泥沙工程學 的英文怎麼說
中文拼音 [níshāgōngchéngxué]
泥沙工程學
英文
sediment engineering- 泥 : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
- 沙 : 沙動詞[方言] (搖動以清除雜物) shake
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 程 : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
- 學 : Ⅰ動詞1 (學習) study; learn 2 (模仿) imitate; mimic Ⅱ名詞1 (學問) learning; knowledge 2 (學...
- 泥沙 : [地] silt; sediment
-
The improved scheme can ensure the south branch to be open to navigation and the flow here not to be broken in low water seasons, and it will have active effect on protecting the south branch and fuyuan town. this study is an attempt of applying three - dimensional mathematical model in analogue calculation and analysis of flow, sediment and riverbed movements in a long river reach. it is very important for the future thorough research, and has great significance for promoting the application of the three - dimensional model to resolve
本研究是三維數學模型對較長河段水流、泥沙、河床運動模擬計算分析的一次嘗試,其對今後進一步深入研究和應用三維模型解決工程實際問題,完善模擬方法、提高模擬水平,真正發揮數學模型其省時、省力、靈活方便和模擬細膩等在研究水沙運動規律和河床變形等方面研究中優勢具有重要的意義。Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method
研究認為: ( 1 )黃河河口口門逕流潮汐區域並非持續保持淤積狀態,在特定的來水來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從河口泥沙沉積分配的過程來看:三角洲與濱海區泥沙的沉積變化趨勢是基本一致的,各部位的泥沙沉積比例變化基本呈波動狀態,且三角洲與濱海區泥沙的沉積比例與來沙量密切相關,基本成正比關系; ( 3 )在口門處,影響泥沙沉淤的因素主要集中在潮汐頂托、口門逐漸加寬、河口門分汊、鹽水造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文分漢對河道淤積的影響進行了定量分析: (一扣根據實測資料首次建立了河贖流路泥沙沉積分配的回歸計算式,據此可以預估計算河口不同區域泥沙的沉淤量; 、 5 )本項研究首次論證了河口三角洲岸線動態平衡的概念,並建立了黃河河口來沙量與造陸面積的相關關系,得出了當河口多年平均來沙量維持在3 . 45億t時其河口三角洲岸線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了河口泥沙優化調控的概念,並對其宏觀優化調控模式進行了初步探討。Speciality in consultation field : research, design and supervision for sediment engineering in rivers, harbors and waterways, inclusive of river processes, flow and sediment motion, flood control engineering, selection of harbor location, navigation training works, bridge, and water supply projects, etc
從事河流治理和港口航道方面的泥沙工程科學研究和設計、監理工作,包括河道演變和水流泥沙運動規律、防洪工程、河港選址和航道整治工程、橋梁和取水工程等方面。Coastal and estuarine engineering, layout and planning of harbours and navigation channels ; river training, siltation prediction and its measures ; mathematical model computation and physical model experiments
海岸河口工程、港口航道總體布局規劃、河道整治、泥沙淤積的預測和對策、數學模型計算和物理模型試驗研究。Due to issues of dongting lake districts flood composition, the evolution of sediment flow, the river and lake ( r & l ) distribution characteristic as well as the layout of r & l - dredging engineering, the article simulated the model of the dongting lake terrain change by using the gis technology and adopted the limited volumetric method to establish the two - dimensional hydraulics computation model of lake in order to forecast the water level, the flow capacity, the speed of flow and changes of flow field after implemented the project, which have provided the reliable theoretic basis for the decision - making and implementation of renovation for river course, canal and harbor and river course - dredging engineering
摘要針對洞庭湖區的洪水組成、水流泥沙演變、河道湖泊水系分佈特點以及河道湖泊疏浚工程布局情況,利用gis技術模擬洞庭湖地形變化,採用有限體積法建立了湖泊二維水力學計算模型預測疏浚工程實施后的水位、流量、流速流場變化,為河道、航道港口整治、河道疏浚清淤等工程決策與實施提供了可靠理論依據。Aiming at the 28km long river regulation and protection works on fuyuan reach where the river evolutions are complicated and the dimensions of control works are difficult to calculate, this dissertation is to study three - dimensional numerical analogue not only under natural conditions but also under ten regulation schemes, using the river sediment quasi - two - dimensional model associated with the river sediment plane two - dimensional model and the river three - dimensional model
針對江道演變復雜,工程布局及控導工程結構尺寸難以計算的撫遠28公里長江段的防護整治工程,按天然情況和10個不同整治方案利用河流泥沙準二維數學模型、河流泥沙平面二維數學模型和河道三維水流數學模型結合進行三維整體的數值模擬。Finished the following important consulting projects in recent years : ( 1 ) to take charge of and participate in the design of the project of 25 thousand - ton petrol and gas quays of the jiangyin petrol company. ( 2 ) to take charge of and parricipate in the design of the project of 25 thousand - ton petrol and gas quays of zhang jia gang hada company. ( 3 ) to organize the feasibility study on the coastal engineering test hall construction project of nhri. to take charge of and participate in the design of the hall ( a large - size wave basin, 70m long and 50m wide. was constructed in it ). ( 4 ) to organize the project feasibility study of the laboratory of nhri for the basic law research on sediment transport, to take charge of the design of the project, and to participate in the design of the wind and wave flume ( 180m long ), in which the scientific research projects of waterway training works and coastal engineering structures can be carried out under the combined action of wind, wave and current
近幾年來主要完成以下幾項重大工程: 1 .主持並參與江陰石油公司2 . 5萬噸級油氣碼頭的設計; 2 .主持並參與張家港哈德公司2 . 5萬噸級油氣碼頭的設計; 3 .編寫了南京水科院海岸工程試驗廳可行性研究報告,主持並參與該試驗廳的工程設計,在該試驗廳內建有70米長50米寬的大型波浪水池; 4 .編寫了南京水科院「泥沙運動基本規律研究實驗室」工程可行性研究報告,並主持該項工程設計,參與完成180米長風浪水槽設計,該水槽建成后,可在風、浪、流綜合作用下進行航道整治和海岸工程的科學研究。The advances in the research on coastal disasters, coastal ecological environments, waves and currents, coastal sediments and morphological changes, and coastal structures in japan are introduced by summarizing the papers which were presented in the annual conference on coastal engineering in japan
摘要介紹了日本第52回海岸工學講演會的概況,從海岸災害、海岸生態環境、波浪與水流、海岸泥沙運動與地形變化、海岸建築物等5個方面綜述了日本海岸工程研究的進展情況。Estuary dynamics, regulation of navigation channels in estuary, and silt problems of harbours and navigation channels
長期從事河口動力學、河航道治理及港口航道泥沙的咨詢研究,曾為長江口、黃浦江、甌江等河口整治工程提供咨詢。On systematic analysis of engineering property of the aeolian sand, we choose cement stabilized aeolian sand, cement stabilized mixture of aeolian sand and soil, lime - fly ash stabilized aeolian sand, lime stabilized mixture of aeolian sand and soil and lime - cement stabilized mixture of aeolian sand and soil as object of research. on the base of the determination and analysis of temperature contraction property, aridity resistance property and strength of the stabilized aeolian sand mixture, this paper mainly analyses influential factors and inherent law of property about the stabilized aeolian sand mixture, and provides scientific foundation for the using of aeolian sand as paving material
本文在系統分析風積沙工程特性的前提下,以水泥穩定風積沙、水泥穩定混合沙土、石灰穩定混合沙土、石灰粉煤灰穩定風積沙和水泥石灰穩定混合沙土作為底基層材料研究對象,在對其溫縮、干縮以及強度和模量等性能指標的測試、分析的基礎上,研究分析了這些穩定風積沙混合料各性能的影響因素和內在規律,為風積沙用作沙漠地區公路路面材料提供了科學依據。Zhangxianming, male, was born in shandong on may 27, 1965, majors in the study of channel engineering, river dynamics, sediment engineering and hydrodynamic ; meanwhile, he has been teaching several related courses
張賢明,男, 1965年5月出生,主要研究方向為航道工程、河流動力學、泥沙工程及水動力學,承擔了多門相關課程的教學工作。2. calculating and analyzing the scouring and filling up of engineering across section by using two - dimensions water and sand mathematics model which is put forward in this paper. the result provides foundation for engineering designing
( 2 )提出利用二維水流、泥沙數學模型計算分析了在出現極端水情下,工程過江斷面沖淤的情況,為隧道穿越長江的軸線設計提供了依據。The paper will be based on a 2d tide current numerical model to analyze the change of tide current field and the influence of sand silt before and after engineering
本文從計算潮流入手,建立一個潮流數學模型來計算潮流場,分析工程建設前後潮流場的變化,並分析了工程前後泥沙回淤情況。At present, many fields remain to further research, especially the profound combination of gis technique with ece ( estuarine and coastal engineering ), which should be developed for the purposes as follows : ( 1 ) to serve the huge comprehensive work in changeable natural conditions and difficult construction conditions which takes a long period and covers a large region, e. g. the regulation work of deepwater channel in the yre ( yangtze river estuary ) ( 2 ) to combine the gis with applied numerical model ( 3 ) to study the hydrodynamic processes and characteristics of waves, tidal currents and sediment transport, as well as the affection carried by the regulation work in an estuary ( 4 ) to monitor and to analyze ees ( evolution of erosion and sedimentation ) and the variation of riverbed ( 5 ) to play a role of dynamic supervising of a engineering project
目前尚有許多有待進一步研究的領域,尤其是以服務于長江口深水航道治理這樣規模大、周期長、影響區域廣、自然條件復雜、施工情況多變的國家重點工程為目的,將gis與專業應用數學模型結合,對河口海岸波浪、潮流、泥沙運動的動力機制,以及整治工程建築物對其影響的研究,對入海航道沖淤和河勢演變的監測分析,對施工進展和工程效果實現「動態」監控和管理,尚缺乏同gis技術的深入有效結合。Now, we adopt the centrifugal separation to do with it, which is often a typical and complex industrial process because of the characteristics of non linearity, interactions between process variables and the lack of knowledge concerning their control, especially foundation of the relevant formulation of precise mathematics model
許多技術方法用於固液分離( sls )過程,但黃河泥沙分離過程作為典型的復雜工業過程,至今沒有一套完整有效的分離方法。此分離過程具有非線性、大時滯、時變、干擾大特點無法建構精確的數學模型。分享友人