洪水閘 的英文怎麼說

中文拼音 [hóngshuǐzhá]
洪水閘 英文
flood gate
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : anchor gate
  • 水閘 : water gate; water lock; penstock; dam; sluice; pen; sasse; canal-lock
  1. By hydraulic modeling, this paper describes studies on the stability of a floating bulkhead operating in standing water and flowing water, and it ' s hydrodynamic stability characteristics that distinguish in standing water from in flowing water ; and direct measurements of the forces acting on the model floating body during floating and sinking is taken. as a result, the rotation stress curves are produced and analyzed ; to provide data for optimum operation schedule analyses of the sluice, the relationship of the impact forces acting on the side wall of the gate and the running speed is studied ; the reasons of unstably uplifting of the bulkhead are discussed and the method to solve the problem is also given in this paper

    本文結合常州新控制工程工模型試驗,系統分析了浮箱門在靜和動中的穩定性及其影響因素,指出靜穩性和動穩性的不同特點;試驗測定了浮箱門動運行時的受力情況,給出並分析了定位過程轉動力的變化過程曲線;根據浮箱門啟閉速度與門體和岸墻之間撞擊力大小的關系,選擇合理的動力設備,為設計和工程實踐提供可靠依據;分析浮箱門難以穩定上浮的原因,並給出解決方案。
  2. You can ' t just stop up the floodgate

    滔滔可關不上
  3. Another sluice gate keeps floodwater out of the lake

    另一門使致流入湖內。
  4. So as the enter point of the stream, the income of the reservoir, the time of the flood peak lasted, the quantity of sandiness income and the strobe of the darn. we must do some work to forecast and watch the different density stream. by experiments, we made out that it is impo rtant for us to reduce the water lever in work of the river belongs lots of sandiness

    從異重流試驗看,在正常運用下,庫產生泥沙異重流的機率較大,能否運動到壩前排出庫外,還要看異重流潛入點位置、入庫流量、峰歷時、入庫含沙量、門運用等因素,需要做好異重流預報監測工作。
  5. The sluices had already been opened, and with every day the floods were spreading.

    已經打開,逐日奔流。
  6. Article 37 no unit and individual may damage, occupy or destroy flood control works such as dams, embankments, sluices, bank revetments, pumping stations and drainage systems, hydrological and communications facilities and standby apparatuses and materials for flood control

    第三十七條任何單位和個人不得破壞、侵佔、毀損庫大壩、堤防、、護岸、抽站、排渠系等防工程和文、通信設施以及防汛備用的器材、物料等。
  7. In an actual case of the numerical modeling on the flood of both the north branch and the mid - downstream of daqing river in haihe river hasin, the flood is simulated with one - dimensional model, in which flood regulation of the retarding basin, the discharge gate control and the infiltrations of the northern rivers are considered

    在海河流域大清河北支及中下遊河道數值模擬的實際工作中,應用了一維河網模型進行的模擬計算,並根據實際情況加入了蓄滯區調度、泄控制調度以及近年來北方河道入滲的特點等條件,計算效果良好。
  8. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善堵口工程龍口力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港、計算時段的變化、多口門、多庫容、多)的龍口力計算,並進行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍口力要素最大值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口力計算,為堵口合龍提供科學依據。
  9. The main work is done with the help of model experiment. in the flood - relief experiment, the flood carrying capacity of spillway tunnel is checked. in the hydraulic experiment of the diversion power conduit system, the followings are studied : the flow condition and fluctuation in the surge chamber, the distribution of flow velocity before the rack in the surge shaft, the amplitude of stage in the quick gate bay etc. the test step, content and results of different proposals are introduced in details

    本項優化試驗研究的目的主要在於,通過泄系統整體力學試驗,校核泄洞的泄流能力;通過發電引系統整體力學試驗,研究調壓井內流流態和位波動情況、調壓井內攔污柵前流速分佈情況;確定快速門井內位波動幅度;試驗確定壓力管道擊壓力穿井系數以及泄洞弧形門處的壓力。
  10. Reconstruction of supervisory control for release floor water in wanan hydropower plant

    萬安電廠泄監控改造
  11. The dynamic - instability of radial gate was always due to the instability of arm under dynamic loading action, the security of gate spillway was dominated by the dynamic stability of arms

    摘要弧形門的動力失穩往往是由於支臂在動力荷載作用下喪失動力穩定的,支臂的動力穩定與否控制著整個的泄安全。
  12. In addition, water control projects such as gates, pumps, polders and dikes spread all over the basin. all these bring more difficulties to scheme making for flood broadcasting and prevention as well as disaster reduction

    再加上流域內工控制建築物(,泵,圩,堤等)星羅棋布,給流域內預報和防汛減災方案的編制帶來了一定的難度。
  13. Combined with the existing problems of the national key project - linhuaigang flood - control project, this paper systematically studied the theories of sluice structures design foundation model modern calculation methods of both plane and spatial sluice structures ; at the same time, static and dynamic analysis of he spatial structure of the jiang tang lake ' s flood - entry sluice was studied using the finite element method

    本論文結合國家重點利工程臨淮崗控制工程中遇到的實際問題,系統地研究了結構的設計理論、地基模型、平面和空間結構的現代計算方法;並對姜塘湖進空間結構進行了有限元靜動力計算分析。
  14. The sluice ' s fuzzy flood control system is designed by taking the fuzzy decision making system for flood control operation of sluices on a y - river as an example

    摘要以三汊河道調度模糊決策為例,設計了調度模糊系統。
  15. Results show that the decision making of sluice ' s flood control operation based on fuzzy logic has advantages of rapid response, ability to well utilize operation experience and adaptability to unstructural problems

    結果表明,基於模糊邏輯的調度決策方法,具有決策響應速度快、可以利用調度經驗知識、適應非結構化等優點。
  16. Shankou spillway project has many specific characteristics, for example, the gate frusta and weir body have equivalent thickness, the weir body is low and have corridor, the foundation of the weir body is " high - low foot " " and the side frusta is also used as retain wall. in view of the characteristics, to better analyze the stress distribution on weir body, gate frusta, the joints between gate chamber and weir body, under the condition that the gate chamber is applied with asymmetrical loads and complicated constraints, three dimensional finite element method is applied in this paper

    本文針對山口溢墩與堰體底板厚度相當,堰體為低堰且設有廊道、堰體建基面「高低腳」及邊墩兼作擋土墻等具體特點,在室設計中采山口利樞紐工程溢室三維有限元整體應力計算分析用三維有限元整體應力計算方法分析室的受力狀態,分析室在荷載不對稱。
  17. It is necessary to plan flood control and waterlogged elimination, calculate and analyse the size of water gate, as well as to bring forward the reasonable and feasible running way

    要解決好圍塗工程中的防除澇問題,必須做好全流域范圍內的防除澇規劃和圍區規劃工作,計算、分析並確定規模,最後提出合理可行的運用方式。
  18. According to the flood dispatching rules of shiquan reservoir, coordinated with the open - close program of the gates, the flood operation rules model is designed and developed, thus guiding the operation of the reservoir. ( 5 ) the study and development of real - time flood dispatching

    根據石泉庫的調規則並結合門啟閉程序開發設計調規則模型,以此指導庫運行; ( 5 )實時調度系統的研究與開發。
  19. Weiyuan lake : perfect mix of form and function the automatic watergate in weiyuan lake the chinese university has the largest campus in hong kong at 134 hectares

    未圓湖以不銹鋼及強化玻璃製成,有四個排位,利用感應器開關,可調節湖位高低。
  20. Based on characteristics of middle and upriver drainage areas of a river in our country, this paper analyzes and studies some hydrological information and draws a conclusion of floodgates, flood prevention standards and structure safety requirement are adopted as premises and compositive parts of floodgates are studied from an economical point of view. an economical and reasonable structure type was selected as an optimization

    本文根據我國某河流中上游流域特徵,通過對該流域文等資料進行分析與研究,得出在該河流建設的結論,本文在的結構布置設計中,以結構布置滿足防標準及結構安全要求為前提,以經濟角度對的各組成部分進行方案研究與優選,選出經濟合理的結構型式。
分享友人