洪峰滯時 的英文怎麼說
中文拼音 [hóngfēngzhìshí]
洪峰滯時
英文
peak lag- 洪 : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
- 峰 : Ⅰ名詞1. (山的突出的尖頂) peak; summit 2. (形狀像山峰的事物) peak-like thing Ⅱ量詞(用於駱駝)
- 滯 : Ⅰ動詞(使停滯; 使不流通) stagnate; block up Ⅱ形容詞(停滯; 不流通) sluggish; slow-moving; stagnant
- 時 : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
-
According to all the sediment peaks of 35 floods observed at each station on the downstream of xiaolangdi, it analyzes the characteristic of delayed sediment peak and establishes a regression equation between sediment peak lag time for each section of xiaolangdi, huayuankou, jiahetan, gaocun, sunkou, aishan and lijin and peak discharge, sediment concentration of the peak, flood propagation velocity and fall velocity of suspended load of the previous station, which can search, make up and extend sediment peak lag time and provide a basis for accurate forecasting on sediment peak travel time of each station on the lower yellow river
根據小浪底下游各站沙峰均滯後於洪峰的35場洪水,對沙峰滯後於洪峰的特性進行了剖析,建立了小浪底、花園口、夾河灘、高村、孫口、艾山、利津各河段沙峰滯后時間與上站洪峰流量、沙峰含沙量、洪水傳播速度、懸移質泥沙群體沉速之間的回歸方程,可以用來查補延長沙峰滯后時間,為下游各站沙峰傳播時間的準確預報提供依據。Results showed, taking jia - lu - he catchment as example, that the integrated control of soil and water loess could reduce the flood - peak flow and flood water amount, that the flow process has been prolonged and that the peak flow was postponed
提出了水土流失綜合治理對大中流域暴雨洪水影響的研究方法。以佳蘆河為例,分析表明:水土流失綜合治理使暴雨洪水的洪峰流量、洪水總量降低,洪水過程持續時間延長,洪峰滯后。
分享友人