洪扎 的英文怎麼說

中文拼音 [hóngzhā]
洪扎 英文
honza
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : 扎動詞[書面語] (拔) pull out
  1. The results showed that : the integrated ecological risk was presented symmetrically along brahmaputra, and was mitigated from valley farming area to mountain pastoral area ; the hazards of main risk sources to risk suffer in each sub - region was differently, drought was the common risk source and imperils farming and stock raising severely ; aimed at enhancing the ability of fighting drought, controlling flood and stabilizing sand engineering measures should be taken steps to prevent those hazards ; mountain hazards must be controlled in resident area and along arterial traffic ; manual work should be done to void hail in those area where hails attacked heavily ; there is need to promulgated risk knowledge to herdsmen for strengthening their risk consciousness and improve the ability of preventing risk and self - help after hazards happened in the pasturing area

    囊縣綜合生態風險沿雅魯藏布江呈現對稱型分佈,並由河谷農業區向高山牧業區逐漸降低;各亞區的主要風險源對風險受體的危害強度差異較大,乾旱是共同的風險源,造成的農牧業生產損失最為嚴重;抗風險措施主要有在河谷地帶採取工程措施以提高抗旱、防和固沙能力,在半山臺地加強治理居民點及交通沿線的山地災害,在多雹區進行人工消雹;在高寒牧區向牧民傳播風險知識,以加強其風險意識,提高規避風險和災后自救能力。
  2. The main places of interest of yili prefecture are : the bell and drum tower in huiyuan city ; the guhuangqu drangon entrance ; the ruins of the gold - roofed temple and the mohe old city ; the suchan waisihan mazar ; the ancient city of hainute ; the shengyou temple ; the xiaohongnahai stone figure ; the xiata village culture scenery ; the abureleshan rocks ; the tangbula hot spring scenery ; the qiaxi tour scenery and the nalati grassland, etc. with the reform policy of our central government " open to the west ", yili prefecture has become an attractive commercial place and also a traveling resort

    主要名勝古跡有惠遠城、古皇渠龍口、金頂寺遺址、磨河城遺址、速擅歪思汗麻、海努古城遺址、聖佑廟、小那海石人、夏塔古文化風景區、阿布熱勒山巖畫群、唐巴拉溫泉風景區、恰西旅遊風景區、那拉提大草原等。伴隨著西部大開發的進行,伊犁地區以她獨特的地理環境和人文環境,已成為邊貿和旅遊熱點。
  3. It also used to prevent or solve geologic calamity, such as landslide and rock collapse etc. in addition, it is also used for drilling small size water wells and high - pressure jet grouting holes. it has been already widely used in various projects such as water power stations in yunnan, guangxi, sichuan and hubei provinces. it has also become the first priority machine for medium - duty anchoring - reinforcing projects in china

    在雲南小灣廣西灘糯渡及景水電站,長江上游的溪洛渡水電站向家壩水電站金安橋水電站,烏江上的家渡水電站構皮灘水電站,黃河上的拉西瓦水電站公伯峽水電站,雅江上的錦屏水電站已經大量使用, yg - 80型錨固鉆機已成為國內水電站巖土錨固工程中的主力機型。
分享友人