泵水站 的英文怎麼說

中文拼音 [bèngshuǐzhàn]
泵水站 英文
pumping station
  • : 名詞(吸入和排出流體的機械) pump
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  1. Water system. water level indicator for water accumulator

    系統.位指示器
  2. Water system. gas shut - off valve for water accumulator

    系統.用氣閘閥pn 20mpa
  3. Water system. lowest level valve for water accumulator

    系統.用最低液面閥pn 20mpa
  4. Water system. water tank for water accumulator. type and size

    系統.箱.型式與尺寸
  5. The products can meet the require of oil field, chemical, electricity, mining, alchemic environmental and the field of municipal construction

    公司生產的類產品廣泛應用於石油和天然氣、電廠、核電、石油化工、化肥、供、廢處理、紡織等眾多領域。
  6. Main operating companies : one, quality brands imported power plant auxiliary equipment : including valves, pumps and transducer and thermocouple and actuators, measuring gauges, pressure switches, solenoid valve and ion exchange resins and other rights and the importation of water treatment packages instruments : online various instruments, laboratory instruments 3, chemical water treatment, electro - deionization ( edi ) 4. complete sets of equipment, installation, commissioning and maintenance

    公司主要經營: 1 、代理進口優質品牌電輔機設備:含閥門、類、變送器、熱電偶、執行器、計量儀表、壓力開關、電磁閥、離子交換樹脂等; 2 、代理進口處理成套儀器儀表:各類在線儀表、實驗室儀表; 3 、化處理、電除鹽( edi ) 4 、設備成套安裝、調試、檢修。
  7. District heating - hot or cold water and distribution networks - particularities of pumping stations

    地區供熱.冷或熱分配網路.特徵
  8. In the past 45 years, such policies are carried out toward water diversion project from yangtze to northern part of jiangsu province ( jswdp ) that province level finance bears the construction, operation, maintenance and reconstruction expenses, and power consumption of pumping stations enjoy preferential electrovalence

    摘要45年來,江蘇對江北調工程實行了由省級財政負擔工程建設、運行、維修和改造費用和用電享受優待電價的政策。
  9. The over 100 years old " red brick building ", which was the first water pumping station in the kowloon peninsula, preserved in the waterloo road yunnan lane project

    位於窩打老道雲南里重建計劃范圍內歷史逾百載的紅磚屋前身為九半島首個泵水站獲得保存
  10. In accordance with the characteristics of multi - units and high - lift pump station and the application to the actual project, the main pumping house and the auxiliary pumping house are arranged in combination with the intake pond, and then the understructure is integrated with the main pump house ; with which the working space is fully used with convenient management and investment saving

    摘要結合工程應用,針對多機組、高揚程離心的特點,將主副廠房及進池結合布置,下部結構與主廠房形成整體結構,既便於維護管理,又節省投資、充分利用空間。
  11. Rotation grid series : they are mainly used at water inlet, sewage and rainwater lifting pump stations, water inlet of sewage treatment plants, to prevent grass, wood, garbage and fibrous matters from entering water pumps and other devices behind so as to ensure the normal running of water pump and other equipments

    旋轉式系列格柵主要用於取口、污及雨的提升、污處理廠進口等處,用於阻擋草木、垃圾、纖維狀物質等雜物進入和后續設備,以確保及其它設備的正常運行。
  12. Construction and operation of a sewage pumping station with an average dry weather flow of about 12, 100m3 per day

    建造及營辦一個平均旱季流量約為每天12 , 100立方米的污泵水站
  13. A sewage pumping station with an installed capacity of more than 2, 000 m3 per day and its boundary is less than 150 m from the existing residential area

    裝置的能力超過每天2 , 000立方米,且界線與現有的住宅區相距少於150米的污泵水站
  14. The proposed 800 mm diameter salt water main is a pumping main to deliver sea water from the existing kowloon south no. 2 salt water pumping station to the existing yau ma tei salt water service reservoir. this serves to provide flushing seawater supply to south kowloon areas including the west kowloon cultural district scheme area

    建議的直徑800毫米的鹹管是干管,作用是把海由現有的九龍南二號海輸送至現有的油麻地海庫,從而為九龍南部地區,包括西九龍文娛藝術區的計劃區,提供沖廁用的鹹
  15. Guide for the procurement of power station equipment - hydraulic turbines, storage pumps and pump - turbines

    發電設備采購指南.輪機蓄輪機
  16. The results of site measurements give evidence that the numerically - controlled processed pump blades satisfy the requirements of designed characteristics

    並介紹在江蘇省江都第一抽更新改造工程中成功應用的實例,現場實測結果表明數控加工的葉片能夠保證設計性能。
  17. Engaged in the draft design and inspection of huaian 3nd pumping station, siyang 2nd pumping station, liulao jian pumping station and saji pumping station

    江蘇省淮安第三抽、泗陽第二抽、劉老澗抽、沙集抽四大的初步設計審查。
  18. Then it presents the control scheme. the whole control system composes of supplying water subsystem, purifying water subsystem, life sewage water subsystem, disposing waste water subsystem and rainwater pump room subsystem. every subsystem is a suit of absolute plc control system

    整個控制系統由鍋爐補給系統、凈系統、生活污系統、工業廢系統和雨房系統五個子系統組成,每個子系統都是一套獨立的plc控制系統,各個子系統的控製程序均採用modicon公司的concept2 . 5編程軟體編制。
  19. The paper is written by way of background as remote monitor system in tianshi pump station as well as my own factual labor fruit, in order to carry on discussing about research and construction of remote monitor system for large - scale pumping station. the paper mainly deals with five aspects : 1. describing problems existed now and trend in the future on remote monitor system for large - scale pumping station. 2. providing network integration project of constructing remote monitor system for large - scale pumping station

    本文是以田市抽遠程監控系統為背景,結合筆者實際工作成果所撰寫的,旨在對大型監控系統的建設進行研究與探討,全文主要涉及到以下五個方面: 1 、論述了大型監控系統目前存在的問題和今後發展趨勢; 2 、提出了組建大型監控系統的網路集成方案; 3 、提出了利用com 、 dcom 、 activex 、 opc組件技術實現各種監控系統之間的集成方案,並在田市抽實現閉路視頻監控網路、配網自動化網路和機組控制網路的無縫集成; 4 、進行監控系統通訊軟體分析與開發,實現監控系統與第三方設備通訊; 5 、結合大型一般特點,引入聚類融合控制,實現田市抽的機組優化控制。
  20. Analysis of relation between characteristics of pump - turbinerunner and transition of pumped - storage power station

    輪機轉輪全特性與蓄能電過渡過程的相關性分析
分享友人