洪水河床 的英文怎麼說

中文拼音 [hóngshuǐchuáng]
洪水河床 英文
high water river bed
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : i 名1 (供人睡覺的傢具) bed; couch 2 (像床的器具、地面) something shaped like a bed Ⅱ量詞(用...
  • 洪水 : waterflood; deluge; flood; flowage; torrent; spate; flood water; [義大利] acqua alta洪水泛濫 floo...
  • 河床 : riverbed; bed; poised river; [英方] waterstead; cauce
  1. At first, this paper analyzes the factors of water - sand influencing water level of yellow river and the feasibility just using the factors of water - sand to study water level, and collects the corresponding data ; secondly, because there are strong nonlinear relation in the corresponding data, by meticulous theory analysis, this paper integrates basic nonlinear analysis method, theory of random analysis, method of least squares and so on. it puts forward a method which can get the high accuracy simulation of the data, perfects the multi - factor analysis of variable ( over three factors ) of the statistic ; thirdly, it applies the method to the approximation of corresponding water level process which belong to the capacity of sand of middle - high and middle - low, and get the high - accuracy simulation about the typical nonlinear relation ; at last, this paper definitudes the main influence mode that the capacity of sand. it mainly unite with other factors to work on the water level in the yellow river lower reaches ; mor eover, this paper analyzes the difficult point and the direction of improvement to realize the accuracy forecasting of the flood level of erodible - bed channel

    首先,系統分析了影響黃位的沙因素,及僅用沙因素有效研究位的可行性,並按變量對應思想採集它們的相應數據;其次,由於相應位過程數據中含極強的非線性關系,本論文經細致的理論分析,將基本的非線性分析方法、統計建模方法、隨機分析理論、最小均方誤差原則等等數學理論及方法有機揉合,提出了能有效實現這類數據高精度擬合的分層篩選法,並改進了統計學中多因子(三個以上)方差分析法;再次,將這一方法用於黃中高及中低含沙類相應位過程的擬合,實現了這一典型非線性關系的高精度擬合,各年汛期上下游相應位過程的擬合誤差都較小;最後,明確黃下游含沙量對位的主要影響方式,即含沙量主要是與其它因素聯合對位作用;另外分析了要實現變動位過程準確預報的困難所在及改進方向。
  2. Sediment deposited by flowing water, as in a riverbed, flood plain, or delta

    沖積層淹沒的平原或三角洲中的流淤積所產生的沉積層
  3. Abstract : the qiantang estuary with violent hydrodynamic conditions is well known for its tidal bore. the regulation of the estuary in the past, especially the progress since the founding of new china are reviewed. the principles of the regulation and planning of the qiantang estuary formulated in 1960s are expounded, i. e., to narrow the river to reduce the tidal prism, and to increase the ratio of the river flow to tidal discharge. the experience of estuary regulation / reclamation is summarized, especially the engineering measures to protect the groin head and to use polder dykes as sea defense works. finally, the effect is analyzed of the large - scale constraction / reclamation in the estuary on the tides, flooding high water level, estuary bed and the northern deep waterway in the hangzhou bay

    文摘:以涌潮聞名的錢塘江口,動力強勁,破壞力極大.回顧錢塘江口歷代治理情況,重點記述1949年以來治理工作的進展,論述60年代提出的錢塘江口治理規劃的指導思想,即縮窄江道,減少進潮量,增大山潮比值的整治原則.總結整治規劃實施過程中治江圍塗經驗,特別是「以圍代壩」和丁壩壩頭保護等工程措施.分析錢塘江口大規模治江圍塗后對錢塘江口潮汐、位、以及杭州灣北岸深槽的影響
  4. We shall have to widen out the river bed to avoid flooding

    我們將加寬以防
  5. Dig jade is it leave riverbed in river valley terrace, do beach to refer to, ancient river and alluviation, diluvian gravel that fan have dig seeking and d jade gravel of the layer in front of the mountains the jade of these places is brought by the flowing water too

    挖玉是指離開谷階地干灘古道和山前沖積積扇上的礫石層中挖尋和闐玉礫。這些地方的玉也是由流帶來的。
  6. Fairly utilizing the flood resources of the yellow river can achieve the objectives of " no dyke breaches, no depletion, no pollution exceeding the standards and no rising of the river bed " and keep the healthy life of the river

    利用好黃資源,可實現「堤防不決口,道不斷流,污染不超標,不抬高」的目標,從而維持黃的健康生命。
  7. Many geological and hydrological factors of the river section, where the yellow river water intake engineering is laid out, such as the capacity of the reservoirs along the river section upstream and downstream, the rate of the flow discharge, the erosion and silt of the watercourse, the form of the riverbed and the water current, ice tuck, the convergence of the upstream branches of the river section, flood crest, sand crest size, the capacity for flood discharge of the watercourse, the effect of flood control structure around and the impacts on surrounding environment and the third person " s legitimate rights and interests, should be considered

    工程的布設要考慮工程所處段的地質文等諸多因素。如該段上下游庫的庫容,泄流量、道沖刷、淤積、形態、流形態、冰塞、段上游的支流匯入、峰、沙峰的大小、道行能力的大小、周圍防工程的影響及對周圍環境和第三人合法權益的影響等等。
  8. Because the yili river belongs to plain broad and shallow moving river, the main channel changes greatly and swings to a large range, which leads to river crooked branching river type and s curved, many fork rivers, the river continent and the river beach in river center, alluvial shoal and beach. the width in some section of the river is up to about 3800m. in flood season it causes serious harm to farmland, factories, residents along two sides

    由於伊犁屬于平原游蕩性寬淺流,主槽變化不定,擺動幅度極大,道多呈彎曲分叉型和s型彎道、多叉心洲,心灘和沖擊淺灘及邊灘,部分寬度達3800m ,季節對道兩岸的田地,工廠,居民等造成極大的危害,素有「三十年東,三十年西」之稱。
  9. Catching jade ore malachite fragment after weathering and erosion bring the flood into the river originally at the mountain, is it pour but lay to carry by river and then, reach low mountain and mountain forebay lead because the velocity of flow is sharply reduced, the malachite is piled up in river shoal and riverbed

    夏季冰雪融化瀑漲,流洶涌澎湃。山上的原生玉礦經風化剝蝕后的玉石碎塊由帶入流中,再由攜帶奔流而下,到了低山及山前地帶因流速驟減,玉石就堆積在灘和中。
  10. In the course of north moving, weihe river downcut clearly and the riverbed of weihe river descended about 6. 3m because of the ascending of the new conformation

    在北遷過程中,由於構造上升,流下切明顯,下降約6 3米,相應的位也不斷的下降,指示新構造運動發生了強烈上升。
  11. The dissertation focus on the main conflict of flow and sediment change, by analyzing the flow and sediment features, and change in rivercourse of typical period in histry, collecting the data of riverbed change. according to the flow and sediment change condition, combining the existed water works, and based on the results of former researches, the study are conducted on the law of flow state change by comparing rivercourse conditions before and after the completion of sanmenxia project, which may provide some idea for flow state change when xiaolangdi project completed and put into operation and some basic clue for the prediction of variation trend of river section from tiexie to shendi, from shendi to tieqiao near zhengzhou, from tieqiao near zhengzhou to dongbatou, from dongbatou to gaocun and so on in the year 2010 and the period 2010 to 2020. the result may provide some reference for flood control of these wangdering river sections, and some guidelines for planning of water projects and arrangement of project sequence

    本課題緊緊抓住小浪底庫運用后沙變化這一主要矛盾,通過分析研究以往典型時期的沙特點和道演變特點,收集分析邊界條件變化資料,小浪底庫運用后沙資料變化,結合現有道整治工程建設情況,總結前人的研究成果,重點研究三門峽庫運用後下遊勢變化的規律和特點,探索小浪底庫運用後下遊勢變化情況,分析預測游蕩性道鐵謝至神堤、神堤至鄭州鐵橋、鄭州鐵橋至東壩頭、東壩頭至高村等各個段在2010年, 2010年至2020年期間的勢變化趨勢,為分析游蕩性段的防形勢,指導道整治工程建設的規劃和工程安排提供決策參考和依據。
  12. Phenomena of the yellow river 96 8 ' flood and thoughts to harness lower reaches

    現象及下遊整治思路
  13. There is sharp gradient in top and small gradient in bottom. the ability of removing flood is high in top and it is small in bottom correspondingly. sediment silt up continually, so the bed of river is jacked up year by year and become the famous river on land

    由於泥沙含量高,現行道已行140餘年,山東段上寬下窄,坡度上陡下緩,排能力上大下小,在泥沙淤積作用下,逐年抬高,成為世界上著名的地上「懸」 。
  14. Two major factors contributed to devastating summer flooding along the yangtze river and its tributaries. first, erosion resulting from excessive deforestation in the upper reaches of the river and, second, heavy silting which raised the riverbed in the main channel

    兩個主要因素導致了夏季長江及其支流的特大。第一,過度砍伐引起的流上游的侵蝕,第二,嚴重的泥沙淤積抬高了主幹道的
  15. Impact of flood events from different source areas on channel transects adjustment at the wandering - braided reach of the lower yellow river

    不同來源區對黃下游游蕩橫斷面形態調整過程的影響
  16. The plane scale of model was 500, vertical scale was 60 and varied ratio was 8 : 33. the contrast trial. utilizing trial of long series and typical flood test have been conducted

    東莊利樞紐渭下遊道動物理模型選定平面比尺為500 ,垂直比尺為60 ,變率為8 . 33 ,在此模型上進行了庫運用對比試驗、長系列運用試驗以及典型試驗。
  17. Abstract : for high arch dams in valleys with the characteristics of high water head, large discharge and large power, the problems of energy dissipation and scour prevention are serious. based on scientific studies, new comprehensive measures are proposed, including dispersion of discharge to waken wallop of the current, and reinforcement of riverbed to enhance the erosion - resistance. the measures can be used to solve the problem of energy dissipation properly. a typical layout scheme has been proposed in which slotted bucket with diversion teeth, double deck with pores, and cushion pool are considered practice has proved that the scheme is reliable and the effect of energy dissipation is obvious

    文摘:高拱壩泄消能的特點是壩高落差大,流量大,功率大,位於谷狹窄地區,泄消能與防沖問題突出.經科學研究,採用「分散泄,削弱流沖擊力,加固,增強道抗沖能力」的綜合治理措施,較好地解決泄消能布置問題.提出了表孔大差動坎加分流齒、雙層多孔、流撞擊、下設墊塘聯合消能的典型布置方案,經實踐證明,方案可靠,消能效果好
  18. Especially for resent years, because the conditions of coming discharge and sediment have occurred un - corresponding variation, shrink ' s velocity increases serious rapidly, shrink ' s characters tend to be serious, the river bed have been heightening continuously, from these, they have lead to various disaster effects obviously and brought heavy pressure for flood control and river harnessing

    下遊道為嚴重的萎縮性道。尤其是近年來,由於來來沙條件發生非協調性變異,萎縮速率明顯加快,萎縮性更趨嚴重,持續抬高,由此引起的各種災害效應愈加明顯,對防道治理產生巨大壓力。
  19. Self - abandoned, relaxed, and effortless, i seemed to have laid me down in the dried - up bed of a great river ; i heard a flood loosened in remote mountains, and felt the torrent come : to rise i had no will, to flee i had no strength

    我自暴自棄,渾身鬆弛,百無聊賴,彷彿躺在一條大乾枯的上,我聽見從遠山奔瀉而來,我感覺到激流逼近了,爬起來吧,我沒有意志,逃走吧,我又沒有力氣。
  20. After the flood discharges in 1995, parts of downstream channel is silted up in taiping wai powerstation. it raises the water lever, and decreases the work of generating unit

    由於太平灣電廠尾道在遭遇大後部分淤積,壅高了電站的尾位,影響機組出力。
分享友人