洪代河 的英文怎麼說

中文拼音 [hóngdài]
洪代河 英文
honde
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : Ⅰ動詞1 (代替) take the place of; be in place of 2 (代理) act on behalf of; acting Ⅱ名詞1 (歷...
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  1. Abstract : the qiantang estuary with violent hydrodynamic conditions is well known for its tidal bore. the regulation of the estuary in the past, especially the progress since the founding of new china are reviewed. the principles of the regulation and planning of the qiantang estuary formulated in 1960s are expounded, i. e., to narrow the river to reduce the tidal prism, and to increase the ratio of the river flow to tidal discharge. the experience of estuary regulation / reclamation is summarized, especially the engineering measures to protect the groin head and to use polder dykes as sea defense works. finally, the effect is analyzed of the large - scale constraction / reclamation in the estuary on the tides, flooding high water level, estuary bed and the northern deep waterway in the hangzhou bay

    文摘:以涌潮聞名的錢塘江口,動力強勁,破壞力極大.回顧錢塘江口歷治理情況,重點記述1949年以來治理工作的進展,論述60年提出的錢塘江口治理規劃的指導思想,即縮窄江道,減少進潮量,增大山潮水比值的整治原則.總結整治規劃實施過程中治江圍塗經驗,特別是「以圍壩」和丁壩壩頭保護等工程措施.分析錢塘江口大規模治江圍塗后對錢塘江口潮汐、水位、床以及杭州灣北岸深槽的影響
  2. But most prior discoveries of mammoth bones have involved fragments washed down during the prehistoric floods that repeatedly swept across the columbia basin at the end of the ice age

    但是,考古學家表示,很多此前發現的猛獁象骨骼化石中含有史前水沖擊下來的碎片。冰末期的哥倫比亞盆地曾屢次受到史前大水的沖擊。
  3. It is based on the above reasons, the leading system of flood, windstorm, drought control and the construction of water conservancy information engineering and the principle of theory and practicality are combined. based on the continuous development the following contents are researched in this paper : 1. the flood occurred law on major rivers and flood problems and flood control measure

    正是基於這種考慮,本論文結合廣州市三防指揮系統工程和廣州市水利信息化工程的建設,本著理論性與實用性相結合的原則,從可持續發展的角度,重點研究以下內容: 1 、廣州市主要水發生的規律及存在問題與防措施; 2 、廣州市現有防措施的防標準與可靠性; 3 、水預報與調度系統的方法與技術路線; 4 、現管理。
  4. Meanwhile, the flood peak fell off ceaselessly, witch indicates that the new conformation descended greatly

    Sin以上,這比現水時期水位一般上升1 zm左右明顯高。
  5. ( 2 ) in the chapter two, several general plannings of huai river catchment are discussed and successful and failing experiences are also summarized on the flood protection of huai river. ( 3 ) in the chapter three, the executive practice is analysed on the adjusting and regulating planning of huai river middle courses for flood protection

    第二較為詳細地總結了新中國成立以來,淮流域幾次規劃的成功經驗與存在的問題,分析了五十年治淮方略及其骨幹工程為淮奠定的良好基礎;同時指出六十年、七十年治淮工作指導思想中存在的問題。
  6. First the author memorized the yellow river excavation history and concluded development of modern dredging science, and found that most researches of dredging are related to navigation regulation, little used to flood control especially in the yellow river with silty. based on the experiment of generalized physical model of the lower reach of the yellow river, and the study of the loaden flow mechanism and the dredging efficiency, the author get some new ideas as follows : 1

    通過對黃疏浚的歷史以及現疏浚工程學的發展進行了回顧和總結,認為已有的疏浚研究大多基於航道疏浚工程,對于防疏浚特別是在黃這種多沙型流上進行防疏浚的研究極為欠缺,本文基於黃下遊道概化模型試驗,對疏浚挖槽后水沙運動機理及效果等進行了研究,得到以下認識。
  7. After wto accession of china and coming of the new century, global ecology and environment are deteriorating severely. as economy of china continued developing, consumption of natural resources was increasing, the quality of forestry resources degraded, the functions of forest ecology were gradually weakened, disastrous floods occurred in the yangtze river, songhua river and nenjiang river. meanwhile, floods also happened in the hunhe river systems of liaoning province in the 1990s of late 20th century, and droughts in western regions of liaoning have threatened the whole province

    隨著中國加入世貿組織及新世紀的到來,面對全球性生態環境的不斷惡化以及由於我國經濟持續地高速發展,對資源消耗過快過人,使森林資源品質不斷下降,森林維持生態平衡的功能的作用逐漸削弱,不僅我國三江連續發生水,西北乾旱加重,黃多次出現斷流,遼寧在20世紀90的渾水系也曾發生過水災,遼寧西部乾旱日趨加重,已經威脅到整個遼寧。
  8. To prevent flood, adopting non - project measures is feasible and efficient marching measures in recent years in most of counties, adequately utilizing modern science and technology such as computer, information processing, net and communication, system emulation, artificial intelligence and so on to build system that can automatically survey and forecast water information, now plays a important role in grasping the information of rainfall, water and project, in making and selecting preliminary draft of flood control and dispatch, which can greatly raises the efficiency and flexibility of flood control, and has important realistic significance and social economic benefits in minimizing flood disaster

    充分利用現科學技術,如計算機、信息處理、網路和通訊、系統模擬、人工智慧等技術,建立水情自動測報系統,對雨、水、工情的掌握,防調度預案的制定、選擇和實施都有重要的使用價值,可以大大提高防工程措施的防效能和防汛調度的靈活性,對減少水災害具有重要的現實意義和社會經濟效益。鬱江水預報與調度系統內容豐富,主要有: 1 、系統設計; 2 、系統水預報模型; 3 、系統實時校正模型; 4 、系統水演進模型; 5 、系統水庫調度模型。
  9. My love for tsinghua university - in honour of mei yi - qi, the former president of tsinghua university written by wu hong - cheng recently, a professor from the college of education in hebei university, introduces to readers modern higher educationist mei yi - qi and the development of tsinghua university in difficulty from a new point of view and by means of an unique plotting

    北大學教育學院吳成教授的力作《生斯長斯吾愛吾廬清華大學校長梅貽琦》以全新的視角和獨特的構思向讀者展現了現高等教育家梅貽琦校長和在艱難中前進的清華大學。
  10. Prehistoric cataclysms and their impacts on human paleo - culture have been a focus of the scientists in the world. some ancient trees relatively undamaged back, roots and branches were unearthed from paleochannel in the peking university campus. the burying position, the characteristics and the age of the trees indicate that the flowage of ancient yongding river resulted in the event at about 5000a b p. the trees, together with the neolithic culture relic unearthed at the same time, show that the disastrous floods definitely occurred at about 5000a b p in peking area

    史前時期的大水及其對人類古文明的影響一直是中外學者共同關心的問題。北京大學校園內出土的埋藏古樹,其埋藏特徵和測年數據表明它們是5000a b p前後古永定水泛濫的產物,與古樹同時出土的新石器時期文化遺物,提供了水給古人類帶來重大災難的信息。
  11. In 1960s, it was tested to build permeable pile dike at some places along the lower yellow river. however, some stakes were destroyed by flood due to technique limit then, and efficiency was decreased

    在二十世紀六七十年,透水樁壩工程曾在黃下游的局部段做過嘗試性實踐,由於技術問題,在水作用下,不同程度地出現倒樁和斷樁現象,其作用和效果受到一定影響。
  12. Since 1950s, riverbank collapsed, river course changed, inlets and outlets of the river were silted up and the flood pile up one after another

    五十年以來,岸坍塌、航道變遷、引水口及出水口淤積、沿線地區澇災害層出不窮。
分享友人