洞室跨度 的英文怎麼說

中文拼音 [dòngshìkuà]
洞室跨度 英文
grotto span
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  • : 動詞1 (抬起一隻腳向前或向左右邁) step; stride 2 (兩腿分在物體的兩邊坐著或立著) bestride; stra...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  1. Relating closely to the main problem of the high sidewall and wide span underground cavities excavation stability of xiluodu hydroelectric project, the evolution characters of geo - stress field in deep - cutting gorge and the whole features of the stress field, strain field and plastic failure zone around the underground chambers after excavation are studied systematically in the dissertation, based on a great deal of data gathered in field investigation and taking the flac3d v2. 0 software as basic computation tools. meanwhile, in the course of research, the new methods of dynamic numerical simulation are summarized and applied. furthermore, the effects of rock mass qualities, initial geo - stress field and excavation procedure on surrounding rock mass stability are discussed

    本文緊密結合溪洛渡水電工程大、高邊墻復雜地下廠房群,施工開挖過程中和開挖后圍巖穩定性研究這一重大課題,在詳盡的野外地質調查工作和對大量基礎地質資料的整理與分析基礎上,以目前國際工程地質界公認的最新通用軟體flac ~ ( 3d ) 2 . 0版作為基本計算工具,從整個壩區地應力場的研究開始,通過動態數值模擬分析這一新的模擬思路,系統地研究了深切峽谷區地應力場多階段的特徵和演變規律,進而對左、右岸地下廠房群開挖全過程中圍巖應力場、變形場和塑性破壞區的變化特徵,進行了全過程動態數值模擬研究,並詳細討論了圍巖質量、初始地應力場、施工開挖順序對大型地下群圍巖穩定性的影響。
  2. Considering the above reason, this paper, by the action - reaction model in the design theory of underground structure, and by fem, establishes an analysis frame based on the characteristics of the cavern - pile method. the influences of tunnel span, height, overburden depth, and excavation sequence on the cavern - pile method are discussed by a careful interpretation of the modeling result. in addition, a comparison of surface settlement and engineering quantity of the cavern - pile method with those of the binocular excavation method, bench cut method and cd method are made in the paper

    本研究主要是依據目前地下結構設計及計算理論中的地層結構法,以有限單元法為計算手段,針對淺埋暗挖樁法的自身特點確定了模擬分析方案,並通過計算結果的處理和分析指出了洞室跨度、高、埋深、施工工序等因素對淺埋暗挖樁法的影響規律。
  3. Based on the simplified structure of rock mass, three - dimensional finite element numerical modeling technique is used to analyze systematically the distribution features of filed, strain field and plastic zone in the surrounding rock mass of the underground cavities after the excavation

    在巖體結構模型概化的基礎上,采有三維有限元數值分析方法,系統研究了大、高邊墻地下群開挖完成後圍巖的二次應力場、變形場和塑性破壞區的變化特徵。
  4. Therefore, it is very important to study the rock mass quality classification and properly assess the surrounding rock mass stability of a large span and high side wall underground powerhouse. it not only determines the success of the project, but effects the investment and time limit

    因此,圍巖巖體質量及其穩定性評價對于這種修建在復雜巖體中的高邊墻、大地下群來說至關重要,不僅決定地下工程的成功修建,而且決定著工程的安全性和經濟合理性。
  5. Based on the simplified structure of rock mass, flac ( superscript 3d ) numerical modeling technique is used to systematically analyze the distribution features of the secondary stress field, strain field and plastic zones in the surrounding rock mass of the underground cavities after the excavation

    摘要在巖體結構模型概化的基礎上,採用flac (上標3d )數值分析方法,系統研究了瀾滄江某大型水電站大、高邊墻地下群開挖完成後圍巖的二次應力場、變形場和塑性破壞區的變化特徵。
  6. ( 4 ) according to the new methods of dynamic numerical simulation analysis and resting on the engineering geological conditions of surrounding rock mass and the project design, the three numerical simulation results are obtained, from which the author analyze systematically the distribution features of stress field, strain field and plastic zone in the surrounding rock mass of the underground cavities after the excavation and also the variable features of stress field, strain field and plastic failure zones in the surrounding rock mass of the underground cavities in the course of excavation

    ( 4 )按照動態數值模擬新思路,以地下群圍巖的工程地質條件和工程設計方案為依據,系統研究了大、高邊墻地下群開挖完成後圍巖的二次應力場、變形場和塑性破壞區的分佈特徵,開挖過程中圍巖的應力場、變形場和塑性破壞區的變化特徵。
分享友人