洞室結構 的英文怎麼說

中文拼音 [dòngshìjiēgòu]
洞室結構 英文
alveolar texture
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • 結構 : 1 (各組成部分的搭配形式) structure; composition; construction; formation; constitution; fabric;...
  1. Taking loess cave dwelling of yan an area as represen t area , the annual temperature wave inside the cave dwelling are solved under t he annual temperature wave of outside disturbance in yanan furthermore , by comparing with that of bungalows , the characteristics that warm in winter and cool in summer in cave dwelling are illustrated in quantity

    以延安地區黃土窯為模型,以當地的外年溫度波為外擾,用反應系數法求解和分析了窯內的年溫度變化;並與相同空間,相同外擾作用下的平房作了分析比較,定量的說明了窯與平房相比具有冬暖夏涼的優點。
  2. This paper analyses the stress and deformation of the two lining structure types of the surge shaft surrounded with crush rock under the action of high water pressure by using fem, compares the two lining types ' s merits and demerits in stress, deformation, fracture state, the combining bearing of surrounding rock and lining structure, the safety and economics

    本文針對圍巖條件比較破碎,裂隙發育的調壓井洞室結構,就兩種襯砌型式分別進行了高水頭作用下的有限元數值模擬,從調壓井襯砌選型角度分析對比了兩種襯砌型式在圍巖及襯砌應力與變形、襯砌鋼筋混凝土開裂、圍巖與襯砌聯合承載、安全儲備、經濟等方面的優劣。
  3. The finite element analysis of 3d seepage field for surrounding rock mass of cavern groups of underground powerhouses was performed based on the nodal virtual flux method for solving the non - pressure seepage field and the improved drainage substructure technique for accurately simulating the complex seepage behaviors of densely distributed drainage holes, with emphasis placed on the seepage properties of the anti - seepage concrete curtain and drainage curtain in the anti - seepage and drainage system

    摘要在求解無壓滲流場點虛流量法的基礎上,合可精細模擬密集排水孔復雜滲流水力行為的改進排水子技術,付某地下廠房廠區群圍巖區三維滲流場進行了有限元求解分析,著重研究了防滲排水系統中的帷幕和排水幕的滲流特性。
  4. Inversion analysis of measured displacements is used extensively in geotechnical engineering, structural engineering, information construction, and trauma diagnosis, etc. in this dissertation, parameters identification of original geostress and medium physical property in cavern, slope, tunnel and dam are taken as a cut - in point. macroscale inversion analysis of displacements and numerical solutions of inverse problems of mechanics are researched profoundly. scientific theories of multiscale problems are connected with numerical inversion approaches

    本文以地下、邊坡工程、隧道工程與大壩等領域的初始地應力參數和介質物性參數識別為切入點,對宏觀尺度位移反演分析和力學反演問題數值求解方法進行了比較深入的研究,並將多尺度問題科學理論和反演數值方法聯系起來,初步探討了性承載材料(如巖石、骨材料等)的多尺度力學模型及其反演方法。
  5. Associated with a project of the planned xuefengshan tunnel with 7. 6 km long during the construction of shaoyang to huaihua expressway in hunan province of shanghai to ruili national trunk highway, this paper firstly makes an introduction of the frequently - used analysis & computation methods for tunnel supporting structure. then, based on the analysis of the basic theory about the interaction mechanism of surrounding rock and support structure, a spatial computation model is made, a coupling numerical computation method with 3 - d elastic - plastic finite element and infinite element is proposed, and a comprehensive analysis has been made to the effects of the overall stability and safety of the surrounding rocks of different characteristics, different classes and under different construction methods. and thus the problem of 3 - d infinite region to which applying the general finite ca n ' t do has been resolved

    6公里的雪峰山隧道工程,首先介紹了隧道支護的常用分析計算方法;然後通過對隧道施工過程中,穩定性與支護相互作用機理的深入分析,建立了隧道施工過程的空間計算模型,提出了採用三維彈塑性有限元-無限元耦合的數值計算方法,綜合分析了隧道在不同圍巖特性和圍巖類別條件下,以及不同施工開挖方案等對隧道圍巖整體穩定和安全性的影響,從而解決了通用有限元方法難以解決的隧道三維無限域問題;其可充分發揮有限元法在分析非線性方面的有效性和成熟性,以及無限元法在分析處理無限域和半無限域方面的精確性和簡便性,為隧道施工過程中圍巖的穩定性分析開辟了一條新的途徑。
  6. Considering the above reason, this paper, by the action - reaction model in the design theory of underground structure, and by fem, establishes an analysis frame based on the characteristics of the cavern - pile method. the influences of tunnel span, height, overburden depth, and excavation sequence on the cavern - pile method are discussed by a careful interpretation of the modeling result. in addition, a comparison of surface settlement and engineering quantity of the cavern - pile method with those of the binocular excavation method, bench cut method and cd method are made in the paper

    本研究主要是依據目前地下設計及計算理論中的地層法,以有限單元法為計算手段,針對淺埋暗挖樁法的自身特點確定了模擬分析方案,並通過計算果的處理和分析指出了跨度、高度、埋深、施工工序等因素對淺埋暗挖樁法的影響規律。
  7. Based on the simplified structure of rock mass, three - dimensional finite element numerical modeling technique is used to analyze systematically the distribution features of filed, strain field and plastic zone in the surrounding rock mass of the underground cavities after the excavation

    在巖體模型概化的基礎上,采有三維有限元數值分析方法,系統研究了大跨度、高邊墻地下群開挖完成後圍巖的二次應力場、變形場和塑性破壞區的變化特徵。
  8. Based on the experiment of full - sized cshb walls under lateral and vertical loads, initial crack - resisting stiffen formula was deduced by considering the influence of concrete beams, concrete core columns, structural columns, vertical pressure and window ( or door ). the results calculated from the formula were fit well with the experimental results. by the analysis of displacement at initial crazing, probability statistical mode and its parameters of relative displacement angle were presented

    在介紹和總本課題的內足尺寸單片墻抗側力性能試驗的基礎上,考慮了圈樑、芯柱、造柱和墻體正壓力、開門窗等因素對抗側剛度的影響,提出了綜合各種因素的初裂抗側剛度公式,與試驗果具有很好的一致性;合試驗的初裂位移分析,給出了層間相對位移角的概率統計模式及相應的統計參數,提出了小砌塊建築層間位移角的控制標準。
  9. And the main contents of this dissertation are : ( 1 ) the engineering geological features of discontinuities in surrounding rock mass were analyzed on the basis of field geological survey and the preferred orientation of the main discontinuities were derived. then the displaceable blocks distributing on the roof and sidewalls of main chamber were searched out taking the intersecting relationship of discontinuities into consideration. then the failure mode and the coefficient of stability of the displaceable blocks were studied respectively

    主要內容包括:在野外地質調查基礎上,通過統計分析得到地下廠區面的優勢方位;對面工程地質特性進行了分析;根據面的空間組合關系,搜索出可能在主廠房的頂拱和邊墻部位出露的塊體,並分析了各塊體的可能滑移方式及其穩定性系數。
  10. Based on the simplified structure of rock mass, flac ( superscript 3d ) numerical modeling technique is used to systematically analyze the distribution features of the secondary stress field, strain field and plastic zones in the surrounding rock mass of the underground cavities after the excavation

    摘要在巖體模型概化的基礎上,採用flac (上標3d )數值分析方法,系統研究了瀾滄江某大型水電站大跨度、高邊墻地下群開挖完成後圍巖的二次應力場、變形場和塑性破壞區的變化特徵。
  11. With the rapid development of the state highway construction, it becomes more and more important for the study of stability of peripheral surrounding rock and its forced condition of the structure during construction of railway or highway tunnels, especially of those long or extra - long tunnels

    隨著我國高速公路建設的高速發展,鐵路、公路隧道,特別是長大和特長隧道施工過程中周邊圍巖的穩定性與受力狀態的研究日益顯得重要。
  12. The captured droplets weight is regarded as evaluating indicator. experimental constants include : ambient temperature 281 - 288k, rh 9 % ~ 20 %, wind velocity 1. 4m / s and vertical to the spray fan

    內試驗比較了改進前後的罩蓋噴霧減少霧滴飄失的效果,並和常規無罩蓋噴霧對比。
  13. At the same time, the mechanics mode of newly - built structure is not the same as that single cavern is excavated in the half - unbounded space. its original stress field is disturbed by former time and time again, and once more by excavating of later. so the mechanics mode of the later is not symmetrical generally and infinite variability is put up

    同時新建物的受力模式也不同於半無限體或無限體中修建單一的一般狀況,其初始應力場往往是經過多次擾動的,其施工將再次進行擾動,使其受力往往是非對稱的,表現出極大的變異性。
  14. In this paper, based on simulation modeling laws of geometry, constitutive relations, stress conditions and construction, a simulative calculation model has been proposed by considering the mechanical problems during the underground chamber construction and adopting constitutive models of enveloping type which can consider elasto - plastic materials and their cracking. the model can describe rock multi - media characteristic consider the interrelation of shoring structure and stratum reflect some influencing factors, for example : faultage interlayer joints, construction process and so on

    本文合地下工程施工過程中的力學問題,基於幾何、本、應力狀態和施工過程等四方面模擬建模的原則,採用可以考慮材料彈塑性和開裂的包絡型本模型,建立能描述巖體多介質的特點和能考慮隧支護與地層的相互作用,同時能反映斷層、夾層、節理裂隙以及施工全過程等影響的巖體模擬計算模型。
  15. And it also can not give the exact appearance place. aiming at this question, basing on studying the underground cavity in laxiwa hydroelectric station, through establishing entity model, combining model, slicing model, and vector analysis, article introduce a method of analyzing the stability of block and get the certain search. all the graph result is showed in autocad, which is a graph software

    針對此問題,本文以拉西瓦水電站地下為研究場所,以autocad圖形軟體為平臺,建立地下面的實體模型,通過對實體模型的組合、剖切獲取面的頂及壁展示圖,再以面展示圖為基礎,應用矢量運算對塊體進行穩定性分析,並在autocad中顯示面展示圖和塊體展示圖。
分享友人