流水抵抗 的英文怎麼說

中文拼音 [liúshuǐkàng]
流水抵抗 英文
hydrodynamic resistance
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 動詞[書面語]1. (拍) strike2. (打擊) beat3. (拋擲) throw
  • : Ⅰ動詞1 (抵抗; 抵擋) resist; combat; fight 2 (拒絕; 抗拒) refuse; defy 3 (對等) contend with...
  • 流水 : 1 (流動的水) running water; stream2 (舊時指商店的銷貨額) turnover (in business)流水搬運作用...
  • 抵抗 : resist; stand up to; oppose; resistance
  1. The phenomena can be observed in the tests low seepage pressures can easily form passageways behind the waterproof layer if there is no drainage layer or the drainage layer is blocked in the single - shell test slab ; the waterproof layer can resist higher seepage pressure if there is no drainage layer or the drainage layer is blocked in the double - shell test slab ; the seepage water can be controlled and drained away in the drainage layer by the water proof layer only if there is unblocked drainage layer behind it in the double - shell test slab

    由試驗可見,在單層試驗板中沒有排層或排層不通暢時,較低的壓就能在防膜后形成滲通路;在雙層試驗板中沒有排層或排層不通暢時,防膜能一定程度的滲漏壓;只有在雙層試驗板中的排層暢通時,防膜才能有效地將滲漏控制在排層中排走。
  2. Migratory waterfowl ( most notably wild ducks ) are the natural reservoir of avian influenza viruses, and these birds are also the most resistant to infection

    遷移性禽(主要是野鴨)是禽感病毒的自然宿主,這些鳥類對感染力最強。
  3. He believes that by redirecting air or water flow, his globe can decrease resistance, significantly speed up moving objects and save energy

    他認為,通過重新空氣或量,降低了地球大大加快移動物體和能源節約
  4. Chinese seismic design code has adopted the popular seismic design concept in the world, that is, using reasonable combination of " seismic design force - ductility grade " and the concept of " capacity design " to set up an ideal energy - dissipation mechanism behaving inelastic dynamic response characters to resist given seismic intensity

    中國建築震設計規范采納了當今世界各國主震設計思想,即以合理的「設計地震力- -延性等級」的組合和「能力設計( capacitydesign ) 」的思路來構架具有合理的非線性地震響應特徵的耗能機構禦預定準的地震作用。
  5. ( 5 ) according to the calculated average section velocity. we can decide the type of the revetment. ( 6 ) when the scour hole depth of the dam head and trail parts is calculated inthe paper. we can validate whether the revetment material is strong enough to resist the degradation of the flood flow

    根據以上計算所得的各斷面平均速,初步確定需要鋪設的摘要護面類型計算在鋪設護面以後壩首和壩末的沖坑深度,以驗證護面材料是否可以的沖刷。
分享友人