泥壩 的英文怎麼說

中文拼音 []
泥壩 英文
mud bar
  • : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  1. I am sgn, silly, silly enough as a mule. gutty, gutty enough to dig into what i doubt. nice, nice enough to be your pal

    這就是「符合中國國情的」 。 。 。不過?我是喜歡這個水的?以後能見到小河每天都有水?總比見到那些污的好。
  2. So as the enter point of the stream, the income of the reservoir, the time of the flood peak lasted, the quantity of sandiness income and the strobe of the darn. we must do some work to forecast and watch the different density stream. by experiments, we made out that it is impo rtant for us to reduce the water lever in work of the river belongs lots of sandiness

    從異重流試驗看,在正常運用下,水庫產生沙異重流的機率較大,能否運動到前排出庫外,還要看異重流潛入點位置、入庫流量、洪峰歷時、入庫含沙量、水庫閘門運用等因素,需要做好異重流預報監測工作。
  3. The yanchang formation is divided, for the first time, into six third - order sequences, each with an average time duration of about 4. 5 ma. the single sequence is composed of deltaic and lacustrine sandstones, siltstones and mudstones. the subaerial and subaqueous distributary channel and channel - mouth bar sandstone reservoirs are well developed mainly in the lowstand and highland systems tracts

    論文在富縣探區首次應用陸相層序地層學的觀點和方法,把延長組劃分為6個三級層序,平均時限4 . 5ma ,各層序由三角洲與湖泊相砂、巖沉積組成,主要在低位體系域和高位體系域發育水下(上)分流河道和河口砂砂巖儲層
  4. The aswan dam, for example, stopped the nile flooding but depried egypt of the fertile silt that floods left - all in return for a giant reseroir of disease which is now so full of silt that it barely generates electricity

    例如,阿斯旺大使得尼羅河不再洪水泛濫,但是它也奪去了埃及以前所享有的洪水留下的肥沃淤- -這些換宋的就是這么個疾病滋生的水庫,現在這個水庫積滿了淤,幾乎不能發電了。
  5. The aswan dam, for example, sto ed the nile flooding but deprived egypt of the fertile silt that floods left - all in return for a giant reservoir of disease which is now so full of silt that it barely generates electricity

    例如,阿斯旺大使得尼羅河不再洪水泛濫,但是它也奪去了埃及以前所享有的洪水留下的肥沃淤- -這些換宋的就是這么個疾病滋生的水庫,現在這個水庫積滿了淤,幾乎不能發電了。
  6. The aswan dam, for example, stopped the nile flooding but deprived egypt of the fertile silt that floods left - all in return for a giant reservoir of disease which is now so full of silt that it barely generates electricity

    例如,阿斯旺大使得尼羅河不再洪水泛濫,但是它也奪去了埃及以前所享有的洪水留下的肥沃淤- -這些換宋的就是這么個疾病滋生的水庫,現在這個水庫積滿了淤,幾乎不能發電了。
  7. The aswan dam, for gwymple, stopped the nile flooding but deprived egypt of the fertile silt that floods left - all in return for a giant reservoir of disease which is now so full of silt that it barely generates electricity

    例如,阿斯旺大使得尼羅河不再洪水泛濫,但是它也奪去了埃及以前所享有的洪水留下的肥沃淤- -這些換宋的就是這么個疾病滋生的水庫,現在這個水庫積滿了淤,幾乎不能發電了。
  8. The aswan dam , for example , stopped the nile flooding but deprived egypt of the fertile silt that floods left ? all in return for a giant reservoir of disease which is now so full of silt that it barely generates electricity

    例如,阿斯旺大使得尼羅河不再洪水泛濫,但是它也奪去了埃及以前所享有的洪水留下的肥沃淤? ?這些換來的就是這么個疾病滋生的水庫,現在這個水庫積滿了淤,幾乎不能發電了。
  9. The author presume the original physiognomy of jiuzhai valley, and acknowledged changhai valley was a surface - water with uniform waterpower, the rize valley was a branch of it but the inequality rise of lithosphere, the deposit of earthquake landslides debris flows and falling or glacier blocked the river - way, furthermore, the flow water with high content of ca ( hco3 ) 2, so tufa dyke formed and evolvement the present dyke of lakes the present physiognomy formed on the base of those 2

    由於地震、滑坡、石流引起的堆積物和冰川作用形成的冰磧物堵塞河道,再加上構造運動造成地殼的不均勻抬升,九寨溝的這種獨特的地質環境以及高含ca ( hco _ 3 ) _ 2的巖溶水流作用下,為caco _ 3沉積創造條件,沉積的caco _ 3加高、連接最終形成灰華堤,使湖泊的形成成為可能。
  10. They were beating bowls with chopsticks loudly, treading over mud and water, and scouring southward across the courtyard to the foot of one row cave - houses which served as the office of general services

    他們把碗筷敲得震天價響,踏帶水、叫叫嚷嚷地跑過院,向南面總務處那一排窯洞的墻根下蜂湧而去。
  11. The characteristic of chemical grouting material should combind with construstion method directed by the theories, it is necessity guarantee for the good result in some special cases. by cw series material, various complicated engineerings have been successfully handled, such as the treatment of concrete fine cracks in three gorges project ( tgp ), foundation reinforcement to the fault in in three gorges project ( tgp ), and the seepage control and reinforcement for the dam base of jiangya hydropower - station. these illustrations are provided to proof the advantages of modified epoxy resin and its technique

    化灌材料特性與理論指導下的灌漿工藝的全面結合是化灌處理,特別是特殊條件下灌漿效果的必要保證, cw系改性環氧化灌漿材及技術對多種復雜工況工程處理對象成功處理,解決了三峽混凝土微細滲水裂縫防滲補強、三峽工程地質斷層化夾層加固以及江埡電站基溶蝕帶防滲等一系列工程技術難題,印證了該材料及技術的先進性。
  12. There is an old saying in our field - " no dam is not crackable ". the crack is mainly because of the bad dilation after " alkali - aggregate reaction ", the temperature traverse inside and outside the concrete with the happening of heat evolution and the shrink of volume due to the cooling of concrete

    水電行業有句「無不裂」的俗話,產生裂縫的原因主要有「堿集料反應」造成的破壞性膨脹,水水化過程中放出的熱量出現的混凝土內外溫度梯度和水石硬化後由於後期降溫發生的體積收縮等造成。
  13. And the delta genetic unit includes distributary channel, distributary bay, small lake of delta plain, swamp, distributary estuary bar, frontal delta mud and sandy density flow and so on. the fluvial system is composed of channel, channel side and flooding basin

    其成因相包括分流河道、決口扇及決口河道、分流間灣、三角洲平原小型湖、沼澤、分流河口、前三角洲及砂質重力流等;該區河流體系由河道、河道邊部及泛濫盆地等沉積組合構成。
  14. Field investigations found that epigenetic reworking deformation fracture include 3 types, named normal relief fracture, fracture filled mud and epigenetic reworking of disturbed belts. and epigenetic reworking of rock mass structural also includes gradual deformation of the blocks that are made up of different attitudes structural planes besides normal relief. through field geological investigations, the features of rock mass structural planes are generalized, especially development laws of interlayer shearing belts, instrastratal shearing belts, faults and base crack

    在已有研究成果基礎上,總結了區玄武巖的巖相特徵和構造應力場對巖體結構的影響;通過現場調查,總結了3種類型淺表生變形破裂,即正常卸荷型破裂、鬆弛夾型破裂和緩傾角錯動帶表生改造;通過野外地質調查,總結了層間錯動帶、層內錯動帶、斷層和基體裂隙的發育規律。
  15. Terraces on slope land delete the conditions of causing soil and water loss. ponds, cistens, water cellars enhance surface water use efficiency, warping dams can store flood, decrease flood peak, retain sediment, and conserve water

    坡地修梯田消除了產生水土流失的條件,蓄水池、旱井、水窯提高了對地表水資源的利用率,淤地具有蓄洪水、削洪峰、攔沙、涵養水源的作用。
  16. The cement grouting applied in seepage control and stabilization of cement - rubble stone dam in jinjiang reservoir

    灌漿在錦江水庫漿砌石防滲加固中的應用
  17. Some critics believe sedimentation is growing at a faster rate, which could eventually make the dam unable to contain a flood crest

    不過有意見認為,沙淤積的速度在加快,並最終會導致大無法承受洪峰。
  18. The beaver dammed the stream with mud, branches and leaves

    海獺用土、樹枝和樹葉在河裡築水
  19. Distribution law of deposits dry bulk density and its application in sediment restoration of check - dam

    地淤積物干容重分佈規律及其在層沙還原中的應用
  20. The whole project comprised the building of the dam, a 2, 428 - yard tunnel driven through the wong nai chung gap valley and a 5, 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road. each day the volume of water being conveyed reached 7 million gallons. the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3, 245 sq

    除水外,其他配套的工程包括: (一)一條長達2 , 428碼、貫穿黃涌峽谷的隧道; (二)一條長5 , 500碼的引水道,可連接水塘隧道的亞賓尼濾水池及配水庫,該引水道用石及磚砌成,每天可輸水700萬加侖; (三)位於亞賓尼水渠東部的六個過濾池,該濾水系統面積廣達3 , 245平方碼,深30尺,每天可過濾570萬加侖水,原水過濾后,經一條直徑18寸鐵水管,流入花園道與寶雲道交界的配水庫。
分享友人