流量率 的英文怎麼說
中文拼音 [liúliánglǜ]
流量率
英文
flow rate-
The evaluation of uncertainty of ac powermeter
交流功率表測量結果不確定度的評定If the coefficient of engagement overlap decreases, the flow aggrandize, trapping volume and the flow pulsating ratio decreases
隨著齒輪嚙合重合系數的減小,齒輪泵的流量增大,困油容積和流量脈動率減小。The thesis mainly study the technology of atm lan in - country and overseas, and with the key of qos. with the anatomist object of lan emulation and ip over atm, fouse on expatiate strategy which discussed from three aspect : emulation bridge in lan emulation, the setting of priority in ip over atm, the currency control of flux. at last, this paper set out the ascendant capability of the new strategy with the tool of probability and randomization
本文主要在分析國內外在atm局域網技方面的最新研究成果的基礎上,以服務質量( qos )為主線,以atm模擬局域網技術和ipoveratm技術為剖析對象,系統地闡述了在模擬網橋、優先級設置、通用流量控制方面的改進策略並使用概率和隨機過程工具初步展示了新策略優越的性能。Also a refined - pulp quality predictive model, with specific energy, specific load as the model inputs, and beating degree, wet weight as the model outputs, is presented. simulation results show that the models can be acted as theoretical bases for the automatic control of high - consistence pulp refining process
即,建立了以原漿流量、白水流量、盤磨機功率為輸入變量,比能量、比負荷、濃縮機漿位為輸出變量的動態模型,以及基於比能量、比負荷的成漿質量預報模型。Fourthly, according with the analyzing of flow measurement, we research the main problems needed to be solve in the process of measurement, such as analysis and measurement of the internal resistance, selection of excitation frequency, stable signal datum mark and restraining common mode interference, restraining for serial mode interference and working frequency interference ; transporting and shielding the flow signal, constant current excitation and magnetic field equalizing, flow measuring
第四,根據對流量測量問題分析的,深入研究了設計過程中需要解決的主要問題。如內阻分析與測量;勵磁頻率的選擇;穩定信號基準點與抑制共模干擾;串模干擾與工頻干擾抑制;流量信號傳輸與屏蔽;恆流勵磁與磁場補償;流量測量點的選擇等。Discount rates used in cashflow analysis for public works
用作工務工程的現金流量分析的貼現率We need to keep the fiscal reserves at a satisfactory level to meet the cash flow needs of the government in its day to day operation ; to cope with contingencies arising from any downswing in the economic cycle and from unforeseen external events ; and to underpin the stability of the exchange rate for the purpose of enhancing monetary stability
我們需要把財政儲備維持在適當水平,以應付政府日常運作上的現金流量需求;在經濟周期回落或外圍出現突發事件時應急,以及支持匯率,以維持金融穩定。This paper supplied a new way through variable frequency variable speed ( vfvs ) to change its output flow rate and adding a constant - pressure - drop valve, which could solve the defects in hydraulic pressure servo control system, such as low efficiency in control system, short life, poor ability in resisting pollution, low efficiency in driving system and flow rate, pressure pulse. and this way was proved to be effective
本論文針對傳統伺服控制系統效率不高、元件壽命短、抗污染能力差、驅動系統效率低、存在流量及壓力脈動等缺陷,利用先進的交流變頻調速技術改變液壓泵轉速的容積調速新方法,提出了在液壓系統中加一個定差減壓閥的新思路,較好地解決了液壓伺服系統存在的上述問題。In consideration of the crises of both the industrial water and the domestic water in the estuarial areas of the yangtze river caused by the decrease of the channel runoff and the intrusion of the sea water during the dry season in dry year, the concept, method and planning framework of the water resources allocation for the areas mentioned above along the main stem of the river are put forward herein based on the preliminary prediction of the future water demands by taking the water resources allocation therein during the dry seasons as the actual case in combination with the status quo of the water environment and water resources utilization concerned
摘要針對枯水年枯水季,因河道徑流量較少,鹽水入侵的頻率和強度顯著提高而引起的長江河口沿岸地區生產生活用水安全,文中結合長江口地區水資源利用和水環境現狀,以大通以下長江幹流地區在枯水季水量分配為實例,在初步預測未來河口地區水資源需求的基礎上,提出長江口地區水資源配置的思路、方法及方案框架。So anew type of measurement and instrumentation is badly needed and developed which is suitable for non - centralized and stationary measurement based on this idea, this study take the new type of oilavater two - phase flow measurement and instrumentation development as the basic goal, cany out some theoretic exploration of measurement in order to improve oil / water two - phase flow well logging method and technique, and try to accomplish bom holdup and total flow rate measurement with one equipment simultaneously so as to push forward development of oilavater two - phase flow well logging
本文正是基於這一思想,以開發新的油水兩相流測試儀器為目標,進行先期的測量理論探索,試圖從原理上改進油水兩相流測井方法和工藝,實現利用同種電學敏感原理同時完成持率和總流量的測量,推動油水兩相流測井技術的發展。( 1 ) it was found from the obtained results that increasing of flux will led to decrease in froude no. of the following water at the shrinking section which will reduce rate of disspated energy, this will make the protection of dam surface more difficult
主要結論如下;隨著流量的增加,消力池收縮斷面弗勞德數減小,消力池的消能率減小。壩面平均流速增大,壩面的防護難度增加。The mass outflow rate minus the mass inflow rate is equal to the time rate of change of mass storage in the parallelepiped.
質量的流出率減去質量的流入率等於貯存在這個平行六面體中的質量的時間變化率。In the past, young staff of jones lang laselle were emotional and job hopping fast
仲量聯行過往聘用的年輕員工,都較情緒化,流失率偏高。Firstly, the status of our nation ' s water resources, flood and arid hazards is overviewed to illustrate the necessity for study on dynamic control of flood season limited water level. disadvantages in traditional limitsd water level design, static control of limited water level design, static control of limited water level and fuzzy limited water level curve are pointed out, and mending methods for these are introduced. dynamic control and its key problems are analyzed hi next section. the allowable range of limited water level is determined, so as the allowable extreme risk index. the definition of extreme risk is re - illustrated, risk analysis methods in reservoir operation is discussed either. according to the definition of extreme risk rate, the allowable extreme risk rate of reservoir is systematically demonstrated with variant extreme risk indexes and flood season limited water level
本文首先闡述了我國水資源狀況和水旱災害、說明水庫汛期限制水位動態控制研究的必要性;介紹了傳統汛限水位設計、汛限水位靜態控制、模糊汛限水位過程線存在的問題及其初步改進方法;分析汛期限制水位動態控制的方法及關鍵問題;進一步闡述了水庫極限風險率的定義;根據極限風險率定義,詳細敘述了不同極限風險指標時、不同汛期限制水位下起調,水庫所能承受的極限風險率計算方法。然後,基於極限風險率計算方法,以白石水庫為背景,研究「考慮壩體自身安全、考慮壩體安全與下游防護對象控制下泄流量的汛限水位動態控制的極限風險率」 。Using jgp560c magnetron sputtering equipment, cu / ag film are deposited on cd1 - xznxte substrate by dc magnetron sputtering in order to get the influences of the main experiments parameters such as sputtering power, gas flow, vacuum air pressure, magnetoelectricity power and substrate temperature on deposition rate of film, discovered that dc sputtering power is the most key factor influencing the deposition rate
在jgp560c型超高真空多功能磁控濺射鍍膜機上,採用直流磁控濺射法在cdznte晶體上制備出cu ag合金薄膜,揭示了氣體流量、直流濺射功率、勵磁電源功率、工作氣壓和襯底溫度等工藝參數對沉積速率的影響規律。結果表明濺射功率對沉積速率的影響最大,隨濺射功率的增大沉積速率快速增大。Standard test method for melt flow rates of thermoplastics by extrusion plastometer
使用擠壓式塑性計測定熱塑塑料的熔融流量率的標準試驗方法So as the enter point of the stream, the income of the reservoir, the time of the flood peak lasted, the quantity of sandiness income and the strobe of the darn. we must do some work to forecast and watch the different density stream. by experiments, we made out that it is impo rtant for us to reduce the water lever in work of the river belongs lots of sandiness
從異重流試驗看,在正常運用下,水庫產生泥沙異重流的機率較大,能否運動到壩前排出庫外,還要看異重流潛入點位置、入庫流量、洪峰歷時、入庫含沙量、水庫閘門運用等因素,需要做好異重流預報監測工作。Rotodynamic pumps - coolant pump units for machine tools - nominal flow rate, dimensions ; german version en 12157 : 1999
旋轉泵.車床的冷卻業泵組.公稱流量率和尺寸Standard test method for volumetric and mass flow rate measurement in a duct using tracer gas dilution
用示蹤氣體稀釋法測量管道中體積和質量流量率的標準試驗方法Only qualified personnel are authorized to by - pass this locking system for flow rate checks
只有合格人員才被允許繞過制動系統進行流量率檢查?分享友人