要承擔防洪及灌溉任務, 2003年除險加固完成後,水庫的能力及大壩安全都有很大程度的提高,為水庫抬高汛限水位,實現洪水資源化創造了條件。
  18. As a result, a portion of the dirty water is eventually released into rivers or the sea via storm water spillways or pumping stations

    然而,這種方式在暴雨時會導致一部分被稀釋的污水經過洪口或抽水站,注入到或海洋。
  19. Discussion on characteristics of runoff and sediment with discharging capacity of hyperconcentration river reservoir - from the case of reinforcement of bajiazui reservoir

    從巴家嘴水庫除險加固談來水來沙特性與多沙水庫規模論證
  20. Using flood progress model and the different discharge of feilaixia reservoir, we can calculate in time the water level and discharge of middle - lower reaches of beijiang, thus increase the accuracy of flood forecast and provide the important technical support for the further research on the optimal dispatch method of f lood control system

    其中依據水文學和水力學相結合的洪水演進模型,可根據飛來峽水庫不同的下量,及時計算北江中下遊道的水面線和下量,提高了洪水預報的精度,為進一步研究防洪體系優化調度方法提供極其重要的技術支撐。
分享友人