注油堵 的英文怎麼說

中文拼音 [zhùyóu]
注油堵 英文
oil filler plug
  • : Ⅰ動詞1 (灌入) pour; irrigate 2 (集中) concentrate on; fix on; focus on 3 (用文字來解釋字句)...
  • : Ⅰ名詞1 (脂肪; 油脂) oil; fat; grease 2 (姓氏) a surname Ⅱ動詞1 (用桐油、油漆等塗抹) apply t...
  • : Ⅰ動詞(堵塞) stop up; block up Ⅱ形容詞(悶) stifled; suffocated; oppressed Ⅲ名詞1 [書面語] (墻...
  1. The chemical reaction happens when the solution of water soluble resin is filled into formation and generates water indissoluble material. the material will shut off the water channel

    將水溶性樹脂脂溶液入到層中,溶液發生反應,生成不溶於水的物質,塞水流通道,從而達到水的目的。
  2. Cement injection of perforating holes in a frozen pipe is a wholly - new technology for consolidating shaft wall rock and stopping water of frozen shafts in coal mines

    凍結管射孔漿是在對石井射孔技術和地面漿技術進行研究的基礎上,開發出的一種用於煤礦凍結井筒圍巖加固和水的全新技術。
  3. Abstract : cement injection of perforating holes in a frozen pipe is a wholly - new technology for consolidating shaft wall rock and stopping water of frozen shafts in coal mines

    文摘:凍結管射孔漿是在對石井射孔技術和地面漿技術進行研究的基礎上,開發出的一種用於煤礦凍結井筒圍巖加固和水的全新技術。
  4. Abstract : anchor packer is one of the important downhole tools which areused in oil production and waterflood technical operation, such as layer waterflood, layer fracture or acidation, mechanical water block. after anchor is fixed in the simulated test unit, the invasion depth of the casing can be known with the help of the sensor around the casing wall, and then the failure degree is concluded. this is very important for the anchor packer design and site operation

    文摘:在田開發中封隔器是實施機械採、分層水、分層壓裂或酸化、機械卡水等采工藝作業的主要井下工具之一,封隔器上的卡瓦是保證工作可靠性的重要元件,把卡瓦安裝在模擬試驗裝置中,通過在套管壁周圍分佈位移傳感器,測得卡瓦錨定后切入套管壁深度,判斷卡瓦對套管的損傷程度,這對封隔器的設計和現場使用具有十分重要的意義。
  5. The obvious effects have been made in the adjustment of injection to - producing and water blocking by applying comprehensively the log information of degree of saturation and profile - log and tracer survey information to tap the zone of enrichment of remaining oil potential, analyze the direction of injected water streamline and guide the measures for tapping potential in tuo 7 fault block

    摘要總結了坨七斷塊綜合應用飽和度測井資料、吸水剖面資料、水井示蹤劑資料,發掘剩餘潛力富集帶、分析水流線方向,指導井措施挖潛、采調整和水調剖工作所取得的明顯效果。
  6. The technique of water control for offshore oil field is made up of profile control technique and water shutoff technique which include necessity judgment of water control, type selection, volume calculation and injection technology of shutoff agent

    海上田控水技術由水井調剖技術和水技術組成,這兩項技術都由措施必要性判斷、劑選擇、劑用量計算和劑放置工藝等技術組成。
分享友人